HomeMy WebLinkAboutAgenda Report - February 18, 2015 C-07AGENDA ITEM CqP7
'' CITY OF LODI
D
COUNCIL COMMUNICATION
TM
AGENDA TITLE: Adopt Resolution Awarding Contract for City Hall Annex First Floor Phase 2 Interior
Remodel Project to Diede Construction, Inc., of Woodbridge, ($2,492,000) and
Appropriating Funds ($2,754,150)
MEETING DATE: February 18, 2015
PREPARED BY: Public Works Director
RECOMMENDED ACTION Adopt resolution awarding contract for City Hall Annex First Floor
Phase 2 Interior Remodel Project to Diede Construction, Inc., of
Woodbridge, in the amount of $2,492,000 and appropriating funds
in the amount of $2,754,150.
BACKGROUND INFORMATION: The Phase 2 project will include offices for the Recreation and Fire
Administration divisions, public lobbies, public counters, ADA
access, ADA staff bathroom facilities, lighting, communications,
space conditioning and associated staff support areas. There are currently 27 staff members in the two
divisions. The area is approximately 6,000 square feet. The project also includes several items to
improve services to the entire building, as well as the Civic Center complex. These are a new emergency
generator, installation of new main electrical switchgear, relocating the data server and telephone rooms
from the basement to the first floor, future relocation of the radio room to the first floor, and installation of
a new chiller unit to serve the City Hall Annex, Finance, Fire Station 1 (first floor), Carnegie Forum and
City Hall. A drawing of the project floor plan is attached for reference as Exhibit A.
Plans and specifications for this project were approved on November 6, 2013. The City received the
following 10 bids for this project on January 20, 2015. Diede Construction, Inc. has signed the required
Local Hire forms and will conform to the requirements.
Bidder
Location
Base Bid
Engineer's Estimate
$2,363,000
Diede Construction, Inc.
Woodbridge
$2,492,000
SW Allen Construction, Inc.
Sacramento
$2,505,396
American River Construction, Inc.
EI Dorado
$2,519,000
PNP Construction
Auburn
$2,549,474
Sierra Valley Construction
Loomis
$2,598,000
Bobo Construction, Inc.
Elk Grove
$2,652,000
Barker & Assoc/Star Construction
Sacramento
$2,668,000
F&H Construction
Lodi
$2,799,000
Arbor Building Group
Lafayette
$2,850,000
D.G. Granade
Shingle Springs
$2,936,000
APPROVE
Stephen Schwabauer, Oiify Manager
K:\WP\PROJECTS\MISC\City Hall Annex 1 stPoor Remodel 2013\CAward City Hall Annex Ph 2.doc
2/9/2015
Adopt Resolution Awarding Contract for City Hall Annex First Floor Phase 2 Interior Remodel Project to
Diede Construction, Inc., of Woodbridge, ($2,492,000) and Appropriating Funds ($2,754,150)
February 18, 2015
Page 2
FISCAL IMPACT: The project will eliminate ongoing maintenance costs associated with the
outdated chiller and electrical systems serving the City Hall Annex and
other Civic Center buildings.
FUNDING AVAILABLE This project will be funded through a combination of funds from CDBG,
Public Benefits, General Fund, Water Utility, Wastewater Utility and Electric
Utility.
Details for each funding source are listed below. An appropriation adjustment form is attached.
Source
Amount
General Fund Capital Outlay
$85,936
CDBG
$57,200
Public Benefits Fund
$881,880
Water Fund
$576,378
Wastewater Fund
$576,378
Electric Utility Fund
$576,378
Total
$2,754,150
Jordan Ayers
Deputy City Manager/Internal Services Director
F. Wally Pndelin
Public Works Director
Prepared by Gary Wiman, Construction Project Manager
FWS/GW/smh
Attachment
K:\WP\PROJECTS\MISC\City Hall Annex 1 st Floor Remodel 2013\CAward City Hall Annex Ph 2 doc 2/9/2015
(hibit A
■r1.
