HomeMy WebLinkAboutAgenda Report - May 6, 2015 C-03AGENDA ITEM 43 CITY OF LODI COUNCIL COMMUNICATION TM AGENDA TITLE: Approve Plans and Specifications and Authorize Advertisement for Bids for Shady Acres Pump Station Trash Handling Project MEETING DATE: May 6, 2015 PREPARED BY: Public Works Director RECOMMENDED ACTION: Approve plans and specifications and authorize advertisement for bids for Shady Acres Pump Station Trash Handling Project. BACKGROUND INFORMATION: This project consists of furnishing and installing a pre -fabricated storm water trash handling system and other incidental and related work, all as shown on the plans and specifications for the project. The Shady Acres storm drain pump station serves 806 acres of developed land inside the B-1 Basin watershed (Exhibit A). The pump station is one of two locations in the City where storm water is discharged into the Woodbridge Irrigation District (WID) canal. In 2012, the City of Lodi entered into the "Third Amendment to 2003 Agreement for Purchasing of Water from Woodbridge Irrigation District by City of Lodi" with WID. In exchange for additional surface water banking opportunities, the City agreed to install a storm water trash handling system at the Shady Acres Pump Station. Currently, debris is discharged along with storm water into the WID canal by the pump station. The project objective is to improve water quality in the canal while complying with State mandated storm water permit requirements. The proposed design will remove oil, floating debris, trash and sediment from the storm water before it is discharged to the WID canal (Exhibit B and C). WID concurs with the system being proposed and will assist the City and the contractor as needed. It is expected the unit will require regular monitoring and bi-annual cleaning that will be performed by City crews. The specifications are on file in the Public Works Department. The planned bid opening date is June 18, 2015. The project estimate is $800,000. It is anticipated that the majority of the contract cost is in the installation of the trash handling unit due to restricted site access issues. FISCAL IMPACT: This project will increase the maintenance cost to the pump station for monitoring and maintenance of the trash handling unit. FUNDING AVAILABLE: Funding will be identified at pr Iect award. I Wu F. Wallyandelin Public Works Director Prepared by Lyman Chang, Senior Civil Engineer FWS/LC/smh Attachments cc: Deputy Public Works Director Senior Civil Engineer APPROVED: Utility Superintendent Andy Christensen, WID General Manager uer, City Manager K:\WP\PROJECTS\STORMDRN\Shady Acres Pump Station\ShadyAcresPumpStation CPSA.doc 4/24/2015 N Legend Storm Water Basin w E Watershed S A-1 O B-2 D E O G-2 City of Lodi 0 A-2 ] C F D I Storm Water Watershed Map 1 inch = 3,000 feet B-1 O D F—] G-1 O K EXHIBIT A 0 L Path: K:\DESIGN\Projects\GIS\SD_Watershed_Map.mxd o rn Turner Rd. _°, Turner d. � CO Qj U C N E-BASIN N = y C J U Q :2 319Ac Lckeford St. _o N (D o Lockeford f ord St. St. St. B_2-Om 114 J in in St. U C 309Ac E Pi a St. .