Loading...
HomeMy WebLinkAboutAgenda Report - August 5, 2015 C-03AGENDA ITEM C 3 &1& CITY OF LODI %W COUNCIL COMMUNICATION TM AGENDA TITLE: Approve Plans and Specifications and Authorize Advertisement for Bids for Michael David Winery Force Main Project MEETING DATE: August 5, 2015 PREPARED BY: Public Works Director RECOMMENDED ACTION: Approve plans and specifications and authorize advertisement for bids for Michael David Winery Force Main Project. BACKGROUND INFORMATION: This project consists of trenching and installing approximately two miles of eight inch force main and other incidental and related work, all as shown on the plans and specifications for the project. The alignment of the force main is presented in Exhibit A. Currently, Michael David Winery (Winery) production levels require approximately one million gallons of winery wastewater to be conveyed via tanker truck to the White Slough Water Pollution Control Facility (WSWPCF). Since typical transport trucks can carry approximately 6,500 gallons, installation of the proposed facilities will eliminate the need for approximately 150 truck trips per year. On November 19, 2014, Council authorized the City Manager to execute a Winery Waste Water Pipeline Agreement (Agreement) with the Winery. The Agreement authorizes the discharge of up to 10 million gallons of winery wastewater to the WSWPCF by connecting to the City's industrial waste outfall pipeline and, thereby, eliminating up to 1,500 truck trips per year. The Agreement requires the Winery to pay all costs associated with the planning, designing, environmental review, construction and operation, and maintenance of the proposed pipeline, along with a surcharge of 150 percent for service outside the City limits in accordance with Lodi Municipal Code Section 13.12.150. The work will be performed under an encroachment permit from San Joaquin County Public Works Department. The plans and specifications are on file in the Public Works Department. The planned bid opening date is August 26, 2015. The project estimate is $1,500,000. FISCAL IMPACT: None. All associated design, construction and maintenance costs will be reimbursed by the Winery. APPROVED: phen Schw'�Itrguer, City Manager KAWP\PROJECTS\SEWER\Michael David Winery\WashWater Forcemain Project\CPSA.doc 7/20/2015 Approve Plans and Specifications and Authorize Advertisement for Bids for Michael David Winery Wash Water Force Main Installation Project August 5, 2015 Page 2 FUNDING AVAILABLE: Funding will be identified at project award. 4'j L"�' J-/,71 ,(_ F. Wally S e In Public Works Director Prepared by Lyman Chang, Senior Civil Engineer FWS/LC/tb Attachments cc: City Engineer Senior Civil Engineer Utility Superintendent Michael David Winery KSN Inc. K:\WP\PROJECTS\SEWER\Michael David Winery\WashWater Forcemain Project\CPSA.doc 07/20/2015 3 � a� a � Banner Sty Ci u 0 C 3 C � o� s Hwy. 12-� moi/ Fm ` Mic ael David Wine De-Bo- =Rd ggi Kindgdon=Rd. Kingdon=Rd: �a16 v O o: ami - Id a � T N � �O W Or Z 44 Harney -L -n. 0 c� o• v rb H N TcedwayAd. Connect to Ex 33" IW I� Legend Proposed Washwater Force Main --• Ex Wastewater Pipe CITY OF LODI Winery Washwater Pipeline Project 0 0.125 0.25 0.5 m X D N W*1 E S 0.75 1 Miles Path: K:\DESIGN\Projects\Michael David Winery\Base_Map.mxd