HomeMy WebLinkAboutResolutions - No. 2017-06When Recorded Please Return to: Doc - ft: 2017--016920
Lodi city clerk
02/08/2017 o . Fe@7 so AM
P.O. Box 3006 Steve J. B.es.tal.ar.ldes
Lodi, CA 95241-1910 Sart Joaquin CoUntY Recorders
Raid B:: SHOtJN ON DOWMIE.NT
ILII
Kill�l�f'ti1 ��i�L"}�����ll iii
RESOLUTION NO. 2017-06
A RESOLUTION OF THE LODI CITY COUNCIL ACCEPTING
REYNOLDS RANCH SUBDIVISION UNIT NO. 1, TRACT NO. 3805,
PUBLIC IMPROVEMENTS, AND AMENDING TRAFFIC RESOLUTION
NO. 97-148 BY APPROVING MULTI -WAY STOP CONTROL AT THE
LEBARON BOULEVARD AND OLYMPIC AVENUE INTERSECTION
WHEREAS, Reynolds Ranch Subdivision Unit No. 1 is the first of three low-density,
residential units Ionated west of Reynolds Ranch Parkway, east of the Union Pacific Railroad,
and south of the recently -completed Reynolds Ranch Phase 3A commercial improvements and
consists of 86 single-family residential lots; and
WHEREAS, public improvements include installation of all interior subdivision public
improvements and full street improvements on LeBaron Boulevard from Reynolds Ranch
Parkway to its intersection with the south end of Stockton Street and from Stockton Street to the
north boundary of the subdivision. The improvements along LeBaron Boulevard and
Stockton Street within Unit. No. 1 consist of masonry wall, curb, gutter and sidewalk, landscape
and irrigation, street lights, signal improvements, and full -width paving; and
WHEREAS, the streets to be accepted are as follows:
Streets Length in Miles
LeBaron Boulevard 0.36
Stockton Street 0.06
Interior Streets 0.58
Total New Miles of City Streets 1.00
WHEREAS, the developer, Orchard Lane-- Lodi, LLC (Orchard Lane), was required to
construct a portion of off-site storm drain pipeline between the south boundary of Unit No. I and
the existing storm drain basin, and replace the temporary private wastewater rift station with the
public wastewater lift station improvements. The mechanical and electrical elements of the
public wastewater lift station are complete and operational, and
WHEREAS, Orchard Lane has requested to defer remaining pump station site work;
since the remaining portion of site work will not impact lift station operations, staff concurs with
the request and recommends the partial acceptance of the public, wastewater lift station; and
WHEREAS, work on the storm drain basin is substantially complete, however, recent
storms have caused erosion to occur on some of the basin slopes. Orchard Lane's contractor
cannot perform repairs until the rainy season is over when the soil is dry and stable: For this
reason, Orchard Lane requests to defer acceptance of the storm basin until the second phase of
the residential development; and
WHEREAS, LeBaron Boulevard at Olympic Avenue is a four-way intersection just west
of the Stockton Street and LeBaron Boulevard intersection. Since this intersection controls the
main entrance and exit points of the subdivision, a multi -way stop at this location was required
as a condition of approval; and
WHEREAS, staff recommends accepting Reynolds Ranch Subdivision Unit No. 1,
Tract No. 3805, public improvements; and
WHEREAS, staff recommends that the City Council amend Traffic Resolution
No. 97-148, to approve a multi -way stop control at LeBaron Boulevard and Olympic Avenue.
NOW, THEREFORE, BE IT RESOLVED that the Lodi City Council does hereby accept
Reynolds Ranch Subdivision Unit No. 1, Tract No. 3805, public improvements; and
BE IT FURTHER RESOLVED that the Lodi City Council does hereby amend Traffic
Resolution No. 97-148 by approving a multi -way stop control at LeBaron Boulevard and
Olympic Avenue.
Dated: February 1, 2017
I hereby certify that Resolution No. 2017-06 was passed and adopted by the City
Council of the City of Lodi in a regular meeting held February 1, 2017, by the following vote:
AYES: COUNCIL MEMBERS — Chandler, Johnson, Mounce, and Mayor Kuehne
NOES: COUNCIL MEMBERS — None
ABSENT: COUNCIL MEMBERS — Nakanishi
ABSTAIN: COUNCIL MEMBERS — None
l' �6.)o
NIFE FERRI InI~O
ifY Clerk
2017-06