Loading...
HomeMy WebLinkAboutAgenda Report - February 18, 2015 C-11AGENDA ITEM C04 p CITY OF LODI COUNCIL COMMUNICATION TM AGENDA TITLE: Adopt Resolution Approving Amended South Wastewater Trunk Line Impact Mitigation Fee Program Schedule of Fees MEETING DATE: February 18, 2015 PREPARED BY: Public Works Director RECOMMENDED ACTION Adopt resolution approving amended South Wastewater Trunk Line Impact Mitigation Fee Program Schedule of Fees. BACKGROUND INFORMATION The City Council approved a suite of development impact mitigation fees, including the South Wastewater Trunk Line, at its meeting of August 15, 2012 (Resolution 2012-142). A copy is provided as Attachment A. Inadvertently, the adopted South Wastewater Trunk Line Fees were listed incorrectly and just recently were discovered by staff. The existing and amended South Wastewater Trunk Line Fees are presented in Attachment B. The differences include eliminating the discount for retail land uses and establishing non -discounted fees for all non-residential land uses. Staff recommends adoption of the resolution approving the amended South Wastewater Trunk Line Fees. FISCAL IMPACT: No impact, as this action corrects the fees that were previously approved by the City Council in 2012. FUNDING AVAILABLE: Not applicable. F. Wally ndelin Public Works Director FWS/smh Attachments APPROVEM n Schwaibader, City Manager K:\WP\IMFees\CIMF SouthWastewaterTrunk.doc 2/9/2015 RESOLUTION NO. 2012-142 A RESOLUTION OF THE LODI CITY COUNCIL APPROVING MASTER PLANS FOR WATER, WASTEWATER, STORM DRAINAGE, AND BICYCLE; APPROVING IMPACT MITIGATION FEE PROGRAM REPORTAND SCHEDULE OF FEES; AND APPROVING IMPACT MITIGATION FEE PROGRAM SCHEDULE OF REDUCED FEES WHEREAS, in 1991, City Council approved the impact Mitigation Fee Program (IMFP) that established impact fees in the categories of water, wastewater, storm drainage, streets, police, fire, parks, and general City facilities. An electric utility impactfee was established in 2007. With the 2010 adoption of the new General Plan for the City, it is the propertime to perform an overhaul of the IMFP; and WHEREAS, master plans for water, wastewater, storm drainage, and bicycle infrastructure have been prepared in conjunction with the IMFP and an initial study/mitigated negative declaration for the master plans has been prepared and distributed for public comments by the Community Development Department; and WHEREAS, the IMFP Report presents details regarding the assumptions, methodologies, facilities standards, projects, costs, and cost allocation factors used to establish the nexus between the fees and the development upon which the fees will be levied. The Technical Appendix to the report includes the detailed project descriptions, cost estimates, cost allocation factors, and fee calculations; and WHEREAS, the IMFP Report has been distributed to representatives of the building community and others that expressed interest in the project, and a copy was made available to the public at the Public Works Department and on the City's website; and WHEREAS, a public hearing was held to receive public comment on --the master plans, the IMFP Report and Schedule of Fees and the IMFP Schedule of Reduced Fees. NOW, THEREFORE, BE IT RESOLVED that the Lodi City Council does hereby approve the master plans for