Loading...
HomeMy WebLinkAboutAgenda Report - December 17, 2014 C-12AGENDA ITEM c-lz Crrv or LouI CouNCn COVTMUNICATION TM AGENDA TITLE: MEETING DATE: PREPARED BY: Adopt Resolution Accepting lmprovements at Pixley Park (C-Basin) and Authorizing City Manager to Execute Land Exchange Documents December 17,2014 Public Works Director RECOMMENDED ACTION: Adopt resolution accepting improvements at Pixley Park (C-Basin) and authorizing City Manager to execute land exchange documents. BACKGROUND INFORMATION: The City and the developer, GFLIP lll, L. P., entered into a land i,iS:ffi ÊJä[:iì:ilii'"ilfJ3i?lffi"'"'i'"äÈliff 04-248)per exchange agreement adjusts the property lines to reconfigure the Pixley Park (C-Basin) to allow development of the park site per the approved Pixley Park Conceptual Plan. As part of the land exchange agreement, the developer agreed to construct all the required frontage improvements fronting the proposed park site on Auto Center Drive, excavate the basin to conform to the final grading of the future park layout, and install irrigation and slope stabilization improvements per the executed improvement agreement. The executed agreements and subsequent agreement addenda gave the developer until December 31 , 2014 to complete the obligations of the agreement. The developer's contractor has completed the required public improvements and has excavated the entire basin in conformance with the approved public improvement plans. While not needed at this time, the park irrigation improvements will require a booster pump upon build-out of the park facilities. The developer has agreed to submit a one-time payment of $50,000 prior to executing the land exchange documents in lieu of installing the booster pump at this time. The developer is required to provide warranty work for two years beginning on the date of Council acceptance on the installed improvements and has provided the necessary securities for the warranty work. The developer has also prepared the necessary parcel maps and lot line adjustment for the property exchanged to conform to the final configuration of the Pixley Park site. The final City-owned property will be free of all liens and taxes, as required per the Land Exchange Agreement. FISCAL IMPACT:There will be no direct fiscal impact for the first two years on the maintenance of the basin, which is under the warranty work. There will be a slight increase starting in the third year, as part of the on-going maintenance cost. FUND¡NG AVAILABLE: Not applicable Prepared by Lyman Chang, Senior Civil Engineer FWS/LC/smh Attachments: cc: GFLIP III, L. P. Utility Superintendent - PW Senior Civil Engineer APPROVED: K:\WP\PROJ ECTS\PARKS\Pixley(C-Basin)\CC_Acceptance.doc v n Public Works Director Park Superintendent City Engineer/Deputy Public Works Director F Ste Manager 12t412014 CITY OF LODI PUBLICWORKSDEPARTMENT EXHIBIT A AUTO MALLDRIVE PIXLEY PARKWAYPLUMMERCADILLACSTORM DRAIN PIPE EXISTING LOT LINES CITY OF LODI 27 ± ACRES CITY OF LODI PUBLICWORKSDEPARTMENT EXHIBIT B AUTO MALLDRIVE PIXLEY PARKWAYPLUMMERCADILLACSTORM DRAIN PIPE PROPOSED PROPERTY LINES G-REM 7 ACRES CITY OF LODI G-REM 5.5 ACRES 27 ± ACRES RESOLUTION NO. 201 4-230 A RESOLUTION OF THE LODI CITY COUNCIL ACCEPTING IMPROVEMENTS AT PIXLEY PARK (C-BASIN)AND AUTHORIZING THE CITY MANAGER TO EXECUTE LAND EXCHANGE DOCUMENTS WHEREAS, the City and the developer, GFLIP lll, L. P., entered into a land exchange agreement in December 2004 (Resolution No. 2004 248). The land exchange agreement aãjusts the property lines to reconfigure Pixley Park (C-Basin) to allow development of the park site per the approved Pixley Park Conceptual Plan; and WHEREAS, the developer agreed to construct all the required frontage improvements fronting the proposed park site on Auto Center Drive, excavate the basin to conform to the final grading of the future park layout, and install slope stabilization improvements per the executed improvément agreement. The developer's contractor has completed the required public improvements aid has excavated the entire basin in conformance with the approved public improvement plans; and WHEREAS, the developer is required to provide warranty work for two years beginning on the date of Council acceptance on the installed improvements and has provided the necessary securities for the warranty work; and WHEREAS, the developer has also prepared the necessary parcel maps and lot line adjustment for the properly exchanged to conform to the final configuration of the Pixley Park sitè. The final City-owned property will be free of all liens and taxes, as required per the land exchange agreement. NOW, THEREFORE, BE lT RESOLVED that the Lodi City Council does hereby accept improvements at Pixley Park (C-Basin) and hereby authorizes the City Manager to execute land exchange documents. Dated: December 17,2014 ========== ===== ============ ========= ====== ====== == = ======= ===== ======= == I hereby certify that Resolution No. 2014-230 was passed and adopted by the City Council of the City of Lodi in a regular meeting held December 17 ,2014, by the following vote: AYES: NOES: ABSENT: ABSTAIN COUNCIL MEMBERS - Chandler, Kuehne, Mounce, Nakanishi, and Mayor Johnson COUNCIL MEMBERS - None COUNCIL MEMBERS - None COUNCIL MEMBERS - None IFER 2014-230 Clerk ROBISON CITY COUNCIL PHIL KATZAKIAN, Mayor LARRY D, HANSEN, Mayor Pro Tempore BOB JOHNSON JOANNE L. MOUNCE ALAN NAKANISHI CITY OF' LODI STEPHEN SCHWABAUER City Manager JENNIFER M. ROBISON City Clerk JANICE D. MAGDICH City Attorney F. WALLY SANDELIN Public Works Director PUBLIC V/ORKS DEPARTMENT CITY HALL, 221 WEST PINE STREET P.O. BOX 3006 LODt, CALTFORNTA 95241-1910 (209) 333-6706 FAX (209) 333-6710 EMAIL pwdept@lodi.gov http:\\www.lod i.gov December 10,2014 GFLIP III, L. P. Daryl Geweke 1 139 East Kettleman Lane Lodi, CA 95240 SUBJECT: Adopt Resolution Accepting lmprovements at Pixley Park (C-Basin) and Authorizing City Manager to Execute Land Exchange Documents Enclosed is a copy of background informat¡on on an item on the City Council agenda of Wednesday, December 17,2014. ïhe meeting will be held at 7 p.m.in the City Council Chamber, Carnegie Forum, 305 West Pine Street. This item is on the consent calendar and is usually not d¡scussed unless a Council Member requests discussion. The public is given an opportunity to address items on the consent calendar at the appropriate time. lf you wish to write to the City Council, please address your letter to City Council, City of Lodi, P. O. Box 3006, Lodi, California, 95241-1910. Be sure to allow time for the mail. Or, you may hand-deliver the letter to City Hall, 221 West Pine Street. lf you wish to address the Council at the Council Meeting, be sure to fill out a speaker's card (available at the Carnegie Forum immediately príor to the start of the meeting) and give it to the City Clerk. tf you have any questions about communicating with the Council, please contact Jennifer Robison, City Clerk, at (209) 333-6702. lf you have any questions about the item itself, please call Lyman Change at (209) 333- 6706. 4,rni' F. Wally Sandelin Public Works Director FWS/smh Enclosure cc: City Clerk NCCMTG.DOC