HomeMy WebLinkAboutAgenda Report - May 6, 2015 C-03AGENDA ITEM 43
CITY OF LODI
COUNCIL COMMUNICATION
TM
AGENDA TITLE: Approve Plans and Specifications and Authorize Advertisement for Bids for
Shady Acres Pump Station Trash Handling Project
MEETING DATE: May 6, 2015
PREPARED BY: Public Works Director
RECOMMENDED ACTION: Approve plans and specifications and authorize advertisement for
bids for Shady Acres Pump Station Trash Handling Project.
BACKGROUND INFORMATION: This project consists of furnishing and installing a pre -fabricated
storm water trash handling system and other incidental and related
work, all as shown on the plans and specifications for the project.
The Shady Acres storm drain pump station serves 806 acres of developed land inside the B-1 Basin
watershed (Exhibit A). The pump station is one of two locations in the City where storm water is
discharged into the Woodbridge Irrigation District (WID) canal.
In 2012, the City of Lodi entered into the "Third Amendment to 2003 Agreement for Purchasing of Water
from Woodbridge Irrigation District by City of Lodi" with WID. In exchange for additional surface water
banking opportunities, the City agreed to install a storm water trash handling system at the Shady Acres
Pump Station.
Currently, debris is discharged along with storm water into the WID canal by the pump station. The
project objective is to improve water quality in the canal while complying with State mandated storm
water permit requirements. The proposed design will remove oil, floating debris, trash and sediment from
the storm water before it is discharged to the WID canal (Exhibit B and C).
WID concurs with the system being proposed and will assist the City and the contractor as needed. It is
expected the unit will require regular monitoring and bi-annual cleaning that will be performed by City
crews.
The specifications are on file in the Public Works Department. The planned bid opening date is
June 18, 2015. The project estimate is $800,000. It is anticipated that the majority of the contract cost is
in the installation of the trash handling unit due to restricted site access issues.
FISCAL IMPACT: This project will increase the maintenance cost to the pump station for
monitoring and maintenance of the trash handling unit.
FUNDING AVAILABLE: Funding will be identified at pr Iect award.
I Wu
F. Wallyandelin
Public Works Director
Prepared by Lyman Chang, Senior Civil Engineer
FWS/LC/smh
Attachments
cc: Deputy Public Works Director
Senior Civil Engineer
APPROVED:
Utility Superintendent
Andy Christensen, WID General Manager
uer, City Manager
K:\WP\PROJECTS\STORMDRN\Shady Acres Pump Station\ShadyAcresPumpStation CPSA.doc 4/24/2015
N
Legend
Storm Water Basin w E
Watershed S
A-1 O B-2 D E O G-2 City of Lodi
0 A-2 ] C F D I Storm Water Watershed Map 1 inch = 3,000 feet
B-1 O D F—] G-1 O K EXHIBIT A
0 L
Path: K:\DESIGN\Projects\GIS\SD_Watershed_Map.mxd
o
rn
Turner Rd. _°,
Turner d.
�
CO
Qj
U C
N
E-BASIN
N
=
y C
J
U
Q
:2
319Ac
Lckeford St.
_o
N
(D
o
Lockeford
f
ord St.
St.
St.
B_2-Om 114
J
in in St.
U
C
309Ac
E Pi a St. .�
PineD
Pine St.
ine P t. Pine,St
H miry Par
m C
C o
U
m
Lo
B-1 BASIN =
odi Av. Lodi Av.
806Ac
rn �
Shady Acres
= C-BASIN
r
1,052Ac
F-BASIN
��
Vin pel ark
U in
364Ac
Vine St. ��L1LJ
o Vine St.
Vine St.
A-1 BASIN
U
�°
C
J
aa)
p
Pi rk 9
0
520Ac
o
2
-
K
irk
U
'Y 12
G�1_BASIN
Kettleman Ln.
657Ac
D-BASIN
J
827Ac
C
U O
-BASIN
Centu Blvd.
A-2 BASIN
7 U
v U) Century Blvd.
