Loading...
HomeMy WebLinkAboutAgenda Report - July 15, 2015 C-088 AGENDA ITEM cam CITY OF LODI COUNCIL COMMUNICATION TM AGENDA TITLE: Adopt Resolution Awarding Contract for Shady Acres Pump Station Trash Handling Project to Diede Construction Inc., of Woodbridge ($302,670) and Authorizing City Manager to Execute Contract MEETING DATE: July 15, 2015 PREPARED BY: Public Works Director RECOMMENDED ACTION: Adopt resolution awarding contract for Shady Acres Pump Station Trash Handling Project to Diede Construction Inc., of Woodbridge, in the amount of $302,670 and authorizing City Manager to execute contract. BACKGROUND INFORMATION: This project consists of furnishing and installing a pre -fabricated storm water trash handling system and other incidental and related work, all as shown on the plans and specifications for the project. The Shady Acres storm drain pump station serves 806 acres of developed land inside the B-1 Basin watershed (Exhibit A). The pump station is one of two locations in the City where storm water is discharged into the Woodbridge Irrigation District (WID) canal. Currently, debris is discharged along with storm water into the WID canal by the pump station. The project objective is to improve water quality in the canal while complying with State mandated storm water permit requirements. The proposed design will remove oil, floating debris, trash and sediment from the storm water before it is discharged to the WID canal. Plans and specifications for this project were approved on May 6, 2015. The City received the following 3 bids for this project on June 18, 2015. Bidder Location Bid Engineer's Estimate $ 535,000.00 Diede Construction Inc. Woodbridge $ 302,669.88 Frank Loduca Co. Stockton $ 365,800.00 Bamer Construction Castro Valley $ 369,400.00 The project is included in the FY15/16 budget for $700,000. The contractor has acknowledged the local hire and apprenticeship ordinance for the subject project. FISCAL IMPACT: This project will increase the maintenance cost to the pump station for monitoring and maintenance of the trash handling unit. APPROVED: Manager K:IWMPROJECTSZTORMORNIShady Ages Pump 5tation\ShadyAcresPumpStaHonCAward.dx 6/30/2015 Adopt Resolution Awarding Contract for Shady Acres Pump Station Trash Handling Project, to Diede Construction Inc., of Woodbridge ($302,670) July 15, 2015 Page 2 FUNDING AVAILABLE: Wastewater Capital Fund (531) $700,000 Jordan Ayers Deputy City Manager/Internal Services Director ,d& I " F. Wally 5 de In Public Works Director Prepared by Lyman Chang, Senior Civil Engineer FWS/LC/tb Attachment cc: City Engineer — Swimley Utility Superintendent Senior Civil Engineer Andy Christensen, WID General Manager Diede Construction Inc. llcvcfiiv021pubwks$\WP1PROJECTSISTORMDRNlSI)ady Acres Pump StatlorAShad yAcresPumpSIationCAward.doc 6/22/2015 a a 0 C-BASII 1',052Ac n St. rk evan Ln Legend • N ---- Trunk Line Connecting to Beckman PS ® Basin Connected to Beckman W E Storm Drain Trunk Line Storm Water Basin S Watershed City of Lodi Storm Water Watershed Map 1 inch = 3,000 feet A-1 B-2 E G-2 DA -2 C OF 01 OB -10D OG -10K 0 L Path: K:\DESIGN\Projects\GIS\SD_Watershed_Map.mxd a m co rn i 3 Turner Rd. Turner Rd. 0 E -BASIN r 319 kc � L ckeford St. <e rd St. o Lockeforc 47St. B-2-BASIN r Elm U St. 309Ac J Pi a St. Pi E e Pine St. ine P H my Park = U o B-1 BASIN Lodi AT odi AV CO Lodi Av. 806Ac F -BASIN Vin ark v in 364Ac w Vine St. o Vine St. Vi o U � A-1 BASIN Pi E 520Ac r° Y 2 U N K rk U lY 12 G-1 BASIN Kettl 657Ac D -BASIN 827Ac in U) t ° A-2 BASIN � v U -BASIN entury Blvd. 544Ac Centu Blvd. 318Ac De ark Bec ark k in G-2 BASIN 216Ac = Harn y n. c J P] L -BASIN K -BASIN Il 0 378Ac 474Ac— C: Re nolds Storm Basin = P U m 3 0 J a a 0 C-BASII 1',052Ac