Loading...
HomeMy WebLinkAboutResolutions - No. 2016-48RESOLUTION NO. 2016-48 A RESOLUTION OF THE LODI CITY COUNCIL AWARDING THE BID FOR THE PURCHASE OF ONE 60/12kV POWER TRANSFORMER FROM VIRGINIA TRANSFORMER CORPORATION, OF ROANOKE, VIRGINIA WHEREAS, in answer to notice duly published in accordance with law and the order of this City Council, sealed bids were received and publicly opened on January 7, 2016, at 11:00 a.m., for the purchase of one 60/12kV power transformer with load tap changer for Lodi Electric Utility, described in the specifications therefore approved by the City Council on October 21, 2015; and WHEREAS, said bids have been compared as to life -cycle costs, checked, and tabulated and a report thereof filed with the City Manager, as shown on Exhibit A attached; and WHEREAS, the bids meeting the City's specification with the lowest estimated life -cycle costs are shown below: Manufacturer Location Purchase Cost and Delivery LifeCycle Cost Total Cost WEG Electric Corp. Duluth, GA $511,812 $144,229 $656,041 ABB Power South Boston, VA $762,134 $150,775 $912,909 Virginia Transformer Corp. Roanoke, VA $476,814 $150,269 $627,083 SPX Transformer Solutions Waukesha, WI $868,281 $169,747 $1,038,028 Howard Industries Laurel, MS $943,546 $139,360 $1,082,906 Niagra Transformer Corp. Buffalo, NY $930,617 $167,503 $1,098,120 Delta Star, Inc. Lynchburg, VA $706,763 $165,432 $872,195 PanAmerica Supply, Inc. Katy, TX $581,240 $156,556 $737,796 NOW, THEREFORE, BE IT RESOLVED that the Lodi City Council does hereby award the bid for the purchase of one 60/12kV power transformer with load tap changer to Virginia Transformer Corporation, of Roanoke, Virginia, in an amount not to exceed $476,814. Dated: April 20, 2016 I hereby certify that Resolution No. 2016-48 was passed and adopted by the City Council of the City of Lodi in a regular meeting held April 20, 2016, by the following vote: AYES: COUNCIL MEMBERS — Johnson, Mounce, Nakanishi, and Mayor Chandler NOES: COUNCIL MEMBERS — None ABSENT: COUNCIL MEMBERS — Kuehne ABSTAIN: COUNCIL MEMBERS — None �Y NIFER . FERRAIOLO ity Clerk 2016-48 City of Lodi Killelea 60/12kV Substation Transformer Life -Cycle Cost Evaluation Loss data Exhibit A No -Load Loss kW (@100%V) 16 14.14 13.8 13.1 15.1 11.9 17.1 16 Load Loss kW (N position) 48.5 1 60.15 1 1 57.5 1 64.9 48.65 1 1 83 1 61.8 47 Aux. Loss kW (OA/FA) 1.125 1.4 2.3 5.1 1 1.32 1 4 No -Load Loss Penalty $78,895 $69,723 $68,047 $64,595 1 $74,457 1 $58,678 $84,319 $78,895 Load Loss Penalty $59,787 1 $74,149 $70,882 $80,004 $59,972-1 $102,316 1 $76,183 1 $57,938 Aux. Loss Penalty $5,547 $6,903 $11,341 $25,148 1 $4,931 1 $6,509 1 $4,931 1 $19,724 Total Penalty Adder 1 $144,229 1 $150,775 $150,269 1 $169,747 $139,360 1 $167,503 1 $165,432 1 $156,556 Bid Amount 1 $511,812 1 $762,134 $476,814 1 $868,281 $943,546 1 $930,617 1 $706,763 1 $581,240 No Load Loss Penalty = NLL x E x H x PW Load Loss Penalty = LL x E x H x PW x Y^2 Aux. Loss Penalty = AL x E x H x PW NLL = No -Load Loss given in kW LL = Load Loss given in kW AL = Aux. Loss given in kW $0.05 E is the energy cost of the utility in $/kWh 8,760 H is the annual hours of service 11.26 PW is the present worth factor (1-1/(1+T)^N)/T 0.08 Bond or loan interest rate (T) 30 Number of years of expected service (N) 0.5 Y is the average expected transformer loading