Loading...
HomeMy WebLinkAboutAgenda Report - December 17, 2014 C-14AGENDA ITEIVI C-14 Crrv on Lonr C ouxcu, C ovrMUNrcATIoN TM AGENDA TITLE: MEETING DATE: December 17,2014 PREPARED BY: Public Works Director Adopt Resolution Authorizing City Manager to Execute Addendum to the Memorandum of Understanding (MOU) with San Joaquin County for Provision of Storm Water Service (Woodbridge) RECOMMENDED ACTION Adopt resolution authorizing City Manager to execute Addendum to the Memorandum of Understanding (MOU) with San Joaquin County for provision of storm water service (Woodbridge). BACKGROUND INFORMATION: ln 2008, San Joaquin County (County) initiated a series of improvement projects in the southerly portion of the Woodbridge Limits some orthe proposed p'oj".t',îlì,i['[Jil""i:?fil åi:ilå'3fîUi'åffniï"ï;nto* "*u requirements. The logical point of terminal discharge for the County storm drain system is the Woodbridge lrrigation District (WlD) canal; however, WID does not allow storm water discharges to the canal at this location. At the request of the County, on January 13, 2008, the City and the County entered into Memorandum of Understanding A-09-15 (MOU) outlining the terms and conditions for the City to provide terminal storm drain service to the Woodbridge drainage area shown in Attachment A. The County is planning the last phase of the multi-phase improvement project. The project includes roadway resurfacing and installation of curb, gutter and sidewalks on Orange Street, Carolina Street and Academy Street. The project will add approximately 3.5 acres of storm watershed area to the City's storm drain system. Staff has determined the existing City storm drainage system has the conveyance and pumping capacity to serve the additional area. The Addendum is provided as Attachment B and the major points are: County shall comply with the terms of a City-issued Discharge Permit per ltem 2 of the Addendum. County shall pay the City in the amount of $100,105.97 to cover the one -time Lodi Lake Pump Station capacity fee ($1,653.78), one-time Storm Drainage lmpact Mitigation Fee ($96,844.92), and 4 years maintenance storm facilities maintenance fee ($992.27). Term of the Addendum to coincide with the CítyMlD Storm Drainage Agreement (SDA) that is set to expire in four years. The MOU will be renewed concurrently with the SDA. Staff recommends the Council to authorize the City Manager to execute the Addendum with the County APPROVED a a a n K:\WP\StormwateAMOUwoodbr¡dgeStormwater\CC_MOU_ADD.doc ity Manager 121812014 Adopt Resolution Authorizing City Manager to Execute Addendum to the Memorandum of Understanding (MOU) with San Joaquin County for Provision of Storm Water Service (Woodbridge) December 17,2014 Page2 FISCAL IMPACT:There will be a slight increase in the long-term operation and maintenance of the added storm water into the City's storm drainage system. However, the additional operation and maintenance costs will be paid by the County. FUNDING AVAILABLE: Not applicable N F. Wally Sandelin Public Works Director Prepared by Lyman Chang, Senior Civil Engineer FWS/LC/smh Attachmentcc: City Attorney San Joaquin County Supervisor Stephanie Kong, County's Engineer lV Utility Superintendent-PW Senior Civil Engineer, Chang K:\WP\Stormwater\MOUWoodbridgestormwater\CC_MOU_ADD.doc 12t8t2014 RESOLUTION NO. 2014-232 A RESOLUTION OF THE LODI CITY COUNCIL AUTHORIZING THE CITY MANAGER TO EXECUTE AN ADDENDUM TO THE MEMoRANDUMoFUNDERSTANDINGWITHSANJoAQUIN CoUNTYFoRPRoVISIONoFSToRMWATERSERVICE (wooDBRlDGE) ======================================================================== WHEREAS, the City and San Joaquin County (County) entered into a Memorandum of understanding No. A-0g-1'5 (MOU) in January 2008, in which the city is to provide storm árainage conñection to