Loading...
HomeMy WebLinkAboutAgenda Report - June 18, 2014 C-05AGENDA rrEM C-5 CTry oF LoDI Councrl CoMMUNIcATIoN TM AGENDA TITLE: MEETING DATE: PREPARED BY: Approve Specifications and Authorize Advertisement for Bids for Procurement of Biosolids Dewatering Polymer at White Slough Water Pollution Control Facility June 18,2014 Public Works Director RECOMMENDED ACTION Approve specifications and authorize advertisement for bids for procurement of biosolids dewatering polymer at White Slough Water Pollution Control Facility. BACKGROUN D IN FORMATION This project will procure polymer used in the biosolids dewatering process at the White Slough Water Pollution Control Facility. Adding polymer to wastewater creates a reaction that assists in separating solids from water. The current supply of polymer is low and needs replenishing. lt is necessary to use a performance-based bid, including full-scale product testing with the dewatering equipment, to verify the actual polymer dosage and cost for each product. Each vendor manufactures polymer using a proprietary chemical formula, and the polymer provided by our most-recent supplier has not been as effective as desired. Because the performance-based bidding process for polymer is lengthy and complex, staff recommends that the contract term should be for a minimum of three years, to provide stable operating costs. The estimated annual cost is $140,000 per year. The planned bid opening is July 7,2014. FISCAL IMPACT:The cost of polymer is included in the FY 2014115 Wastewater budget. FUNDING AVAILABLE: Funding for this project will be identified at contract award KJ¿ç-R çg¡. F.Wally Sandelin- Public Works Director Prepared by Karen Honer, Wastewater Plant Superintendent FWS/KH/pmf APPROVED: K:\WP\COUNCIL\201 4\Dewatering Polymer Specs.doc Stephen Manager 06t10t2014