Loading...
HomeMy WebLinkAboutAgenda Report - March 4, 2015 C-05AGENDA ITEM Cw5 CITY OF LODI ,. COUNCIL COMMUNICATION TM AGENDA TITLE: Adopt Resolution Authorizing Purchase of Sports Lighting Components from Musco Corporation of Oskaloosa, Iowa, Accepting $32,500 Donation from the Boosters of Boys/Girls Sports and Appropriating Funds ($160,429) MEETING DATE: March 4, 2015 PREPARED BY: Parks, Recreation and Cultural Services Director RECOMMENDED ACTION Adopt a resolution authorizing the purchase of sports lighting components from Musco Corporation of Oskaloosa, Iowa, accepting $32,500 donation from the Boosters of Boys/Girls Sports and appropriating funds in the amount of $160,429. BACKGROUND INFORMATION: Salas Park is Lodi's primary sports park for youth baseball, softball, soccer and football, for both practices and games. The park consists of 60-, 70- and 90 -foot baseball diamonds, a 60 -foot softball diamond, two soccer fields and a football practice area. Games and practices are scheduled in the facility from March into November. Many of the events are held after sunset, as Salas is one of the City's few lighted sports fields. Nineteen of the park's 21 sports light poles are wooden utility poles dating to the 1980s, and two are 70 -foot metal poles installed approximately 15 years ago to increase the amount of space available for night-time practices. Three wooden poles are in need of immediate replacement. In fact, two are currently being supported by splint poles installed by the Electric Utility on February 17. The components in this proposed purchase will eventually replace those three and five additional poles as Parks, Recreation and Cultural Services has long sought to upgrade the lighting at Salas Park. Light output will be increased by as much as 50 percent in many areas. On February 18, 2015, the City Council adopted a resolution establishing Musco Corporation sports lights as the standard for City parks. This proposed purchase includes 41 lamps, poletop assemblies, wiring, Musco's proprietary Control Link monitoring system, eight 70 -foot steel poles and eight precast concrete bases. The equipment comes with a 25 -year warranty and maintenance program, plus two relampings. Funding will come from a combination of sources: Parks Capital, Electric Utility Public Benefits Funds and the Boosters of Boys/Girls Sports (BOBS). The BOBS' board voted in December to approve a $32,500 donation, payable in five annual installments of $6,500, toward the project, as the fields are used almost exclusively by their programs. The Electric Utility is supporting the project with an energy efficiency rebate, as the Control Link controller provides reduces power APPROVED: /1-M Ste his chwabauer, City Manager Adopt Resolution Authorizing Purchase of Sports Lighting Components from Musco Corporation of Oskaloosa, Iowa, Accepting $32,500 Donation from the Boosters of Boys/Girls Sports and Appropriating Funds ($160,429) March 4, 2015 Page 2 consumption by 25 percent over the current system. This energy-saving component is eligible for $11,600 in Public Benefits funds from the Electric Utility. The balance will come from Parks Capital, with partial reimbursement from the BOBS' donation. The City Council will be asked to advertise the construction project for bids at a future date. Timing the delivery of materials will be determined upon award of the construction contract. The pricing from Musco is attached. FISCAL IMPACT: $148,829 from Parks Capital, $11,600 from Public Benefits. FUNDING AVAILABLE: Parks Capital Fund (432.32205, unreserved), Public Benefits (50465100.72920) Jordan Ayers, Deputy City Mamickgr1internal Services Director Jeff Hood Parks, "a ion and Cultural Services Director JMR:tl cc: City Attorney Attachments: Musco Pricing Appropriation Adjustment Form Salas Park Relight Lodi, California Date: February 13, 2015 To: Steve Virrey Quotation Price Musco's Light Structure Green TM lighting system as described below and delivered to the job site Equipment Breakout: 41 LSG fixtures which includes: Factory aimed poletop luminaire assemblies, 1500 watt metal halide luminaires, UL Listed remote electrical component enclosures, pole length wire harness ... $84,100.00 Control Link® Control & Monitoring System, 25 Year Warranty and maintenance program for 25 years, two group re -lamps at the end of the lamps' rated life, 5000 hours...............................$11,600.00 8- 70' Galvanized steel poles.................................................................................................. $34,100.00 8- 9500 PSI pre -cast concrete bases......................................................................................$17,300.00 SalesTax............................................................................................................................