Loading...
HomeMy WebLinkAboutAgenda Report - August 18, 1999 E-03Ach CITY OF LODI COUNCIL COMMUNICATION AGENDA TITLE: Plans, Specifications, and Advertisement of Bids for Peterson Park Maintenance Satellite and Restroom Building MEETING DATE: August 18, 1999 PREPARED BY: Parks and Recreation Director RECOMMENDED ACTION: That the City Council approve the above project and authorize advertising of bids. BACKGROUND INFORMATION: The development plans for Peterson Park included the construction of permanent restroom facilities. Staff has studied, reviewed and consulted with various restroom manufacturers over the last six months in order to come up with the best facility to meet our needs including durability, low maintenance and costs as well as for future growth. Staff has designed a restroom facility along with an adjoining maintenance facility that can be built as a modular unit and transported to the site or built the conventional way on site. The restroom facility is designed with the maintenance area component that will allow Peterson Park to act as a satellite operation to serve Glaves Park and the new Katzakian Park. Using the maintenance storage area to store scooters, tools, small equipment, and supplies helps cut down on driving and hauling equipment and supplies from our headquarters on Stockton Street, which is presently being done by maintenance staff. Staff would like to move forward with the bidding process requesting bids on two different sized buildings. The smaller unit is approximately 559 square feet and includes a maintenance area and two toilets/urinals in each restroom. The larger unit is approximately 624 square feet, includes three toilets/urinals in each restroom, and would accommodate future growth of the area and higher use of the park. The Parks and Recreation Commission reviewed the project at their June 1, 1999 meeting. The Commission supported the idea of a restroom facility, however there was much discussion and concern on the cost of the facility. Their final action, on a 3-0 vote, was to recommend to Council the building of a restroom facility with size and cost considerations to be determined by Council. Upon receipt of bids, staff will return to Council to address low -bidder costs and appropriate size to construct. A representative of modular restroom builders will be present to answer any questions as to costs, construction, or related matters. APPROVED: H. Dixon Flynn -- City 08/11/99 Plans, Specifications, and Advertisement of Bids for Peterson Park Restroom August 18, 1999 Page 2 TIMELINE: Advertisment of bids: August 28, 1999 Bid opening: September 22, 1999 Contract award: October 6, 1999 Construction: November -December, 1999 Engineers Estimate: $115,000 (small unit) $150,000 (large unit) FUNDING: Park Impact Mitigation Fee Fund Funding available: Vicky McAthie, Finance Director La=we� Ron Williamson Parks and Recreation Director Prepared by Dwight Dauber, Parks Superintendent RW/DD/sb Attachments cc: Purchasing Officer Lodi Parks and Recreation Commission CITY OF LODI PETERSON PARK PARKS DEPARTMENT RESTROOM PROJECT LEGEND: o Q - EXISTING SEWER CLEAN-OUT - EXISTING WATER VALVE EXISTING yITI GFE TRIP p LINE - EXNG ELECTRICAL BOXES G� O —E— - EXISTING ELECTRICAL SERVICE `�'v G O -- W - EXISTING 1' WATER SERVICE sP " ( PARK —ss- - ExIsnNG 4" smarmy GHT EXISTING TREES - O P 6 > 2 O i o O 3 3 ,pp 6 • O 4 P • O O ' ` ! I o o C:= a O Q O l NEW RESTROOM LOCATION LAYOUT RESTROOM BUILDING SCALE: 1 "=30' 21'-6" x 29'-0" "L" PRIVACY SCREENS 4'-6" x 4'-6" PROJECT CONSTRUCTION NOTES: THE CITY OF LODI-PARKS DIVISION SHALL PROVIDE AND INSTALL NEW CHAIN LINK FENCE AND GATE AFTER THE CONTRACTOR HAS INSTALLED THE NEW RESTROOM BUILDING. 