handle the storm water irom the specified drainage area. The County is planniñg the last phase of the improvement project in 2015; and WHEREAS, County would otherwise discharge the storm water to the Woodbridge lrrigation District WID) caÁal; however, WID does not allow additional storm water discharges to the canal; and WHEREAS, staff has determined the existing City storm drainage system has the conveyance and pumping capacity to serve the additional area; and WHEREAS, major points of the addendum are: o County shall comply with the terms of a City-issued Discharge Permit per ltem 2 of the Addendum. o County shall pay the City in the amount of $100,105.97 to cover the one-time Lodi Lake pump Station cåpacity fáe (g1,653.78), one-time Storm Drainage lmpact Mitigation Fee ($gO,g¿¿.g2), andfoui years maintenance storm facilities maintenance fee ($992.27). . Term of the Addendum to coincide with the CityAfflD Storm Drainage Agreement (!On¡ that is set to expire in four years. The MOU will be renewed concurrently with the SDA' NOW, THEREFORE, BE tT RESOLVED that the Lodi city council does hereby authorize the City Manager to execute an addendum to the Memorandum of Understanding with San Joaquin County forþrovision of storm water service (Woodbridge)' 3::"=1===3="=:"I:::tl:3!J!================================================= I hereby certify that Resolution No. 2014-232 was passed and adopted by the City Council of the City of iodi in a regular meeting held December 17,2014, by the following vote: AYES:couNclL MEMBERS - Chandler, Kuehne, Mounce, Nakanishi, and Mayor Johnson COUNCIL MEMBERS - None COUNCIL MEMBERS - None COUNCIL MEMBERS - None NOES: ABSENT: ABSTAIN NIFER City Clerk 2014-232 ROBISON CITY COUNCIL PHIL KATZAKIAN, Mayor LARRY D. HANSEN, Mayor Pro Tempore BOB JOHNSON JOANNE L. MOUNCE ALAN NAKANISHI CITY OF' LODI PUBLIC V/ORKS DEPARTMENT CITY HALL, 221 WEST PINE STREET P.O. BOX 3006 LODt, CALTFORNIA 95241-191Q (2oe) 333-6706 FAX (209) 333-6710 EMAIL pwdept@lodi.gov http:\\www.lod i. gov December 10,2014 STEPHEN SCHWABAUER CitY Manager JENNIFER M. ROBISON CitY Clerk JANICE D. MAGDICH City Attorney F. WALLY SANDELIN Public Works Director San Joaquin County Board d of Supervisors Attn: Carlos Villapudua, Chariman 44 North San Joaquin Street Sixth Floor, STE. 627 Stockton, CA 95202 San Joaquin County Public Works Attn: Stephanie Kong, PE 1810 East Hazelton Avenue Stockton, CA 95205 SUBJECT: Adopt Resolution Authorizing City Manager to Execute Addendum to the Memorandum of Understanding (MOU) with San Joaquin County for Provision of Storm Water Service (Woodbridge) Enclosed is a copy of background information on an item on the City Council agenda of Wednesday, December 17,2014. The meeting will be held at 7 p.m. in the City Council Chamber, Carnegie Forum, 305 West Pine Street. This item is on the consent calendar and is usually not discussed unless a Council Member requests discussion. The public is given an opportunity to address items on the consent calendar at the appropriate time. lf you wish to write to the City Council, please address your letter to City Council, City of Lodi, P. O. Box 3006, Lodi, California,95241-1910. Be sure to allow time for the mail. Or, you may hand-deliver the letter to City Hall, 221 West Pine Street. lf you wish to address the Council at the Council Meeting, be sure to fill out a speaker's card (available at the Carnegie Forum immediately prior to the start of the meeting) and give it to the City Clerk. lf you have any questions about communicating with the Council, please contact Jennifer Robison, City Clerk, at (209) 333-6702. lf you have any questions about the item itself, please call Lyman Chang at (209) 333- 6706.'ì F. Wally Sandelin Public Works Director FWS/smh Enclosure cc: City Clerk (- NCCMTG.DOC