Approve Plans and Specifications and Authorize Advertisement for Bids for
Turner Road Overlay, Loma Drive to Pleasant Avenue
June 18,2014
Public Works Director
RECOMMENDED ACTION Approve plans and specifications and authorize advertisement for
bids for Turner Road Overlay, Loma Drive to Pleasant Avenue.
BACKGROUND INFORMATION: This project consists of installing asphalt concrete overlay on
Turner Road from Loma Drive to Pleasant Avenue (approximately
1.4 miles). The work also includes performing pavement repairs,
installing storm drain catch basins and storm drain laterals, and installing wheelchair ramps at various
locations within the project limit.
The plans and specifications are on file in the Public Works office. The planned bid opening date is
July 16, 2014. The estimated project cost is $874,000,
FISCAL IMPACT There will be a decrease in pavement maintenance costs on this section of
Turner Road following the overlay.
FUNDING AVAILABLE: Funding will be identified at project award
e!,sx:¿
æ
Public Works Director
Prepared by Dorothy Kam, Assistant Engineer
FWS/Dl(pmf
cc: City Engineer/DeputyPublicWorks Director
APPROVED:
K:\WP\PROJECTS\STREETS\Turner Rd Overlay\CPSA.doc 6t10t2014