WMB
ARCHITECTS
5257 Padac Avenue
S.m 226
Stockton CA 85207
20A9J4.9110 T
209.9645711 F
www.wmbartMtapa—
U. Wenell
Tlm WMab
Tom Bawe
Doug Davie
Melanle Vous
P&dpal Arohkeda
CITY HALL ANNEX
1ST FLOOR PHASE II
INTERIOR REMODEL
FLOOR PLAN
FLOOR PLAN - 1ST FLOOR
SCALE: VT=1'W
FLOOR PLAN LEGEND:
1>_ en]i.cear�na.tenxW
•••�• eew law�xw.at�srP+w6wrras
2A SPEC' I
la aW,SY]pOw,y' 6tlrfw•/flll]nynmluros
m .dwa]rr]]�Osa.rsn6ma•+1e]nw eAro,.
w %'
a�a�Eel ��aeccszconnae.n�+ouuwf+uee+e.,�
]t ��awa.-wu�.w�+.�ywa.aaamx
sv arw r'sa �.w...�+awn
21 oNlwiuu� 1w
aha elfewal®Ne1Nre1aal1�Al0,MWaRaau
UNIE-1111-11K 11
]'1 awrEn N�sN rovme F.
TEe'M'a AFF..EXIENo
PUBLISH HISTORY
A — —.—
FLOOR
.—
WMB PROJECT.
M
orv.
NaEa
1%']0®t 04
f aoaFoaba
RMa®IPO-�(wama
m�-'-rc
aaawN.
xcwaa
o]nom ea
6 wocew.LL
n�„woo
6 ��
mm,ao-
rwT,�ex rw]ea
w.
ewuT
a p]1s,saAa
mww n.r,.
PUBLISH HISTORY
A — —.—
FLOOR
.—
WMB PROJECT.
M
CITY HALL ANNEX 1ST FLOOR
PHASE 2 INTERIOR REMODEL Contract
CITY OF LODI, CALIFORNIA
THIS CONTRACT made by and between the CITY OF LODI, State of California, herein referred to as
the "City," and DIEDE CONSTRUCTION, INC., herein referred to as the "Contractor."
WITNESSETH:
That the parties hereto have mutually covenanted and agreed, and by these presents do covenant and
agree with each other, as follows:
The complete Contract consists of the following documents which are incorporated herein by this
reference, to -wit:
Notice Inviting Bids
Information to Bidders
General Conditions
Special Provisions
Bid Proposal
Contract
Contract Bonds
Plans (Drawings)
Specifications
Addenda
All of the above documents, sometimes hereinafter referred to as the "Contract Documents," are
intended to cooperate so that any work called for in one and not mentioned in the other is to be
executed the same as if mentioned in all said documents.
ARTICLE I - That for and in consideration of the payments and agreements hereinafter mentioned, to
be made and performed by the City and under the condition expressed in the two bonds bearing even
date with these presents and hereunto annexed, the Contractor agrees with the City, at Contractor's cost
and expense, to do all the work, furnish all labor and furnish all the materials except such as are
mentioned in the specifications to be furnished by the City, necessary to construct and complete in a
good workmanlike and substantial manner and to the satisfaction of the City the proposed
improvements as shown and described in the Contract Documents which are hereby made a part of the
Contract.
ARTICLE II - The City hereby promises and agrees with the Contractor to employ, and does hereby
employ, the Contractor to provide all materials and services not supplied by the City and to do the
work according to the terms and conditions for the price herein, and hereby contracts to pay the same
as set forth in Clauses 65 and 66 General Conditions, in the manner and upon the conditions above set
forth; and the said parties for themselves, their heirs, executors, administrators, successors and assigns,
do hereby agree to the full performance of the covenants herein contained.