� PineD Pine St. ine P t. Pine,St H miry Par m C C o U m Lo B-1 BASIN = odi Av. Lodi Av. 806Ac rn � Shady Acres = C-BASIN r 1,052Ac F-BASIN �� Vin pel ark U in 364Ac Vine St. ��L1LJ o Vine St. Vine St. A-1 BASIN U �° C J aa) p Pi rk 9 0 520Ac o 2 - K irk U 'Y 12 G�1_BASIN Kettleman Ln. 657Ac D-BASIN J 827Ac C U O -BASIN Centu Blvd. A-2 BASIN 7 U v U) Century Blvd. 318Ac 544Ac De rk Bec ark k U) G-2 BASIN L 216Ac M Harn y Ln. ci J L-BASIN K-BASIN 0 378Ac 474Ac rn c RE ynolds Storm Basin _ = m E m U N 3 0 J •• N Legend Storm Water Basin w E Watershed S A-1 O B-2 D E O G-2 City of Lodi 0 A-2 ] C F D I Storm Water Watershed Map 1 inch = 3,000 feet B-1 O D F—] G-1 O K EXHIBIT A 0 L Path: K:\DESIGN\Projects\GIS\SD_Watershed_Map.mxd G • PUBLIC WORKS DEPARTMENT CITY SHADY ACRES DR ACCESS ROAD Exhibit B Shady Acres Pump Station Site EX WELL 9 SITE i � L—J iL J u JJ,// PROPOSED TRASH HANDLING UNIT U1TII 9Z A \-Al1 PUMP STATION I 0 a 0 U) LU U U Q K:\CADD\PROJECTS\2014\014D001\014D001_ALTB.dwg, EXHIBIT B, 3/31/2015 3:08:43 PM, Ichang FRAMEAND COVER FRAME AND / COVER A A INLEL I A OUTLET 120" I.D. / MANHOLE / STRUCTURE \ — (138") O.D. PLAN VIEW CONTRACTOR TO GROUT TO FINISHED GRADE GRADE RING/RISER FIBERGLASS SEPARATION CYLINDER&INLET - - SEPARATION I~3'-0"� SCREEN 4 SOLIDS STORAGE SUMP SECTION A -A CONCRETE DIMENSIONS WILL BE PROVIDED WITH CONTRACT DRAWING AT TIME OF APPROVAL FLOW y FIBERGL INLET CYLIN SECTION B -B VTER OF CDS WCTURE, SCREEN AND SUMP OPENING MATERIALS LIST - PROVIDED BY CONTECH - — — COUNT DESCRIPTION INSTALLED BY 1 FIBERGLASS INLET & CYLINDER CONTECH .,'. PEAK FLOW XX CFS RATE 1 RETURN PERIOD OF PEAK FLOW XX YRS 1 4700 MICRON SEP. SCREEN CONTECH GRADE RINGS/ RISERS CONTRACTOR 2 024' FRAME AND COVER CONTRACTOR X NLET INV. ELEV. XXX' INLET PIPE _ OUTLET OXX" MAT'L OUTLET PIPE INV. ELEV. XXX' 0." MAIL PERMANENT POOL ELEV. OIL BAFFLE - SEPARATION I~3'-0"� SCREEN 4 SOLIDS STORAGE SUMP SECTION A -A CONCRETE DIMENSIONS WILL BE PROVIDED WITH CONTRACT DRAWING AT TIME OF APPROVAL FLOW y FIBERGL INLET CYLIN SECTION B -B VTER OF CDS WCTURE, SCREEN AND SUMP OPENING MATERIALS LIST - PROVIDED BY CONTECH SITE DESIGN DATA WATER QUALITY XX CFS FLOW RATE COUNT DESCRIPTION INSTALLED BY 1 FIBERGLASS INLET & CYLINDER CONTECH PEAK FLOW XX CFS RATE 1 RETURN PERIOD OF PEAK FLOW XX YRS 1 4700 MICRON SEP. SCREEN CONTECH GENERAL NOTES 1. CONTECH TO PROVIDE ALL MATERIALS UNLESS NOTED OTHERWISE. 2. DIMENSIONS MARKED WITH () ARE REFERENCE DIMENSIONS. ACTUAL DIMENSIONS MAY VARY. 3. FOR FABRICATION DRAWINGS WITH DETAILED STRUCTURE DIMENSIONS AND WEIGHTS, PLEASE CONTACT YOUR CONTECH ENGINEERED SOLUTIONS LLC REPRESENTATIVE. w ContechES.com 4. CDS WATER QUALITY STRUCTURE SHALL BE IN ACCORDANCE WITH ALL DESIGN DATA AND INFORMATION CONTAINED IN THIS DRAWING. 