n St. rk evan Ln Legend • N ---- Trunk Line Connecting to Beckman PS ® Basin Connected to Beckman W E Storm Drain Trunk Line Storm Water Basin S Watershed City of Lodi Storm Water Watershed Map 1 inch = 3,000 feet A-1 B-2 E G-2 DA -2 C OF 01 OB -10D OG -10K 0 L Path: K:\DESIGN\Projects\GIS\SD_Watershed_Map.mxd SHADY ACRES PUMP STATION TRASH HANDLING PROJECT CONTRACT 358 Shady Acres Drive CITY OF LODI, CALIFORNIA THIS CONTRACT made by and between the CITY OF LODI, State of California, herein referred to as the "City," and DIEDE CONSTRUCTION, INC., herein referred to as the "Contractor." WITNESSETH That the parties hereto have mutually covenanted and agreed, and by these presents do covenant and agree with each other, as follows: The complete Contract consists of the following documents which are incorporated herein by this reference, to -wit: Notice Inviting Bids Information to Bidders General Provisions Special Provisions Bid Proposal Contract Contract Bonds Plans The July 1992 Edition, Standard Specifications, State of California, Business and Transportation Agency, Department of Transportation All of the above documents, sometimes hereinafter referred to as the "Contract Documents," are intended to cooperate so that any work called for in one and not mentioned in the other is to be executed the same as if mentioned in all said documents. ARTICLE I - That for and in consideration of the payments and agreements hereinafter mentioned, to be made and performed by the City and under the condition expressed in the two bonds bearing even date with these presents and hereunto annexed, the Contractor agrees with the City, at Contractor's cost and expense, to do all the work and furnish all the materials except such as are mentioned in the specifications to be furnished by the City, necessary to construct and complete in a good workmanlike and substantial manner and to the satisfaction of the City the proposed improvements as shown and described in the Contract Documents which are hereby made a part of the Contract. ARTICLE II - The City hereby promises and agrees with the Contractor to employ, and does hereby employ, the Contractor to provide all materials and services not supplied by the City and to do the work according to the terms and conditions for the price herein, and hereby contracts to pay the same as set forth in Section 5.600, "Measurement, Acceptance and Payment," of the General Provisions, in the manner and upon the conditions above set forth; and the said parties for themselves, their heirs, executors, administrators, successors and assigns, do hereby agree to the full performance of the covenants herein contained. ARTICLE III - The Contractor agrees to conform to the provisions of Chapter 1, Part 7, Division 2 of the Labor Code. The Contractor and any Subcontractor will pay the CONTRACT doc 4.1 06/22/15 general prevailing wage rate and other employer payments for health and welfare, pension, vacation, travel time, and subsistence pay, apprenticeship or other training programs. The responsibility for compliance with these Labor Code requirements is on the prime contractor. ARTICLE IV - And the Contractor agrees to receive and accept the following prices as full compensation for furnishing all materials and for doing all the work contemplated and embraced in this agreement; also for all loss or damage arising out of the nature of the work aforesaid or from the action of the elements, or from any unforeseen difficulties or obstructions which may arise or be encountered in the prosecution of the work until its acceptance by the City, and for all risks of every description connected with the work; also for all expenses incurred by or in consequence of the suspension or discontinuance