ARTICLE III - The Contractor agrees to conform to the provisions of Chapter 1, Part 7, Division 2 of
the Labor Code. The Contractor and any Subcontractor will pay the general prevailing wage rate and
other employer payments for health and welfare, pension, vacation, travel time, and subsistence pay,
apprenticeship or other training programs. The responsibility for compliance with these Labor Code
requirements is on the prime contractor.
K:\WP\PROJECTS\MISC\CITY HALL ANNEX 1ST FLOOR REMODEL 2013\DECEMBER 2014 BID DOCS\CITY HALL ANNEX REMODEL BID DOCUMENTS\CHARP2
CONTRACT.DOC
CITY HALL ANNEX 1ST FLOOR
PHASE 2 INTERIOR REMODEL Contract
ARTICLE IV - And the Contractor agrees to receive and accept the following prices as full
compensation for furnishing all materials and for doing all the work contemplated and embraced in this
agreement; also for all loss or damage arising out of the nature of the work aforesaid or from the action
of the elements, or from any unforeseen difficulties or obstructions which may arise or be encountered
in the prosecution of the work until its acceptance by the City, and for all risks of every description
connected with the work; also for all expenses incurred by or in consequence of the suspension or
discontinuance of work and for well and faithfully completing the work, and the whole thereof, in the
manner and according to the Plans and Contract Documents and the requirements of the Engineer
under them, to -wit:
Item Description Unit Total Price
City Hall Annex 1S Floor
Phase 2 Interior Remodel Project (Lump Sum) $ 2,492,000.00
Total Contract Amount: TWO MILLION, FOUR HUNDRED NINETY TWO THOUSAND, AND
00/100.
ARTICLE V - By my signature hereunder, as Contractor, I certify that I am aware of the provisions of
Section 3700 of the Labor Code, which requires every employer to be insured against liability for
workers' compensation or to undertake self-insurance in accordance with the provisions of that code,
and I will comply with such provisions before commencing the performance of the work of this
contract.
ARTICLE VI - It is further expressly agreed by and between the parties hereto that, should there be
any conflict between the terms of this instrument and the Bid Proposal of the Contractor, then this
instrument shall control and nothing herein shall be considered as an acceptance of the said terms of
said proposal conflicting herewith.
ARTICLE VII - The City is to furnish the necessary rights-of-way and easements and to establish lines
and grades for the work as specified under the Special Provisions. All labor or materials not mentioned
specifically as being done by the City will be supplied by the Contractor to accomplish the work as
outlined in the specifications.
ARTICLE VIII - The Contractor agrees to commence work pursuant to this contract and to diligently
prosecute to completion within 180 CALENDAR DAYS.
When signing this contract, the contractor agrees that the time of completion for this contract is
reasonable and the contractor agrees to pay the city liquidated damages of $2,500.00 per day for each
day the work is not completed beyond the time specified in the preceding paragraph. Contractor
agrees that this amount may be deducted from the amount due the contractor under the contract.
ARTICLE IX - No contractor or subcontractor may be listed on a bid proposal for a public works
project (submitted on or after March 1, 2015) unless registered with the Department of Industrial
Relations pursuant to Labor Code section 1725.5 [with limited exceptions from this requirement for
bid purposes only under Labor Code section 1771.1(a)]. No contractor or subcontractor may be
awarded a contract for public work on a public works project (awarded on or after April 1, 2015)
unless registered with the Department of Industrial Relations pursuant to Labor Code section 1725.5.
This project is subject to compliance monitoring and enforcement by the Department of Industrial
Relations. Note: SB 854 requires that the awarding agency include the above language in bid
invitations and contracts for all projects being awarded on or after January 1, 2015. The contractor is
responsible for reviewing SB 854 prior to submitting a bid to ensure compliance.
K:\WP\PROJECTS\MISC\CITY HALL ANNEX 1ST FLOOR REMODEL 2013\DECEMBER 2014 BID DOCS\CITY HALL ANNEX REMODEL BID DOCUMENTS\CHARP2
CONTRACT.DOC
CITY HALL ANNEX 1" FLOOR
PHASE 2 INTERIOR REMODEL
Contract
IN WITNESS WHEREOF, the parties to these presents have hereunto set their hands
the year and date written below.