318Ac
544Ac
De rk Bec
ark
k
U)
G-2 BASIN
L
216Ac
M
Harn y Ln.
ci
J
L-BASIN
K-BASIN
0
378Ac
474Ac
rn
c
RE
ynolds Storm Basin
_
=
m
E
m
U
N
3
0
J
••
N
Legend
Storm Water Basin w E
Watershed S
A-1 O B-2 D E O G-2 City of Lodi
0 A-2 ] C F D I Storm Water Watershed Map 1 inch = 3,000 feet
B-1 O D F—] G-1 O K EXHIBIT A
0 L
Path: K:\DESIGN\Projects\GIS\SD_Watershed_Map.mxd
G
• PUBLIC WORKS DEPARTMENT
CITY
SHADY ACRES DR
ACCESS ROAD
Exhibit B
Shady Acres Pump Station Site
EX WELL 9 SITE
i
� L—J
iL J
u
JJ,//
PROPOSED TRASH
HANDLING UNIT
U1TII 9Z A \-Al1
PUMP STATION
I
0
a
0
U)
LU
U
U
Q
K:\CADD\PROJECTS\2014\014D001\014D001_ALTB.dwg, EXHIBIT B, 3/31/2015 3:08:43 PM, Ichang
FRAMEAND
COVER
FRAME AND
/ COVER
A A
INLEL I A
OUTLET
120" I.D. /
MANHOLE /
STRUCTURE \ —
(138") O.D.
PLAN VIEW
CONTRACTOR TO GROUT
TO FINISHED GRADE
GRADE
RING/RISER
FIBERGLASS
SEPARATION
CYLINDER&INLET - -
SEPARATION I~3'-0"�
SCREEN 4
SOLIDS STORAGE
SUMP
SECTION A -A
CONCRETE DIMENSIONS WILL BE
PROVIDED WITH CONTRACT DRAWING
AT TIME OF APPROVAL
FLOW
y
FIBERGL
INLET
CYLIN
SECTION B -B
VTER OF CDS
WCTURE,
SCREEN AND
SUMP OPENING
MATERIALS LIST - PROVIDED BY CONTECH
-
— —
COUNT DESCRIPTION INSTALLED BY
1 FIBERGLASS INLET & CYLINDER CONTECH
.,'.
PEAK FLOW
XX CFS
RATE
1
RETURN PERIOD
OF PEAK FLOW
XX YRS
1 4700 MICRON SEP. SCREEN CONTECH
GRADE RINGS/ RISERS
CONTRACTOR
2
024' FRAME AND COVER
CONTRACTOR
X
NLET
INV. ELEV. XXX'
INLET PIPE
_
OUTLET
OXX" MAT'L
OUTLET PIPE
INV. ELEV. XXX'
0." MAIL
PERMANENT
POOL ELEV.
OIL BAFFLE
-
SEPARATION I~3'-0"�
SCREEN 4
SOLIDS STORAGE
SUMP
SECTION A -A
CONCRETE DIMENSIONS WILL BE
PROVIDED WITH CONTRACT DRAWING
AT TIME OF APPROVAL
FLOW
y
FIBERGL
INLET
CYLIN
SECTION B -B
VTER OF CDS
WCTURE,
SCREEN AND
SUMP OPENING
MATERIALS LIST - PROVIDED BY CONTECH
SITE DESIGN DATA
WATER QUALITY XX CFS
FLOW RATE
COUNT DESCRIPTION INSTALLED BY
1 FIBERGLASS INLET & CYLINDER CONTECH
PEAK FLOW
XX CFS
RATE
1
RETURN PERIOD
OF PEAK FLOW
XX YRS
1 4700 MICRON SEP. SCREEN CONTECH
GENERAL NOTES
1. CONTECH TO PROVIDE ALL MATERIALS UNLESS NOTED OTHERWISE.
2. DIMENSIONS MARKED WITH () ARE REFERENCE DIMENSIONS. ACTUAL DIMENSIONS MAY VARY.
3. FOR FABRICATION DRAWINGS WITH DETAILED STRUCTURE DIMENSIONS AND WEIGHTS, PLEASE CONTACT YOUR
CONTECH ENGINEERED SOLUTIONS LLC REPRESENTATIVE. w ContechES.com
4. CDS WATER QUALITY STRUCTURE SHALL BE IN ACCORDANCE WITH ALL DESIGN DATA AND INFORMATION CONTAINED IN
THIS DRAWING.
5. STRUCTURE AND CASTINGS SHALL MEET AASHTO HS20 LOAD RATING.
6. PVC HYDRAULIC SHEAR PLATE IS PLACED ON SHELF AT BOTTOM OF SCREEN CYLINDER. REMOVE AND REPLACE AS
NECESSARY DURING MAINTENANCE CLEANING.
INSTALLATION NOTES
A. ANY SUB -BASE, BACKFILL DEPTH, AND/OR ANTI -FLOTATION PROVISIONS ARE SITE-SPECIFIC DESIGN CONSIDERATIONS
AND SHALL BE SPECIFIED BY ENGINEER OF RECORD.
