HomeMy WebLinkAboutAgenda Report - September 15, 1999 E-19CITY OF LODI COUNCIL COMMiJNICATION
AGENDA TITLE: Resolution Authorizing City Manager to Sign Construction Agreement with Job
Corps/Operating Engineers for Construction of Lodi Lake BeachM/est Side Trail Project
MEETING DATE: September 15, 1999
PREPARED BY: Parks and Recreation Director
RECOMMENDED ACTION: That City Council approve the resolution authorizing City Manager to sign
construction agreement with Job Corps/Operating Engineers for construction of
Lodi Lake BeachMfest Side Trail ProjecL
BACKGROUND INFORMATION: The Lodi Lake Beach/Trail project is a two-phase project. Phase I includes
the beach, Turner Road from the beach house to Mills Avenue intersection.
The Job Corps/Operating Engineer have agreed to do this public service
project for the City of Lodi by performing the following work: Supply labor
and equipment to remove the wall and sidewalk along Turner Road, remove tree root balls, grade for new trail
including relocating berm and grading of beach. Value of this service is estimated to be $50,000. As part of this
agreement, the City is to provide fuel for equipment, dust control, traffic control, constriction staking, transportation
of equipment, and design. Project to start in early October.
FUNDING: Engineers Estimate: $442,000
Funding for this project will come from funding sources identified below.
State of California Special Appropriation Grant $200,000 Note: Agenda items #E-17 and #E-19
Federal Transit Administration Grant $ 75,000 VoVdeal with the same project, and,
Federal Transit Enhancement Activities (TEA -21): $163,000 therefore, show the same total budget
Measure K Funds: $125,000 amount of $442,000
Parks and Recreation Capital Improvement Funds: $ 50,000
Funding Available: tJ tA\ r ().,I
Vicky McAthie, Finance Director
Ron Williamson
Parks and Recreation Director
Prepared by Dwight Dauber, Parks Superintendent
cc: City Attorney
Purchasing Officer
Public Works Director
APPROVED:
H. Dixon Flynn --
09/07!99
INTERNATIONAL UNION OF OPERATING ENGINEERS
JOB CORPS EQUIPMENT TRAINING PROGRAM
PROJECT AGREEMENT
This agreernerd Is entered Into on this the day of .1999,
between Sacramento Job Corps and The City of Lodi. For the purpose of accomplishing
the following project; pedestrian and bicycle trails at Lodi Lake Park and expansion of
beach area. Scope of work Includes; removing existing dirt berm and rebuilding per
plans, compaction of new earth work, installation of sand per pians, remove existing
concrete rip-mp wall along Tumor Road, remove existing concrete sidewalks along
Tuner Road and beach area, tree removal - rootbolls only. For and in consideration of
the following terra and conditions the parties agree as follows:
1. This project will be built as a result of the training given to the students.
2. Approximate duration, 5 months, with a maximum work day of 8 hours, 4 days a
week. Every effort wB be made to complete the project in a reasonable time and
to the satisfaction of ail parties in this agreement
3. Job Corps shall provide personnel to work on said project. Equipment shall be
limited to what is available in the training program. The project owners will provide
all other equipment needed to complete the project.
4. The project owners shall provide: all diesel and gasoline fuels, oil and air filters for
the Job Corps equipment and vehicles while on this project. Transportation of all
equipment onto the project and back to the Job Corps Center. Reasonable
protection and security for ,lob Corps equipment while located on the said project.
S. The project owners are responsible for any notification of the public that will cause
inconvenience. Providing all safety supplies such as, but not limited to warning
signs, barricades or traffic control for this project. All permits, easements, and
location of utilities and services.
a. The project owners shall provide all materials to complete this project such as but
not limited to: pipe culvert, sand, gravel, gradestakes, fencing, etc.
7. Tho project owners agree to forever hold the Intemational Union of Operating
Engineers and the Job Corps Training Program blameless for any claims, lawsuits
or other action that should arise as a result of this project.
Page 1 of 2
8. AN Job Corps personnel will be covered by Insurance provided by Job Corps.
Project owners will have no responsibility for health and: accident insurance for Job
Corps personnel. Job Corps personnel will not be held liable for injuries incurred
on or around Job Corps equipment or equipment owned, leased or donated by
project owner to any non -Job Corps persons worlang or observing said project.
S. Job Corps shall have the right to install two, (2) signs on the project containing
Information relating to Job Corps involvement in the project
10. This agreement may be terminated by mutual agreement of all parties involved or
by any one of the parties with 48 hours notice to the other parties involved. After
project terminations, all equipment will be returned to the Sacramento Job Corps
Center with In 48 hours.
11. This agreement shall be null and void if any local labor union objects to this project
on the grounds of displacing local tabor.
12. City of Lodi takes responsibility for, the removal of. oxis&V utilities prior to the Start
of work, providing construction drawings and staking, traffic control and lane
closures, water tick for dust control, compaction taming. imported sod or sand,
trucking for off -hauling materials. and tree trimming.
IN WITNESS WHEREOF, the parties set their hands the day and year first above
wrlpen.
PROJECT OWNER or AGENT(S)
SACRAMENTO JOB CORPS
CENTER DIRECTOR or AGENT
Fuge 2 of 2