CONTRACTOR:
DIEDE CONSTRUCTION, INC.
By:
Title
(CORPORATE SEAL)
CITY OF LODI, a municipal corporation
STEPHEN SCHWABAUER
City Manager
Date:
Attest:
JENNIFER M. FERRAIOLO
City Clerk
Approved As To Form
JANICE D. MAGDICH
City Attorney
01/29/15
1. AA#
2. JV#
ciTv of LoDi
APPROPRIATION ADJUSTMENT REQUEST
a-Yadav
4. DEPARTME
6. REQUEST ADJUSTMENT OF APPROPRIATION AS LISTED BELOW
FUND #
BUS. UNIT #
ACCOUNT #
ACCOUNT TITLE
AMOUNT
A
431
43100000
50001
Ooerating Transfers In
$
2,611,014.00
SOURCE OF
431
32205
Fund Balance
$
85 936.00
FINANCING
531
32205
Fund Balance
$
576 378.00
561
32205
Fund Balance
$
576,378.00
500
32205
Fund Balance
$
576,378.00
504
32205
Fund Balance
$
881,880.00
350 56304 CDBG $
57,200.00
B.
431
43199000
77020
City Hall Annex
$
2 696 950.00
USE OF
FINANCING
531
53199000
76220
Operating Transfers Out
$
576,378.00
561 56199000 76220 Operating Transfers Out $
576 378.00
501
50199000
76220
Operating Transfers Out
$
576 378.00
504
350
50499000
35099000
76220
77020
Operating Transfers Out
iCity Hall Annex ADA
$
$
881.880.00
57,200.00
7. REQUEST IS MADE TO FUND THE FOLLOWING PROJECT NOT INCLUDED IN THE CURRENT BUDGET
Please provide a description of the project, the total cost of the project, as well as justification for the
requested adjustment. If you need more space, use an additional sheet and attach to this form.
ct for City Hall Annex 1st Floor Phase 2 Interior Remodel project to Diede Construction.
IIf Council has authorized the appropriation adjustment, complete the following:
Meeting Date: Res No: d Attach copy of resolution to this form.
Department Head Signature:
B. APPROVAL SIGNATURES
Deputy City Manager/Internal Services Manager Date
Submit completed form to the Budget Division with any required documentation.
Final approval will be provided in electronic copy format.
RESOLUTION NO. 2015-12
A RESOLUTION OF THE LODI CITY COUNCIL AWARDING AND
AUTHORIZING THE CITY MANAGER TO EXECUTE THE CONTRACT
FOR THE CITY HALL ANNEX FIRST FLOOR PHASE 2 INTERIOR
REMODEL PROJECT AND FURTHER APPROPRIATING FUNDS
WHEREAS, in answer to notice duly published in accordance with law and the order of
this City Council, seated proposals were received and publicly opened on January 22, 2015, at
11:00 a.m., for the City Hall Annex First Floor Phase 2 Interior Remodel Project, described in
the plans and specifications therefore approved by the City Council on November 6, 2013; and
WHEREAS said bids have been checked and tabulated and a report thereof filed with
the City Manager as follows:
Bidder
Bid
Diede Construction, Inc.
$2,492,000
SW Allen Construction, Inc.
$2,505,396
American River Construction, Inc.
$2,519,000
PNP Construction
$2,549,474
Sierra Valley Construction
$2,598,000
Bobo Construction, Inc.
$2,652,000
Barker & Assoc/Star Construction
$2,668,000
F&H Construction
$2,799,000
Arbor Building Group
$2,850,000
D.G. Granade
$2,936,000
WHEREAS, staff recommends awarding the contract to the low bidder,
Diede Construction, Inc., in the amount of $2,492,000.