2. THE CONTRACTOR SHALL PROVIDE AND INSTALL (1) RESTROOM FACILITY PER PLANS AND SPECIFICATIONS. 3. THE CONTRACTOR SHALL PROVIDE AND INSTALL APPROXIMATELY 485 SQUARE FEET OF NEW CONCRETE FLAT WORK. 4. THE CITY OF LODI-PARKS DIVISION SHALL REINSTALL SPRINKLERS AND TURF AFTER CONSTRUCTION IS COMPLETED. 5. THE CONTRACTOR SHALL BE RESPONSIBLE FOR REPAIRING TURF RUTS OUTSIDE OF THE WORK LIMITS AT NO COST TO THE CITY OF LODI. 6. THE CONTRACTOR SHALL PROVIDE AND INSTALL (2).2" PVC CONDUITS LABELED AS "SPARE". ONE CONDUIT SHALL BE STUBBED -OUT TO THE NORTHEAST AND THE OTHER SHALL BE STUBBED -OUT TO THE SOUTHWEST. (CONDUITS SHALL BE TERMINATED INSIDE OF CHASE AREA - TO ELECTRICAL PANEL.) CITY OF LODI PETERSON PARK PARKS DEPARTMENT RESTROOM PROJECT 2' PVC TYPE DB CONDUIT (EMPTY) 10 MEN MEN STORAGE AREA 110 00 AMP METERED CHASI36 INrERIOR RESTROOM qr VLl MOP eft to WOMEN al =Al'FA STORM AWA SVALL Kam FUXWAS" Lam hit 04 2t Ac Ac 2' PVC TYPE DB NII -EXTERIOR LIGKrS 4 OF 4) CONDUIT cejpm CrfP. PRIV&—f SCREEN FLOOR PLAN RESTROOM DESIGN CRITERIA: CODE REFERENCE: 1997 UNIFORM BUILDING CODE; 1997 UNIFORM PLUMBING CODE; 1996 NATIONAL ELECTRIC CODE, 1997 UNIFORM; MECHANICAL CODE AND 1996 CALIFORNIA TITLE 24 REQUIREMENTS ROOF LIVE LOAD: MINIMUM - 40 PSF BASIC WIND SPEED: 85 MPH ELECTRICAL: 100 AMP, SINGLE PHASE, 3 WIRE, 120/240 VOLT SEISMIC ZONE: 3 ' • CITY OF LO D I PETERSON PARK PARKS DEPARTMENT RESTROOM PROJECT 2' PVC TYPE D8 PRIVACY SCREEN I CONCRETE SIDEWALK I 27 3/0 Q r ROIL -UP DOOR C n — 11"-9 1/2- 0 STT]RAM AREA sm Os i m i N 4}GHTS 41--f FLOOR PLAN SCALE: 1/8"=l' -O" RESTROOM DESIGN CRITERIA: CODE REFERENCE: 1997 UNIFORM BUILDING CODE; 1997 UNIFORM PLUMBING CODE; 1996 NATIONAL ELECTRIC CODE; 1997 UNIFORM: MECHANICAL CODE AND 1996 CALIFORNIA TITLE 24 REQUIREMENTS ROOF LIVE LOAD: MINIMUM - 40 PSF BASIC WIND SPEED: 85 MPH ELECTRICAL: 100 AMP, SINGLE PHASE, 3 WIRE, 120/240 VOLT SEISMIC ZONE: 3 m 1 HIEN ioDIEM I 100 MAP CHASE FTE[ AREA o I r +�+ELE PANEL + z z 0 U t 1 cm I I m 1 WOMEN N CONCRETE SIDEWALK 2 PVC TYPE DB CONDUIT (EMPTY) PRIVACY SCREEN 11"-9 1/2- 0 STT]RAM AREA sm Os i m i N 4}GHTS 41--f FLOOR PLAN SCALE: 1/8"=l' -O" RESTROOM DESIGN CRITERIA: CODE REFERENCE: 1997 UNIFORM BUILDING CODE; 1997 UNIFORM PLUMBING CODE; 1996 NATIONAL ELECTRIC CODE; 1997 UNIFORM: MECHANICAL CODE AND 1996 CALIFORNIA TITLE 24 REQUIREMENTS ROOF LIVE LOAD: MINIMUM - 40 PSF BASIC WIND SPEED: 85 MPH ELECTRICAL: 100 AMP, SINGLE PHASE, 3 WIRE, 120/240 VOLT SEISMIC ZONE: 3 m CITY OF LO D I PETERSON PARK PARKS DEPARTMENT RESTROOM PROJECT 26 GAUGE STANDING SEAM METAL ROOF (HUNTER GREEN) 2 x 8 ROUGH SAWN SPRUCE BARGE RAFTER x 8 ROUGH SAWN SPRUCE 7 FT. SECTIONAL ROLL-UPJI `�ERwR UGHT `FIBER CEMENT REINFORCED DOOR. L 3 FT HIGH SPUT-FACE VERTICAL SONG 3/0-6/8 METAL DOOR VENEER BLOCK WAINSCOTING SOUTHWEST ELEVATION '- CLEFT SIDE SCALE: 1/8"=l' -O" 26 GAUGE STANDING SEAM METAL ROOF (HUNTER GREEN) EXTERIOR UGHT 2 x 8 ROUGH SAWN 9 GAUGE x 3 4 - SPRUCE BARGE RAFTE� / CABLEEXPANDEDN METAL e CABLE END VENTS 2 x 8 ROUGH SAWN 4'-6" x 4'-6- PRIVACY (2) RESTROOM DOORS - 1 1/2- SQUARE FRAME WITH DIAGONAL BRACES AND #9 GA EXPANDED METAL. SOUTHEAST ELEVATION = (FI30NT) SCALE: 1/8"=l' -O" PETERSON PARK PARK am 3 PETERSON PARK MAINTENANCE SATELLITE FACILITY / RESTROOM