Loading...
HomeMy WebLinkAboutAgenda Report - September 3, 2014 C-07AGENDA ITEM c-1 Crrv or Lou CouNcrr CovrMUNrcATIoN TM AGENDA TITLE: MEET¡NG DATE: PREPARED BY: Adopt Resolution Approving Sole Source Purchase of Return Activated Sludge Pump for White Slough Water Pollution Control Facility from Pump Repair Service Company, of San Francisco ($29,000) September 3,2014 Public Works Director RECOMMENDED ACTION: Adopt resolution approving sole source purchase of return activated sludge pump for White Slough Water Pollution Control Facility from Pump Repair Service Company, of San Francisco, in the amount of $29,000. BAGKGROUND INFORMATION: The function of the return activated sludge (RAS) pump is to pump sludge from the secondary clarifiers and return it to the aeration basins. The existing No. 2 RAS pump was installed in 1991. Through the years, the pump has been repaired and parts have been replaced. As part of routine preventive maintenance practices, the No. 2 RAS pump is due to be replaced. The White Slough Water Pollution Control Facility WSWPCF) has three RAS pumps, two for operation and the third for backup/redundancy. The No. 1 RAS pump was replaced in 2010 and No. 3 RAS pump is scheduled to be replaced in 2015. Pump Repair Service Company is the sole source equipment distributor. Once the new RAS pump is installed by staff, the pump will be able to pump efficiently from the secondary clarifiers into the aeration basins to maintain effective operation and continued compliance with discharge permit requirements. Per Lodi Municipal Code Section 3.20.070, Bidding, the bidding process may be dispensed when the City Council determines that the purchase or method of purchase is in the best interests of the City. Staff recommends purchase of the return activated sludge pump from Pump Repair Service Company. FISCAL IMPACT: lf the RAS pump is not replaced, the older, existing pump could fail, requiring ilf, åil',''iåi,:il1?!åË,åii':ï,î,?J*y3üf5ii^i"3;å:$'ili" FUNDING AVAILABLE: Plant Maintenance Capital lmprovements (171493) Jordan yers Deputy City Manager/lnternal Services Director F tn Public Director Prepared by Karen Honer, Wastewater Superintendent FWS/KDH/pmf APPROVED K:\WP\COUNCIL\201 4\RAS Pump.doc n v , City Manager 811312014 RESOLUTION NO. 2014-164 A RESOLUTION OF THE LODI CITY COUNCIL APPROVING THE SOLE SOURCE PURCHASE OF A RETURN ACTIVATED SLUDGE PUMP FOR THE WHITE SLOUGH WATER POLLUTION CONTROL FACILITY FROM PUMP REPAIR SERVICE COMPANY, OF SAN FRANCISCO _--_---_--_ --:---ÊF WHEREAS, the No. 2 return activated sludge (RAS) pump was installed in 1991 and is due to be replaced as part of routine preventive maintenance practices; and WHEREAS, the White Slough Water Pollution Control Facility has three RAS pumps, two for operation and the third for backup/redundancy. The No. 1 RAS pump was replaced in 2010 and No. 3 RAS pump is scheduled to be replaced in 2Q15; and WHEREAS, Pump Repair Service Company is the sole source equipment distributor; and WHEREAS, per Lodi Municipal Code Section 3.20.070, Bidding, the bidding process may be dispensed when the City Council determines that the purchase or method of purchase is in the best interests of the City. NOW, THEREFORE, BE tT RESOLVED that the Lodi city council does hereby approve the sole source purchase of a return activated studge pump for the White Slough Water pollution Control Facility from Pump Repair Service Company, of San Francisco, California, in the amount of $29,000. Dated: September3,2014 I hereby certify that Resolution No. 2014-164 was passed and adopted by the City Council of the City of Lodi in a regular meeting held September 3, 2014, by the following vote: AyES: COUNCIL MEMBERS - Johnson, Nakanishi, and Mayor Katzakian NOES: COUNCIL MEMBERS - None ABSENT: COUNCIL MEMBERS - Hansen and Mounce ABSTAIN: COUNCIL MEMBERS - None IFER . ROBISON 2014-164 Clerk