NOW, THEREFORE, BE IT RESOLVED that the Lodi City Council does hereby award
the contract for the City Hall Annex First Floor Phase 2 Interior Remodel Project to the low
bidder, Diede Construction, Inc., of Woodbridge, California, in the amount of $2,492,000; and
BE IT FURTHER RESOLVED, that the City Manager is hereby authorized to execute the
contract; and
BE IT FURTHER RESOLVED that funds in the amount of $2,754,150 be appropriated
for this project; and
BE IT FURTHER RESOLVED that the Water Utility Fund will loan to the Electric Utility
Fund the amount of $576,378 to be repaid in a single installment on January 1, 2018, along with
accrued interest at the LAIF rate on that date.
Dated: February 18, 2015
I hereby certify that Resolution No. 2015-12 was passed and adopted by the City
Council of the City of Lodi in a regular meeting held February 18, 2015, by the following vote:
AYES: COUNCIL MEMBERS — Chandler, Kuehne, Mounce, Nakanishi, and
Mayor Johnson
NOES: COUNCIL MEMBERS — None
ABSENT: COUNCIL MEMBERS — None
ABSTAIN: COUNCIL MEMBERS — None
V , J-VAAL4
NIFE FERRAIOLO
City Clerk
2015-12
AGENDA ITEM Co7
, - CITY OF LODI
COUNCIL COMMUNICATION
TM
AGENDA TITLE: Adopt Resolution Awarding Contract for City Hall Annex First Floor Phase 2 Interior
Remodel Project to Diede Construction, Inc., of Woodbridge, ($2,492,000) and
Appropriating Funds ($2,754,150)
MEETING DATE: February 18, 2015
PREPARED BY: Public Works Director
RECOMMENDED ACTION: Adopt resolution awarding contract for City Hall Annex First Floor
Phase 2 Interior Remodel Project to Diede Construction, Inc., of
Woodbridge, in the amount of $2,492,000 and appropriating funds
in the amount of $2,754,150.
BACKGROUND INFORMATION: The Phase 2 project will include offices for the Recreation and Fire
Administration divisions, public lobbies, public counters, ADA
access, ADA staff bathroom facilities, lighting, communications,
space conditioning and associated staff support areas. There are currently 27 staff members in the two
divisions. The area is approximately 6,000 square feet: The project also includes several items to
improve services to the entire building, as well as the Civic Center complex. These are a new emergency
generator, installation of new main electrical switchgear, relocating the data server and telephone rooms
from the basement to the first floor, future relocation of the radio room to the first floor, and installation of
a new chiller unit to serve the City Hall Annex, Finance, Fire Station 1 (first floor), Carnegie Forum and
City Hall. A drawing of the project floor plan is attached for reference as Exhibit A.
Plans and specifications for this project were approved on November 6, 2013. The City received the
following 10 bids for this project on January 20, 2015. Diede Construction, Inc. has signed the required
Local Hire forms and will conform to the requirements.
Bidder
Location
Base Bid
Engineer's Estimate
$2,363,000
Diede Construction, Inc.
Woodbridge
$2,492,000
SW Allen Construction, Inc.
Sacramento
$2,505,396
American River Construction, Inc.
EI Dorado
$2,519,000
PNP Construction
Auburn
$2,549,474
Sierra Valley Construction
Loomis
$2,598,000
Bobo Construction, Inc.
Elk Grove
$2,652,000
Barker & Assoc/Star Construction
Sacramento
$2,668.000
F&H Construction
Lodi
$2,799,000
Arbor Building Group
Lafayette
$2,850,000
D.G. Granade
Shingle Springs
$2,936,000
APPROVED: i
c r, City Manager
K:\WP\PROJECTS\MISC\City Hall Annex 1 st Floor Remodel 2013\CAward City Hall Annex Ph 2.doc
2/13/2015
Adopt Resolution Awarding Contract for City Hall Annex First Floor Phase 2 Interior Remodel Project to
Diede Construction, Inc., of Woodbridge, ($2,492,000) and Appropriating Funds ($2,754,150)
February 18, 2015
Page 2
FISCAL IMPACT: The -project will eliminate ongoing maintenance costs associated with the
outdated chiller and electrical systems serving the City Hall Annex and
other Civic Center buildings.
