AGENDA TITLE: Approve Plans and Specifications and Authorize Advertisements for Bids
for Lodi Lake Wading Pool Resurfacing Improvements
MEETING DATE: March 4, 2015
PREPARED BY: Parks, Recreation and Cultural Services Director
RECOMMENDED ACTION: Approve plans and specifications and authorize
advertisements for bids for Lodi Lake wading pool
resurfacing improvements.
BACKGROUND INFORMATION: The work consists of removal and disposal of the existing
plaster pool finish, preparation of the surface of the
existing concrete pool shell, application of new white
plaster pool finish, installation of new drain grates covers that meet the Virginia Graeme Baker
Pool and Spa Safety Act and current pool requirements put forth by San Joaquin County Health
and Safety Department and other incidental and related work, all as shown on the plans and
specifications for the above project.
The wading pool was built in 1999 at a cost of $131,697 and replaced a 30 -year-old facility. It
was constructed using a combination of Community Development Block Grant funds, a grant
from General Mills and Parks Capital. The existing plaster finish is original and has been
patched a number of times, including last year, and is now in need of replacement.
Specifications are on file at the Parks Division office. The planned bid opening date is April 8,
2015. Construction cost estimate is $14,000.
FISCAL IMPACT: The wading pool is a revenue -generating element of Lodi Lake
Park. Revenue from the pool will somewhat offset the cost of
repairs.
FUNDING AVAILABLE
JMRAI
Funding will be identified at project award.
JEW
Parks, Recreation and Cultural Services Director