of work and for well and faithfully completing the work, and the whole thereof, in the manner and according to the Plans and Contract Documents and the requirements of the Engineer under them, to -wit: The work consists of installing a pre -fab storm water trash -handling unit at the Shady Acres storm water pump station site. The work will require proper shoring for the unit installation. The work also consists of installing a reinforced concrete channel and other incidental and related work, all as shown on the plans and specifications for the above project. CONTRACT ITEMS ITEM EST'D. NO. DESCRIPTION UNIT QTY UNIT PRICE TOTAL PRICE 1. Mobilization LS $6,900.00 $6,900.00 2. Earthwork LS $8,142.00 $8,142.00 3. Dewatering LS $1,600.80 $1,600.80 4. Clearing & Grubbing LS $4,236.60 $4,236.60 5. Excavation Safety LS $10,543.20 $10,543.20 6. Steel Reinforcement LS $10,627.38 $10,627.38 7. Structural Concrete LS $46,366.62 $46,366.62 8. Furnish and Install CDS Unit LS $161,584.20 $161,584.20 9. Misc. Metal LS $39,579.78 $39,579.78 CONTRACT.doc 4.2 06122115 10. Misc. Site Work LS $13,089.30 $13,089.30 TOTAL BID $302,669.88 ARTICLE V - By my signature hereunder, as Contractor, I certify that I am aware of the provisions of Section 3700 of the Labor Code, which requires every employer to be insured against liability for workers' compensation or to undertake self-insurance in accordance with the provisions of that code, and I will comply with such provisions before commencing the performance of the work of this contract. ARTICLE VI - It is further expressly agreed by and between the parties hereto that, should there be any conflict between the terms of this instrument and the Bid Proposal of the Contractor, then this instrument shall control and nothing herein shall be considered as an acceptance of the said terms of said proposal conflicting herewith. ARTICLE VII - The City is to furnish the necessary rights-of-way and easements and to establish lines and grades for the work as specified under the Special Provisions. All labor or materials not mentioned specifically as being done by the City will be supplied by the Contractor to accomplish the work as outlined in the specifications. ARTICLE VIII - The Contractor agrees to commence work pursuant to this contract within 15 calendar days after the City Manager has executed the contract and to diligently prosecute to completion within 80 WORKING DAYS. ARTICLE IX - State of California Senate Bill 854 requires the following: No contractor or subcontractor may be listed on a bid proposal for a public works project unless registered with the Department of Industrial Relations pursuant to Labor Code section 1725.5 [with limited exceptions from this requirement for bid purposes only under Labor Code section 1771.1(a)]. No contractor or subcontractor may be awarded a contract for public work on a public works project unless registered with the Department of Industrial Relations pursuant to Labor Code section 1725.5. This project is subject to compliance monitoring and enforcement by the Department of Industrial Relations. CONTRACT doc 4.3 06/22/15 WHEN SIGNING THIS CONTRACT, THE CONTRACTOR AGREES THAT THE TIME OF COMPLETION FOR THIS CONTRACT IS REASONABLE AND THE CONTRACTOR AGREES TO PAY THE CITY LIQUIDATED DAMAGES AS SET FORTH IN SECTION 6-04.03 OF THE SPECIAL PROVISIONS. CONTRACTOR AGREES THAT THIS AMOUNT MAY BE DEDUCTED FROM THE AMOUNT DUE THE CONTRACTOR UNDER THE CONTRACT. IN WITNESS WHEREOF, the parties to these presents have hereunto set their hands the year and date written below. CONTRACTOR: In Title (CORPORATE SEAL) CITY OF LODI, a municipal corporation M STEPHEN SCHWABAUER City Manager Date Attest: JENNIFER M. FERRAIOLO City Clerk Approved As To