B. CONTRACTOR TO PROVIDE EQUIPMENT WITH SUFFICIENT LIFTING AND REACH CAPACITY TO LIFT AND SET THE CDS
MANHOLE STRUCTURE (LIFTING CLUTCHES PROVIDED).
C. CONTRACTOR TO ADD JOINT SEALANT BETWEEN ALL STRUCTURE SECTIONS, AND ASSEMBLE STRUCTURE.
D. CONTRACTOR TO PROVIDE, INSTALL, AND GROUT PIPES. MATCH PIPE INVERTS WITH ELEVATIONS SHOWN.
E. CONTRACTOR TO TAKE APPROPRIATE MEASURES TO ASSURE UNIT IS WATER TIGHT, HOLDING WATER TO FLOWLINE
INVERT MINIMUM. IT IS SUGGESTED THAT ALL JOINTS BELOW PIPE INVERTS ARE GROUTED.
STRUCTURE WEIGHT
APPROXIMATE HEAVIEST PICK= T.B.D. LBS.
CONTECH
PROPOSAL
DRAWING
X
Z
x
U Z
(D X x0
x u)
00
Lu
0
LO W
U)
0 U)
U
B �
go E
3a
w 3 X;y
�H
pp
tae R �r€s
� 3e
Z.
E: XX/XX/XX
icNED. AWN/A
XXXXX OUEo'END.
E. 1 OF #
1
SEALANT FOR JOINTS
CONTRACTOR
1
GRADE RINGS/ RISERS
CONTRACTOR
2
024' FRAME AND COVER
CONTRACTOR
GENERAL NOTES
1. CONTECH TO PROVIDE ALL MATERIALS UNLESS NOTED OTHERWISE.
2. DIMENSIONS MARKED WITH () ARE REFERENCE DIMENSIONS. ACTUAL DIMENSIONS MAY VARY.
3. FOR FABRICATION DRAWINGS WITH DETAILED STRUCTURE DIMENSIONS AND WEIGHTS, PLEASE CONTACT YOUR
CONTECH ENGINEERED SOLUTIONS LLC REPRESENTATIVE. w ContechES.com
4. CDS WATER QUALITY STRUCTURE SHALL BE IN ACCORDANCE WITH ALL DESIGN DATA AND INFORMATION CONTAINED IN
THIS DRAWING.
5. STRUCTURE AND CASTINGS SHALL MEET AASHTO HS20 LOAD RATING.
6. PVC HYDRAULIC SHEAR PLATE IS PLACED ON SHELF AT BOTTOM OF SCREEN CYLINDER. REMOVE AND REPLACE AS
NECESSARY DURING MAINTENANCE CLEANING.
INSTALLATION NOTES
A. ANY SUB -BASE, BACKFILL DEPTH, AND/OR ANTI -FLOTATION PROVISIONS ARE SITE-SPECIFIC DESIGN CONSIDERATIONS
AND SHALL BE SPECIFIED BY ENGINEER OF RECORD.
B. CONTRACTOR TO PROVIDE EQUIPMENT WITH SUFFICIENT LIFTING AND REACH CAPACITY TO LIFT AND SET THE CDS
MANHOLE STRUCTURE (LIFTING CLUTCHES PROVIDED).
C. CONTRACTOR TO ADD JOINT SEALANT BETWEEN ALL STRUCTURE SECTIONS, AND ASSEMBLE STRUCTURE.
D. CONTRACTOR TO PROVIDE, INSTALL, AND GROUT PIPES. MATCH PIPE INVERTS WITH ELEVATIONS SHOWN.
E. CONTRACTOR TO TAKE APPROPRIATE MEASURES TO ASSURE UNIT IS WATER TIGHT, HOLDING WATER TO FLOWLINE
INVERT MINIMUM. IT IS SUGGESTED THAT ALL JOINTS BELOW PIPE INVERTS ARE GROUTED.
STRUCTURE WEIGHT
APPROXIMATE HEAVIEST PICK= T.B.D. LBS.
CONTECH
PROPOSAL
DRAWING
X
Z
x
U Z
(D X x0
x u)
00
Lu
0
LO W
U)
0 U)
U
B �
go E
3a
w 3 X;y
�H
pp
tae R �r€s
� 3e
Z.
E: XX/XX/XX
icNED. AWN/A
XXXXX OUEo'END.
E. 1 OF #