Loading...
HomeMy WebLinkAboutAgenda Report - December 17, 2014 C-13AGENDA ITEM c4 3 Crrv on Lour C ouNcrr-, C oivTMUNICATIoN TM AGENDA TITLE: MEETING DATE: PREPARED BY: Adopt Resolution Authorizing City Manager to Execute Professional Services Agreement with KPFF Consulting Engineers, of Roseville, for Engineering Design Services for the Municipal Utility Services Transit Bus Wash Project ($56,134) December 17,2014 Public Works Director RECOMMENDED ACTION: Adopt resolution authorizing City Manager to execute professional services agreement with KPFF Consulting Engineers, of Roseville, for engineering design services for the Municipal Utility Services Transit Bus Wash Project in the amount of $56,134. BACKGROUND INFORMATION: As part of the Fiscal Year 2014115 budget, City Council approved funding for the design and installation of a proposed transit bus wash system to be located in the existing wash bay at Municipal Utility Services. This project was included in the updated Short Range Transit Plan accepted by Council in September 2013. The existing wash bay is an open bay used by City staff to remove debris from the street sweeper and other City vehicles with standard water hoses. The proposed transit bus wash project includes modifications to the existing wash bay and adjacent area by installing a fixed gantry drive through wash system, water storage tank, water recycling system, and detergent containers. The project will provide a multi-use wash bay suitable for washing buses, heavy-duty maintenance vehicles, and light-duty vehicles. The water recycling system will save water while reducing discharges to the wastewater system. The scope of work for this project includes design, preparation of construction documents, and engineering support during the bidding process. Requests for proposals were initially solicited in June 2014; however, City staff received only one proposal from KPFF Consulting Engineers. To assure full and open competition, requests for proposals were again solicited in September 2014 through an integrated marketing service. The City received the following two proposals on October 14,2014: Proposer Location Original Proposal Fee KPFF Consulting Engineers Roseville $68,687 Taylor Systems Engineering, lnc. Fair Oaks $106,340 Based on consultant qualifications and experience, staff recommends retaining KPFF for this project. Construction support and record drawing preparations were removed from the scope of work since these items are not required for the design phase. The contract amount was adjusted to $56,134 excluding these two items. The total project budget is $64,000 for design, construction documents, and other project-related expenses, including staff time and contingencies. Transportation Development Act funds will be utilized for the design work and construction. Construction is anticipated to begin in the summer of 2015. APPROVE n K:\WP\PROJ ECTS\TRANSIT\MSC Bus Wash\cawardKPFFdesign.doc r, City Manager 12t4t2014 Adopt Resolution Authorizing City Manager to Execute Professional Services Agreement with KPFF Consulting Engineers, of Roseville, for Engineering Design Services for the Municipal Utility Services Transit Bus Wash Project ($56,134) December 17,2014 Page 2 FISCAL IMPACT: FUNDING AVAILABLE: Not applicable. Capital Equipment Purchase Fund (60199000) Jordan rs Deputy City Manager/l al Services Director F. Wally delin Public Works Director Prepared by Paula J, Fernandez, Transportation Manager/Senior Traffic Engineer FWS/PJF/smh cc: KPFF Matt Boyer and Associates Transportation Manager/Senior Traffic Engineer City Engineer / Deputy Public Works Director K:\WP\PROJ ECTS\TRANSIT\MSC Bus Wash\cawardKPFFdesign.doc 12t4t2014 RESOLUTTON NO. 201 4-231 A RESOLUTION OF THE LODI CITY COUNCIL AUTHORIZING THE CITY MANAGER TO EXECUTE A PROFESSIONAL SERVICES AGREEMENT WITH KPFF CONSULTING ENGINEERS, OF ROSEVILLE, FOR ENGINEERING DESIGN SERVICES FOR THE MUNICIPAL UTILITY SERVICES