Loading...
HomeMy WebLinkAboutResolutions - No. 2017-27RESOLUTION NO. 2017-27 A RESOLUTION OF THE LODI CITY COUNCIL AUTHORIZING THE CITY MANAGER TO EXECUTE A PROFESSIONAL SERVICES AGREEMENT FOR ERGONOMIC AND FIRE SUPPRESSION UPGRADES FOR LODI ELECTRIC UTILTY OPERATIONS CENTER AND SCADA CONTROL ROOM WITH WMB CONTRACTORS, OF OAKLAND WHEREAS, on May 7, 2015, an ergonomic study of the Lodi Electric Utility (LEU) Operations Center was completed by PRNICARR Ergonomic Services Division, which Identified a number of issues needing to be addressed in order to mitigate workers' compensation claims; and WHEREAS, the LEU Operations Center is staffed 10 hours per day, seven days a week, and operators are often called to work additional hours on an as -needed basis when trouble occurs on the LEU distribution system; and WHEREAS, due to the nature of their work, the operators are quite often confined to their workstations for lengthy periods of time; and WHEREAS, the stature of the operators can vary significantly, and as a result of these conditions, the study recommended a number of ergonomic enhancements, such as adjustable workstations, ergonomic placement of keyboards and monitors., improved lighting, and better accessibility to the LEU system status board; an additional workstation is also required to accommodate all operator positions;. and WHEREAS, adjacent to the Operations Center is the Supervisory Control and Data Acquisition (SCADA) Control Room for the master server, which currently has a sprinkler fire suppression system; if it were to deploy, there would be catastrophic damage to the master SCADA servers that would prevent remote operation of the electric distribution system until relocation to the emergency operations center could be accomplished. In order to preventthis, a dry agent fire suppression system, such as Halon, should be installed; the water system removed; and the ventilation system upgraded in order to ensure the dry agent, which can be tonic, does not enter the Operations Center in the event it is deployed; and WHEREAS, security upgrades are needed to meet current electric utility best practices; although the Operations Center is secured by access keypads on the doors, the doors themselves are over 35 years old and could easily be compromised; and a window to the front office area needs to be secured in order to prevent forced entry; and WHEREAS, a request for proposal to address the ergonomic and security issues for the Operations Center and SCADA Control Room was issued on June 23, 2016, and a mandatory job walk for all contractors planning to submit proposals was conducted on July 11, 2016; and WHEREAS, proposals were received on August 1, 2016, with only one qualifying proposal submitted from WMB General Contractors, of Oakland; and WHEREAS, the fiscal impact will not exceed $300,000, with funding available in FY 2016/17 Budget Account No. 50199000.77020. NOW, THEREFORE, BE IT RESOLVED that the Lodi City Council does hereby authorize the City Manager to execute a Professional Services Agreement for ergonomic and fire :suppression upgrades for the Lodi Electric Utility operations Center and SCADA Cantroi Room with WMB Contractors, of Oakland, California, in an amount not to exceed $3170,000. Dated: March 1, 2017 I hereby certify that Resolution No: 2017-27 was passed and adopted by the City Council of the City of Lodi in a. regular meeting held March 1, 2017, by the following vote: AYES: COUNCIL MEMBERS — Chandler, Mounce, Nakanishi, and Mayor Kuehne NOES: COUNCIL MEMBERS — None ABSENT: COUNCIL MEMBERS — Johnson ABSTAIN: COUNCIL MEMBERS — None NIFER : FERRAIOLO fl .. Clerk 2017-27