water, wastewater, storm drainage, and bicycle; and BE IT FURTHER RESOLVED that the City Council does hereby approve the Impact Mitigation Fee Program Report and Schedule of Fees, attached hereto as Exhibit A; and BE IT FURTHER RESOLVED that the City Council does hereby approve the Impact Mitigation Fee Program Schedule of Reduced Fees, attached hereto as Exhibit B. Dated: August 15, 2012 hereby certify that Resolution No. 2012-142 was passed and adopted by the City Council of the City of Lodi in a regular meeting held August 15, 2012, by the following vote: AYES: COUNCIL MEMBERS — Hansen, Johnson, Katzakian, Nakanishi, and Mayor Mounce NOES: COUNCIL MEMBERS — None ABSENT: COUNCIL MEMBERS — None ABSTAIN: COUNCIL MEMBERS— None 414-- RANDIJOHL City Clerk 2012-142 ExhibitA Impact Mitigation Fee Program Schedule of Fees Table A-1: Water and Wastewater Fees Meter Size Water Wastewater 5/8 -inch meter $2,079 $2,831 3/4 -inch meter $3,103 $4,225 1 -inch meter $5,181 $7,056 1 1/2 -inch meter $10,332 $14,070 2 -inch meter $16,537 $22,521 3 -inch meter $31,026 $42,253 4 -inch meter $51,721 $70,435 6 -inch meter $103,411 $140,828 8 -inch meter $165,464 $225,333 10 -inch meter $237,880 $323,951 Table A-2: Transportation, Police, Fire, General City Facilities, Park and RESIDENTIAL LAND USES NON-RESIDENTIAL LAND USES Low Medium High Office/ Density Density Density Retail Medical Industrial Fee Component (pul t'nit) (per Unit) (per tlnit) tiler 1,OOOSF) (per 1,OOOSF) (per 1,000SF) Transportation $711 $386 $386 $1,199 $872 $443 Police $753 $634 $528 $330 $528 $176 Fire $385 $324 $270 $338 $540 $180 Park $3,890 $3,276 $2,730 $406 $650 $217 General City Facilities $617 $519 $433 $270 $433 $144 Art in Public Places $80 $67 $56 $35 $56 $19 Table A-3: Residential Electric Utility Fees Table A-4: Non-ResidentialElectric Utility Fees 240 Volts Single Phase Panel 480 Volts 60 amps $248 100 amps $413 125 amps $516 200 amps $826 400 amps $1,652 600 amps $2'478 Table A-4: Non-ResidentialElectric Utility Fees 208 Volts 240 Volts 480 Volts Single Phase Panel 60 amps n/a $248 n/a 100 amps n/a $413 n/a 125 amps n/a $516 n/a 200 amps n/a $826 n/a 400 amps n/a $1,652 n/a 600 amps n/a $2'478 n/a Three Phase Panel 200 amps $1,178 $1,359 $2,718 400 amps $2,356 $2,718 $5,437 600 amps $3,534 $4,077 $8,155 800 amps $4,712 $5,437 $10,873 1000 amps $5,890 n/a $13,591 1200 amps $7,068 n/a $16,310 1600 amps $9,423 n/a $21,746 2000 amps $11,779 n/a $27,183 2500 amps $14,724 n/a $33,979 3000 amps $17,669 n/a $40,774 Fee Component Storm Drainage - Zone 1 Storm Drainage - Zone 2 Table A-5: Storm Drainage Fees RESIDENTIAL LAND USES NON-RESIDENTIAL LAND USES Low Medium High Retail Medical Industrial Office/ (per 1,000 so (jper 1,000 so (per 1,000sO Density Density Density Retail Medical Industrial (per Unit) (per Unit) tper Unit) (per Acre) (per Acre) (per Acre) $1,394 $697 $561 $14,640 $14,640 $15,686 $4,237 $2,118 $1,703 $44,485 $44,485 $47,663 Table A-6: South Wastewater Trunk Line Fees RESIDENTIAL LAND USES NON-RESIDENTIAL LAND USES Low Medium High Office/ Density Density Density Retail Medical Industrial Fee Component IrcFUnit) ip;-Unit) (per ll:rir:i (per 1,000 so (jper 1,000 so (per 1,000sO South Wastewater Trunk Line' $1,181 $994 $829 $1,096 n/a n/a I Applies only to developmentthatwill benefit from construction of the wastewater