TRANSIT BUS WASH PROJECT = === == ====== =================== = ==== ========== == ============= ==== == WHEREAS, the City Council approved funding for the design and installation of a proposed transit bus wash system to be located in the existing wash bay at the Municipal Utility Services as part of the Fiscal Year 2014115 budget process, and WHEREAS, requests for proposals were initially solicited in June 2014, only receiving one proposalfrom KPFF Consulting Engineers; and WHEREAS, to assure futl and open competition, Requests for Proposals were again solicited in September 2014 through an integrated marketing service. The City received the following two proposals on October 14,2014: WHEREAS, based on consultant qualifications and experience, staff recommends retaining KPFF for this project. Construction support and record drawing preparations were removeã from the scope of work since these items are not required for the design phase. Ïhe contract amount was adjusted to $56,134 excluding these two items. NOW, THEREFORE, BE lT RESOLVED that the Lodi City Council does hereby authorize the City Manager to execute a Professional Services Agreement with KPFF Consulting Engineers, of Roseville, California, for engineering design services for the Municipal Utility Services Transit Bus Wash Project, in the amount of $56,134' Dated: December 17,2014 I hereby certify that Resolution No. 2014-231 was passed and adopted by the City Council of the City of Lodi in a regular meeting held December 17,2014, by the following vote: Proposer Taylor Systems Engineering, lnc KPFF Consulting Engineers Original Proposal Fee $106,340 $68,687 NNIFER AYES: NOES: ABSENT: ABSTAIN COUNCIL MEMBERS - Chandler, Kuehne, Mounce, Nakanishi, and Mayor Johnson COUNCIL MEMBERS - None COUNCIL MEMBERS - None COUNCIL MEMBERS - None P^F',,,l* 2014-231 ity Clerk ROBISON CITY COUNCIL PHIL KATZAKIAN, Mayor LARRY D. HANSEN, Mayor Pro Tempore BOB JOHNSON JOANNE L. MOUNCE ALAN NAKANISHI CITY OF' LODI STEPHEN SCHWABAUER City Manager JENNIFER M. ROBISON City Clerk JANICE D. MAGDICH City Attorney F. WALLY SANDELIN Public Works Director PUBLIC WORKS DEPARTMENT CITY HALL, 221 WEST PINE STREET P.O. BOX 3006 LODI, CALIFORNIA 95241 -1910 (20e) 333-6706 FAX (209) 333-6710 EMAIL pwdept@lodi.gov http:\\www.lod i.gov December 10,2014 KPFF Consulting Engineers Attn: Dan Allwardt, Managing Principal 1508 Eureka Road, Suite 290 Roseville, CA 95661 Matthew C. Boyer & Associates Attn: Matthew Boyer, President 3549 Brittany Way El Dorado Hills, CA 95762 SUBJECT Adopt Resolution Authorizing City Manager to Execute Professional Services Agreement with KPFF Consulting Engineers, of Roseville, for Engineering Design Services for the Municipal Utility Services Transit Bus Wash Project ($56,134) Enclosed is a copy of background informat¡on on an item on the City Council agenda of Wednesday, December 17,2014. The meeting will be held at 7 p.m. in the City Council Chamber, Carnegie Forum, 305 West Pine Street. This item is on the consent calendar and is usually not discussed unless a Council Member requests discussion. The public is given an opportunity to address items on the consent calendar at the appropriate time. lf you wish to write to the City Council, please address your letter to City Council, City of Lodi, P. O. Box 3006, Lodi, California, 95241-1910. Be sure to allow time for the mail. Or, you may hand-deliver the letter to City Hall, 221 West Pine Street. lf you wish to address the Council at the Council Meeting, be sure to fill out a speaker's card (available at the Carnegie Forum immediately prior to the start of the meeting) and give it to the City Clerk. lf you have any questions about communicating with the Council, please contact Jennifer Robison, City Clerk, at (209) 333-6702. lf you have any questions about the item itself, please call Lyman Chang at (209) 333- 6706. #F. Wally Sandelin Public Works Director FWS/smh Enclosure cc: City Clerk NCCMTG.DOC