Loading...
HomeMy WebLinkAboutAgenda Report - June 18, 2014 C-03AGENDA ITEM c-3 CIrv op LopI CouwcIr, CoIUMUNIcATIoN IM AGENDA TITLE: MEETING DATE: PREPARED BY: Approve Plans and Specifications and Authorize Advertisement for Bids for Turner Road Overlay, Loma Drive to Pleasant Avenue June 18,2014 Public Works Director RECOMMENDED ACTION Approve plans and specifications and authorize advertisement for bids for Turner Road Overlay, Loma Drive to Pleasant Avenue. BACKGROUND INFORMATION: This project consists of installing asphalt concrete overlay on Turner Road from Loma Drive to Pleasant Avenue (approximately 1.4 miles). The work also includes performing pavement repairs, installing storm drain catch basins and storm drain laterals, and installing wheelchair ramps at various locations within the project limit. The plans and specifications are on file in the Public Works office. The planned bid opening date is July 16, 2014. The estimated project cost is $874,000, FISCAL IMPACT There will be a decrease in pavement maintenance costs on this section of Turner Road following the overlay. FUNDING AVAILABLE: Funding will be identified at project award e!,sx:¿ æ Public Works Director Prepared by Dorothy Kam, Assistant Engineer FWS/Dl(pmf cc: City Engineer/DeputyPublicWorks Director APPROVED: K:\WP\PROJECTS\STREETS\Turner Rd Overlay\CPSA.doc 6t10t2014