trunk line serving the southern area of the City. Exhibit B Impact Mitigation Fee Program Schedule of Reduced Fees Table B-1: Water and Wastewater Fees Meter Size 15/8 Residential Water Wastewater Non -Residential Water Wastewater -inch meter $846 $1,152 $2,079 $2,831 3/4 -inch meter $1,263 $1,720 $3,103 $4,225 1 -inch meter $2,109 $2,873 $5,181 $7,056 1 1/2 -inch meter $4,206 $5,728 $10,332 $14,070 2 -inch meter $6,732 $9,168 $16,537 $22,521 3 -inch meter $12,631 $17,201 $31,026 $42,253 4 -inch meter $21,056 $28,674 $51,721 $70,435 6 -inch meter $42,099 $57,331 $103,411 $I40,828 8 -inch meter $67,360 $91,733 $165,464 $225,333 10 -inch meter $96,841 $131,880 $237,880 $323,951 RESIDENTIAL LAND USES NON-RESIDENTIAL LAND USES Low Medium High Office/ Density Density Density Retail Medical Industrial Fee Component Unit) (per Unit) (per Unit) (per 1,OOOSF) (per 1,OOOSF) (tier 1,OOOSF) Transportation $289 $157 $157 $1,199 $872 $443 Police $307 $258 $215 $330 $528 $176 Fire $157 $132 $110 $338 $540 $180 Park $1,584 $1,334 $1,111 $406 $650 $217 General City Facilities $251 $211 $176 $270 $433 $144 Art in Public Places $33 $27 $23 $35 $56 $19 Table B-3: Residential Electric Utility Fees Table B-4: Non -Residential Electric Utility Fees 240 Volts Single Phase Panel 480 Volts 60 amps $101 100 amps $168 125 amps $210 200 amps $336 400 amps $673 600 amps $1,009 Table B-4: Non -Residential Electric Utility Fees 208 Volts 240 Volts 480 Volts Single Phase Panel 60 amps n/a $248 n/a 100 amps n/a $413 n/a 125 amps n/a $516 n/a 200 amps n/a $826 n/a 400 amps n/a $1,652 n/a 600 amps n/a $2,478 n/a Three Phase Panel 200 amps $1,178 $1,359 $2,718 400 amps $2,356 $2,718 $5,437 600 amps $3,534 $4,077 $8,155 800 amps $4,712 $5,437 $10,873 1000amps $5,890 n/a $13,591 1200 amps $7,068 n/a $16,310 1600 amps $9,423 n/a $21,746 2000 amps $11,779 n/a $27,183 2500 amps $14,724 n/a $33,979 3000 amps $17,669 n/a $40,774 Table &5: Storm Drainage Fees RESIDENTIAL LAND USES NON-RESIDENTIALLAND USES Office/ Retail Medical Industrial rr UiEi[ 1 (}tt+e ll[iil} (per Unit) (por Acre) (per Acre) (per Acre) 567 284 $228 $14,640 $14,640 $15,686 $1,725 $862 $693 $44,485 $44,485 $47,663 Low Medium High Density Density Density Pee Com potlent (per Unit) (per Unit) (per Unit Storm Drainage - Zone 1 $ $ $337 Storm Drainage - Zone 2 Table B-6: South Wastewater Trunk Line Fees RESIDENTIAL LAND USES Low Medium High Density Density Density Pee Com potlent (per Unit) (per Unit) (per Unit South Wastewater Trunk Line' $481 $405 $337 NON-RESIDENTIAL LAND USES Office/ Retail Medical Industrial er 1,000 so (per 1,000 sO (per 1,000 st) $446 n/a n/a Attachment B Existing - Table B-6: South Wastewater Trunk Line Fees RESIDENTIAL LAND USES Low Medium High Density Density Density Component (per Unit) (per Unit) (per Unit) :h Wastewater Trunk Line' $481 $405 $337 NON-RESIDENTIAL LAND USES Office/ Retail Medical Industrial (per 1,000 sf) (per 1,000 sf) (per 1,000 sf) $446 n/a n/a 1 Applies only to development that will benefit from construction of the wastewater trunk line serving the southern area of the City. Amended - Table B-6: South Wastewater Trunk Line Fees RESIDENTIAL LAND USES Low Medium High Density Density Density ee Component (per Unit) (per Unit) (per Unit) outh Wastewater Trunk Line' $481 $405 $337 NON-RESIDENTIAL LAND USES