Form: JANICE D. MAGDICH City Attorney CONTRACT.doc 4.4 06/22/15 RESOLUTION NO. 2015-105 A RESOLUTION OF THE LODI CITY COUNCIL AWARDING THE CONTRACT FOR THE SHADY ACRES PUMP STATION TRASH HANDLING PROJECT AND FURTHER AUTHORIZING THE CITY MANAGER TO EXECUTE THE CONTRACT WHEREAS, in answer to notice duly published in accordance with law and the order of this City Council, sealed bids were received and publicly opened on June 18, 2015, at 11:00 a.m. for the Shady Acres Pump Station Trash Handling Project, described in the plans and specifications therefore approved by the City Council on May 6, 2015; and WHEREAS, said bid has been checked and tabulated and a report thereof filed with the City Manager as follows: Bidder Bid Diede Construction, Inc. $ 302,669.88 Frank Loduca Company $ 365,800.00 Bamer Construction $ 369,400.00 WHEREAS, staff recommends awarding the contract for the Shady Acres Pump Station Trash Handling Project to the low bidder, Diede Construction, Inc., of Woodbridge, in the amount of $302,669.88. NOW, THEREFORE, BE IT RESOLVED that the Lodi City Council does hereby award the contract for the Shady Acres Pump Station Trash Handling Project to the low bidder, Diede Construction, Inc., of Woodbridge, California, in the amount of $302,669.88; and BE IT FURTHER RESOLVED that the City Manager is hereby authorized to execute the contract on behalf of the City of Lodi. Dated: July 15, 2015 ------------------- ------------------- I hereby certify that Resolution No. 2015-105 was passed and adopted by the City Council of the City of Lodi in a regular meeting held July 15, 2015, by the following vote: AYES: COUNCIL MEMBERS — Chandler, Kuehne, Mounce, Nakanishi, and Mayor Johnson NOES: COUNCIL MEMBERS — None ABSENT: COUNCIL MEMBERS — None ABSTAIN: COUNCIL MEMBERS — None J NIFERi h. FERRAIOLO City Clerk 2015-105 CITY COUNCIL BOB JOHNSON, Mayor MARK CHANDLER, Mayor Pro Tempore DOUG KUEHNE JOANNE MOUNCE ALAN NAKANISHI Diede Construction, Inc. P. O. Box 1007 Woodbridge, CA 95258 CITY OF LODI PUBLIC WORKS DEPARTMENT CITY HALL, 221 WEST PINE STREET P.O BOX 3006 LODI, CALIFORNIA 95241-1910 (209) 333-6706 FAX (209) 333-6710 EMAIL pwdept@lodi.gov http:\\www.lodi.gov July 9, 2015 STEPHEN SCHWABAUER City Manager JENNIFER M. FERRAIOLO City Clerk JANICE D. MAGDICH City Attorney F. WALLY SANDELIN Public Works Director SUBJECT: Adopt Resolution Awarding Contract for Shady Acres Pump Station Trash Handling Project to Diede Construction Inc., of Woodbridge ($302,670) and Authorizing City Manager to Execute Contract Enclosed is a copy of background information on an item on the City Council agenda of Wednesday, July 15, 2015. The meeting will be held at 7 p.m. in the City Council Chamber, Carnegie Forum, 305 West Pine Street. This item is on the consent calendar and is usually not discussed unless a Council Member requests discussion. The public is given an opportunity to address items on the consent calendar at the appropriate time. If you wish to write to the City Council, please address your letter to City Council, City of Lodi, P. O. Box 3006, Lodi, California, 95241-1910. Be sure to allow time for the mail. Or, you may hand -deliver the letter to City Hall, 221 West Pine Street. If you wish to address the Council at the Council Meeting, be sure to fill out a speaker's card (available at the Carnegie Forum immediately prior to the start of the meeting) and give it to the City Clerk. If you have any questions about communicating with the Council, please contact Jennifer M. Ferraiolo, City Clerk, at (209) 333-6702. If you have any questions about the item itself, 6706. w� F. ally Sandelin ,1W Public Works Director FWS/tb Enclosure cc: City Clerk L CC SHADY ACRES DOC please call Lyman Chang at (209) 333-