5. STRUCTURE AND CASTINGS SHALL MEET AASHTO HS20 LOAD RATING. 6. PVC HYDRAULIC SHEAR PLATE IS PLACED ON SHELF AT BOTTOM OF SCREEN CYLINDER. REMOVE AND REPLACE AS NECESSARY DURING MAINTENANCE CLEANING. INSTALLATION NOTES A. ANY SUB -BASE, BACKFILL DEPTH, AND/OR ANTI -FLOTATION PROVISIONS ARE SITE-SPECIFIC DESIGN CONSIDERATIONS AND SHALL BE SPECIFIED BY ENGINEER OF RECORD. B. CONTRACTOR TO PROVIDE EQUIPMENT WITH SUFFICIENT LIFTING AND REACH CAPACITY TO LIFT AND SET THE CDS MANHOLE STRUCTURE (LIFTING CLUTCHES PROVIDED). C. CONTRACTOR TO ADD JOINT SEALANT BETWEEN ALL STRUCTURE SECTIONS, AND ASSEMBLE STRUCTURE. D. CONTRACTOR TO PROVIDE, INSTALL, AND GROUT PIPES. MATCH PIPE INVERTS WITH ELEVATIONS SHOWN. E. CONTRACTOR TO TAKE APPROPRIATE MEASURES TO ASSURE UNIT IS WATER TIGHT, HOLDING WATER TO FLOWLINE INVERT MINIMUM. IT IS SUGGESTED THAT ALL JOINTS BELOW PIPE INVERTS ARE GROUTED. STRUCTURE WEIGHT APPROXIMATE HEAVIEST PICK= T.B.D. LBS. CONTECH PROPOSAL DRAWING X Z x U Z (D X x0 x u) 00 Lu 0 LO W U) 0 U) U B � go E 3a w 3 X;y �H pp tae R �r€s � 3e Z. E: XX/XX/XX icNED. AWN/A XXXXX OUEo'END. E. 1 OF # 1 SEALANT FOR JOINTS CONTRACTOR 1 GRADE RINGS/ RISERS CONTRACTOR 2 024' FRAME AND COVER CONTRACTOR GENERAL NOTES 1. CONTECH TO PROVIDE ALL MATERIALS UNLESS NOTED OTHERWISE. 2. DIMENSIONS MARKED WITH () ARE REFERENCE DIMENSIONS. ACTUAL DIMENSIONS MAY VARY. 3. FOR FABRICATION DRAWINGS WITH DETAILED STRUCTURE DIMENSIONS AND WEIGHTS, PLEASE CONTACT YOUR CONTECH ENGINEERED SOLUTIONS LLC REPRESENTATIVE. w ContechES.com 4. CDS WATER QUALITY STRUCTURE SHALL BE IN ACCORDANCE WITH ALL DESIGN DATA AND INFORMATION CONTAINED IN THIS DRAWING. 5. STRUCTURE AND CASTINGS SHALL MEET AASHTO HS20 LOAD RATING. 6. PVC HYDRAULIC SHEAR PLATE IS PLACED ON SHELF AT BOTTOM OF SCREEN CYLINDER. REMOVE AND REPLACE AS NECESSARY DURING MAINTENANCE CLEANING. INSTALLATION NOTES A. ANY SUB -BASE, BACKFILL DEPTH, AND/OR ANTI -FLOTATION PROVISIONS ARE SITE-SPECIFIC DESIGN CONSIDERATIONS AND SHALL BE SPECIFIED BY ENGINEER OF RECORD. B. CONTRACTOR TO PROVIDE EQUIPMENT WITH SUFFICIENT LIFTING AND REACH CAPACITY TO LIFT AND SET THE CDS MANHOLE STRUCTURE (LIFTING CLUTCHES PROVIDED). C. CONTRACTOR TO ADD JOINT SEALANT BETWEEN ALL STRUCTURE SECTIONS, AND ASSEMBLE STRUCTURE. D. CONTRACTOR TO PROVIDE, INSTALL, AND GROUT PIPES. MATCH PIPE INVERTS WITH ELEVATIONS SHOWN. E. CONTRACTOR TO TAKE APPROPRIATE MEASURES TO ASSURE UNIT IS WATER TIGHT, HOLDING WATER TO FLOWLINE INVERT MINIMUM. IT IS SUGGESTED THAT ALL JOINTS BELOW PIPE INVERTS ARE GROUTED. STRUCTURE WEIGHT APPROXIMATE HEAVIEST PICK= T.B.D. LBS. CONTECH PROPOSAL DRAWING X Z x U Z (D X x0 x u) 00 Lu 0 LO W U) 0 U) U B � go E 3a w 3 X;y �H pp tae R �r€s � 3e Z. E: XX/XX/XX icNED. AWN/A XXXXX OUEo'END. E. 1 OF #