$13.329.00 Total for equipment plus tax. ..................................................................................... .......... $160,429.00 Labor, and unloading of the equipment are not included as part of this quote. Equipment Description Light -Structure Greene" System delivered to your site in Five Easy Piecest" • (8) Pre -cast concrete bases • (8) 70'Galvanized steel poles • UL Listed remote electrical component enclosure • Pole length wire harness • (41) Factory -aimed and assembled luminaires Also Includes: • Energy savings of more than 50% over a standard lighting system 50% less spill and glare light than Musco's prior industry leading technology • Musco Constant 25TM warranty and maintenance program that eliminates 100% of your maintenance costs for 25 years, including labor and materials Guaranteed constant light levels for 25 years • One (1) group re -lamps at the end of the lamps' rated life, 5000 hours • Reduced energy consumption with an average of 64.1 kW per hour • Control Link® Control & Monitoring System for flexible control and solid management of your lighting system • Lighting Contactors sized for the voltage and phasing at the site Pricing furnished is effective for 60 days unless otherwise noted and is considered confidential. Musco Sports Lighting, LLC - 2009, 2013 1 M-1290-enUS-5 Payment Terms Payment of 25% of the contract price is required with order. The contract balance is due no later than 30 days after invoice date Late payment will be subject to service charges of 1 1/2% per month (18% APR). Musco will make every effort to coordinate shipment so that delivery corresponds with the customer's payment schedule. We will expect payment within the terms described above unless there is a written statement from Musco's corporate headquarters stating the acceptance of different terms. Delivery to the job site from the time of order, submittal approval, and confirmation of order details including voltage and phase, pole locations is approximately 30-45 days. Due to the built-in custom light control per luminaire, pole locations need to be confirmed prior to production. Changes to pole locations after the product is sent to production could result in additional charges. Notes Quote is based on: • Shipment of entire project together to one location • Structural code and wind speed = 2013, CBC -C, 110 MPH Exposure C. • Confirmation of pole locations prior to production Thank you for considering Musco for your sports lighting needs. Please contact me with any questions Bob Crookham Sales Representative Musco Sports Lighting, LLC Phone: 530/672-9500 E-mail: bob.crookham@musco.com Fax: 530/672-9471 Musco Sports Lighting, LLC - 2009, 2013 ? M-1290-enUS-5 1. AA# 2. JV# CITY OF LODI !. APPROPRIATION ADJUSTMENT REQUEST TO: Internal Services Dept. - Budget Division 3. FROM IJeff Hood, PRCS Director 15, DATE: 2/19/15 4. DEPARTMENT/DIVISION: PRCS/Parks 6. REQUEST ADJUSTMENT OF APPROPRIATION AS LISTED BELOW FUND # BUS. UNIT # ACCOUNT # ACCOUNT TITLE AMOUNT A. 432 32205 Parks Capital Unreserved $ 148,829.00 SOURCE OF 432 43200000 50001 Operating transfer in $ 11,600.00 FINANCING 504 50465100 72920 Public Benefits Program $ 11,600.00 B. 432 43299000 77020 Park Capital Projects $ 160,429.00 USE OF 504 50465001 76220 Operating transfer out $ 11,600.00 FINANCING Submit completed form to the Budget Division with any required documentation. Final approval will be provided in electronic copy format. RESOLUTION NO. 2015-22 A RESOLUTION AUTHORIZING THE PURCHASE OF SPORTS LIGHTING COMPONENTS FROM MUSCO COPORATION, OF OSKALOOSA, IOWA; ACCEPTING $32,500 DONATION FROM THE BOOSTERS OF BOYS/GIRLS SPORTS; AND FURTHER APPROPRIATING FUNDS WHEREAS, Salas Park is Lodi's primary sports park for youth baseball, softball, soccer and football, for both practices and games; and WHEREAS, 19 of the park's 21 sports light poles are wooden utility poles dating to the 1980s, and two are 70 -foot metal poles installed approximately 15 years ago to increase the amount of space available for night-time practices; and WHEREAS, on February 18, 2015, the City Council adopted a resolution establishing Musco Corporation sports lights as the standard for City parks; and WHEREAS, funding will come from a combination of sources: Parks Capital, Electric Utility Public Benefits Funds and the Boosters of Boys/Girls Sports (BOBS). NOW, THEREFORE, BE IT RESOLVED that the Lodi City Council does hereby authorize the purchase of sports lighting components from Musco Corporation, of Oskaloosa, Iowa; and BE IT FURTHER RESOLVED that the Lodi City Council accepts the $32,500 donation from the Boosters of Boys/Girls Sports and appropriates $160,429 towards this purchase. Dated: March 4, 2015 I hereby certify that Resolution No. 2015-22 was passed and adopted by the Lodi City Council in a regular meeting held March 4, 2015, by the following vote: AYES: COUNCIL MEMBERS — Chandler, Kuehne, Mounce, Nakanishi, and Mayor Johnson NOES: COUNCIL MEMBERS — None ABSENT: COUNCIL MEMBERS — None ABSTAIN: COUNCIL MEMBERS — None NNIFE FERRAIOLO ity Clerk 2015-22