Loading...
HomeMy WebLinkAboutAgenda Report - September 3, 2014 C-06AGENDA ITEM C-b Crrv or Lonr Couxcrr CovTMUNICATIoN TM AGENDA TITLE: MEETING DATE: PREPARED BY: Adopt Resolution Approving Sole Source Purchase of Skimmer Chain and Flight Collector Equipment for White Slough Water Pollution Control Facility from Tenco Hydro, lnc., of Brookfield, lL ($70,000) September 3,2014 Public Works Director RECOMMENDED AGTION: Adopt resolution approving sole source purchase of skimmer chain and flight collector equipment for White Slough Water Pollution Control Facility from Tenco Hydro, lnc., of Brookfield, lL, in the amount of $70,000. BACKGROUND INFORMATION: The function of the skimmer chain and flight collector equipment is to ä's:l[?fl ¿':,ii,ii:JiilJT,ff ::f iffi if lSliå]îii:ffi ïJDAFT) skimmer chain and flight equipment installed in 1990. Through the years, small parts have been replaced; however; the major parts such as sprockets, flights, drive chains, and shafts now need to be replaced. There are two DAFT tanks at the White Slough Water Pollution Control Facility (WSWPCF). ln 2013, a set of skimmer chain and flight collector equipment was purchased and installed for the No. 1 DAFT. Both DAFTs are needed to maintain the manufacturer's performance criteria and continuous compliance with discharge permit requirements. Tenco Hydro, lnc., is the sole source equipment distributor that designed and built the original skimmer chain and flight collector equipment for both DAFTs. The equipment requires no special construction. Once the new equipment is installed by staff, the No. 2 DAFT will provide the operational performance necessary to maintain continuous compliance with discharge permit requirements. Per Lodi Municipal Code Section 3.20.070, Bidding, the bidding process may be dispensed when the City Council determines that the purchase or method of purchase is in the best interests of the City. Staff recommends purchase of the skimmer chain and flight collector equipment from Tenco Hydro, lnc. FTSCAL IMPAGT: lf the No. 2 DAFT is not rehabilitated with the new skimmer chain and flight collector, existing equipment could fail, requiring an emergency purchase. Additionally, WSWPCF could have problems maintaining discharge permit requirements without the rehabilitation. FUNDING AVAILABLE: Plant Maintena Capital lmprovements (1 71 493) Jordan Ayers Deputy City Manager/l nternal ces Director F. Wally tn Public Works Director Prepared by Karen Honer, Wastewater Superintendent FWS/KDH/pmf APPROVED K:\WP\COUNC lL\201 4\ChainFlightEqu¡p2.doc bau Manager 8t13t2014 RESOLUTION NO. 201 4-163 A RESOLUTION OF THE LODI CITY COUNCIL APPROVING SOLE SOURCE PURCHASE OF SKIMMER CHAIN AND FLIGHT COLLECTOR EQUIPMENT FOR DISSOLVED AIR FLOTATION THICKENER NO. 2 AT THE WHITE SLOUGH WATER POLLUTION CONTROL FACILITY FROM TENCO HYDRO, INC., OF BROOKFIELD, ILLINOIS WHEREAS, the existing skimmer chain and flight collector equipment were instalfed in 2Oe4 on Dissolved Air Flotatioñ Thickener (DAFT) No. 2 to replace the original skimmer chain and flight equipment installed in 1990, and the major parts now need to be replaced; and WHEREAS, there are two DAFT tanks at the White Slough Water Pollution Control Facility and both are needed to maintain the manufacturer's performance criteria and continuous compliance with discharge permit requirements; and WHEREAS, Tenco Hydro, lnc., is the sole source equipment distributor that designed and built the original skimmer chain and flight collector equipment for both DAFTs; and WHEREAS, per Lodi Municipal Code Section 3.20.070, Bidding, the bidding process may be dispensed when the City Council determines that the purchase or method of purchase is in the best interests of the City. NOW, THEREFORE, BE tT RESOLVED that the Lodi city council does hereby approve the sole source purchase of skimmer chain and flight collector equipment for Dissolved Air Flotation Thickener No. 2 at the White Slough Water Pollution Control Facility from Tenco Hydro, lnc., of Brookfield, lllinois, in the amount of $70,000. Dated: September3,2014 I hereby certify that Resolution No. 2014-163 was passed and adopted by the City Council of the City of Lodi in a regular meeting held September 3, 2014, by the following vote: AyES: COUNCIL MEMBERS - Johnson, Nakanishi, and Mayor Katzakian NOES: COUNCIL MEMBERS - None ABSENT: COUNCIL MEMBERS - Hansen and Mounce ABSTAIN: COUNCIL MEMBERS - None Pr0rw"' IFER 2014-163 Clerk ROBISON