HomeMy WebLinkAboutAgenda Report - September 3, 2014 C-15AGENDA ITEM C.I5 CIry op Lopr Councrl ConnMUNrcATIoN TM AGENDA TITLE: MEETING DATE: PREPARED BY: Receive Update on Emergency Condition at White Slough Water Pollution Control Facility Digesters No. 1 and No. 2 September 3,2014 Public Works Director RECOMMENDED ACTION Receive update on emergency condition at White Slough Water Pollution Control Facility Digesters No. 1 and No. 2. BACKGROUND INFORMATION: White Slough Water Pollution Control Facility (WSWPCF) has four covered anaerobic digesters that serve the purpose of breaking down sewage sludge that enters the plant. On July 16,2014, Council declared an emergency condition in response to concurrent roof failures on Digesters No. 1 and No. 2. Public contract code requires Council to review the emergency action at its next regularly-scheduled meeting and each regularly-scheduled meeting thereafter until the emergency is terminated. Guaranteed Maximum Price (GMP) proposals were solicited from Western Water Constructors, lnc., and Overaa Construction, as discussed at the July 16,2014 City Council meeting. On August 20,2014, staf'l received GMP proposals from both companies with following results: Engineer's Estimate Western Water Constructors, lnc. Overaa Construction GMP $2,666,400 $1,995,710 $2,494,000 Contract Duration 465 Days 366 Days 450 Days Mark Up N/A 5o/o 11% Staff evaluated both proposals. Considering the GMP amount, contract duration and mark up for general overhead and profit, the proposal submitted by Western Water Constructors, lnc., reflects the best overall value to the City. Staff recommended the City Manager execute a contract with Western Water Constructors and expects to issue the Notice to Proceed by September 8, 2014, as scheduled. The original estimate for repairing both digester lids was $3,100,000. Using the GMP proposalfrom Western Water Constructors, lnc., the new estimated total cost to replace both digester lids is $2,366,000. Both estimates included engineering, permits and inspection. By comparison, the estimated cost to construct a single new digester is estimated to be $2,100,000 including engineering, permits and inspections. APPROVED: K:\WP\PROJECTS\SEWER\WSWPCF\DigesterRepaìrs\Council Updates\CUpdate0903'14_2,doc City Manager 8t2512014 Receive Update on Emergency Condition at White Slough Water Pollution Control Facility Digesters No. 1 and No.2 September 3,2014 Page 2 The updated procurement and construction schedule reflecting project milestones is provided below, based on the Western Water Constructors lnc., proposal. ORIGINAL DATES REVISED DATES Project Definition Meeting lssue Final Contract Documents Receive GMP Proposals lssue Notice to Proceed Complete Digester No. 2 lmprovements Complete Digester No. 1 lmprovements July 21,2014 August 1,2014 August 20,2014 September 8,2014 np+il-eæ+5 Ðeeember4+O¡g March 19,2015 August 13,2015 FISCAL IMPAGT Proceeding with repairs is necessary to avoid substantial regulatory compliance fines and penalties. FUNDING AVAILABLE: Funding is available in the Wastewater Capital Fund (171493) C}SçJ*'. .&{ F. Wally Sandelin Public Works Director Prepared by Charlie Swimley, City Engineer / Deputy Public Works Director FWS/CES/pmf cc: Associate Civil Engineer Nathan Charlie Swimley, City Engineer / Deputy Public Works Director Wastewater Plant Superintendent K:\WP\PROJECTS\SEWER\WSWPCF\D¡gesterRepairs\Council Updates\CUpdate090314-2.doc 8t25t2014