Office/ Retail Medical Industrial (per 1,000 sf) (per 1,000 sf) (per 1,000 sf) $1,096 $989 $490 Applies only to development that will benefit from construction of the wastewater trunk line serving the southern area of the City. K:\WP\IMFees\IMF Amend South Wastewater Trunk.xls Page 1 Attachment B Existing - Table B-6: South Wastewater Trunk Line Fees RESIDENTIAL LAND USES Low Medium High Density Density Density Component (per Unit) (per Unit) (per Unit) :h Wastewater Trunk Line' $481 $405 $337 NON-RESIDENTIAL LAND USES Office/ Retail Medical Industrial (per 1,000 sf) (per 1,000 sf) (per 1,000 sf) $446 n/a n/a 1 Applies only to development that will benefit from construction of the wastewater trunk line serving the southern area of the City. Amended - Table B-6: South Wastewater Trunk Line Fees RESIDENTIAL LAND USES Low Medium High Density Density Density ee Component (per Unit) (per Unit) (per Unit) outh Wastewater Trunk Line' $481 $405 $337 NON-RESIDENTIAL LAND USES Office/ Retail Medical Industrial (per 1,000 sf) (per 1,000 sf) (per 1,000 sf) $1,096 $989 $490 Applies only to development that will benefit from construction of the wastewater trunk line serving the southern area of the City. K:\WP\IMFees\IMF Amend South Wastewater Trunk.xls Page 1 RESOLUTION NO. 2015-16 A RESOLUTION OF THE LODI CITY COUNCIL APPROVING AMENDED SOUTH WASTEWATER TRUNK LINE IMPACT MITIGATION FEE PROGRAM SCHEDULE OF FEES ------------------- WHEREAS, on August 15, 2012, City Council approved Resolution No. 2012-142 thereby adopting the suite of development impact mitigation fees including the South Wastewater Trunk Line Fees; and WHEREAS, the South Wastewater Trunk Line Fees were inadvertently listed incorrectly and just recently discovered by staff. The differences include eliminating the discount for retail land uses and establishing non -discounted fees for all non-residential land uses. The amended South Wastewater Trunk Line Fees are shown on Exhibit A; and WHEREAS, staff recommends amending Resolution No. 2012-142 by repealing and re-enacting Table B-6: South Wastewater Trunk Line Fees (as shown on Exhibit A). NOW, THEREFORE, BE IT RESOLVED that the City Council does hereby approve amending Resolution No. 2012-142 by repealing and re-enacting Amended - Table B-6: South Wastewater Trunk Line Fees, as set forth on the attached Exhibit A. Dated: February 18, 2015 I hereby certify that Resolution No. 2015-16 was passed and adopted by the City Council of the City of Lodi in a regular meeting held February 18, 2015, by the following vote: AYES: COUNCIL MEMBERS — Chandler, Kuehne, Mounce, Nakanishi, and Mayor Johnson NOES: COUNCIL MEMBERS — None ABSENT: COUNCIL MEMBERS — None ABSTAIN: COUNCIL MEMBERS — None .�" )N"NIFE FERRAIOLO City Clerk 2015-16 Exhibit A Amended - Table B-6: South Wastewater Trunk Line Fees RESIDENTIAL LAND USES NON-RESIDENTIAL LAND USES Low Medium High Office/ Density Density Density Retail Medical Industrial Fee Component (per Unit) (per Unit) (per Unit) (per 1,000 sf) (per 1,000 so (per 1,000 so South Wastewater Trunk Line $481 $405 $337 $1,096 $989 $490 i Applies only to development that will benefit from construction of the wastewater trunk line serving the southern area of the City. K:\WP\COUNCIL\Resolutions\2015\021815\IMF Amend South Wastewater Trunk Resolution Exhibit A.Rlage 1