FUNDING AVAILABLE: This project will be funded through a combination of funds from CDBG,
Public Benefits, General Fund Capital Outlay, Water Utility, Wastewater
Utility and Electric Utility. The Electric Utility component of funding will
initially be provided by a loan from the Water Utility. Electric Utility
will repay the Water Utility in Fiscal Year 2017/18 with interest at the
LAIF rate.
Details for each funding source are listed below. An appropriation adjustment form is attached.
Source
Amount
General Fund Capital Outlay
$85,936
CDBG
$57,200
Public Benefits Fund
$881,880
Water Fund
$576,378
Wastewater Fund
$576,378
Electric Utility Fund
$576,378
Total
$2,754,150
Jordan Ayers
Deputy City Manager/Internal Services Director
F. Wally Sandelin
Public Works Director
Prepared by Gary Wiman, Construction Project Manager
FWS/GW/smh
Attachment
K:\WP\PROJECTS\MISC\City Hall Annex 1 st Floor Remodel 2013\CAward City Hall Annex Ph 2.doc 2/13/2015
RESOLUTION NO. 2015
A RESOLUTION OF THE LODI CITY COUNCIL AWARDING
AND AUTHORIZING THE CITY MANAGER TO EXECUTE THE
CONTRACT FOR THE CITY HALL ANNEX FIRST FLOOR
PHASE 2 INTERIOR REMODEL PROJECT AND FURTHER
APPROPRIATING FUNDS
WHEREAS, in answer to notice duly published in accordance with law and the order of
this City Council, sealed proposals were received and publicly opened on January 22, 2015, at
11:00 a.m., for the City Hall Annex First Floor Phase 2 Interior Remodel Project, described in
the plans and specifications therefore approved by the City Council on November 6, 2013; and
WHEREAS said bids have been checked and tabulated and a report thereof filed with
the City Manager as follows:
Bidder
Bid
Diede Construction, Inc.
$2,492,000
SW Allen Construction, Inc.
$2,505,396
American River Construction, Inc.
$2,519,000
PNP Construction
$2,549,474
Sierra Valley Construction
$2,598,000
Bobo Construction, Inc.
$2,652,000
Barker & Assoc/Star Construction
$2,668,000
F&H Construction
$2,799,000
Arbor Building Group
$2,850,000
D.G. Granade
$2,936,000
WHEREAS, staff recommends awarding the contract to the low bidder,
Diede Construction, Inc., in the amount of $2,492,000.
NOW, THEREFORE, BE IT RESOLVED that the Lodi City Council does hereby award
the contract for the City Hall Annex First Floor Phase 2 Interior Remodel Project to the low
bidder, Diede Construction, Inc., of Woodbridge, California, in the amount of $2,492,000; and
BE IT FURTHER RESOLVED, that the City Manager is hereby authorized to execute the
contract; and
BE IT FURTHER RESOLVED that funds in the amount of $2,754,150 be appropriated
for this project; and
BE IT FURTHER RESOLVED that the Water Utility Fund will loan to the Electric
Utility Fund the amount of $576,378 to be repaid in a single installment on
January 1, 2018, along with accrued interest at the LAIF rate on that date.
Dated: February 18, 2015
I hereby certify that Resolution No. 2015- was passed and adopted by the City
Council of the City of Lodi in a regular meeting held February 18, 2015, by the following vote:
AYES: COUNCIL MEMBERS —
NOES: COUNCIL MEMBERS —
ABSENT: COUNCIL MEMBERS —
ABSTAIN: COUNCIL MEMBERS —
JENNIFER M. FERRAIOLO
City Clerk
2015-