CITY OF LODI COUNCIL COMMUNICATION
AGENDA TITLE: Lodi Lake Park Improvements
MEETING DATE: October 5, 1999
PREPARED BY: Parks and Recreation Director
RECOMMENDED ACTION: None
BACKGROUND INFORMATION: On Monday, September 13, 1999, the Parks and Recreation
Department began the preparation work for beach and trail
improvements at Lodi Lake Park which included the removal of
twenty trees. Public telephone calls voicing concerns that trees
were being removed prompted the City Manager to halt removal by the late morning of September 13'x.
At the September 15, 1999 City Council meeting, Parks Superintendent Dwight Dauber made a
presentation to Council on the aforementioned project. After hearing public concerns being voiced,
Council directed staff to return to the drawing board and look at rerouting the path to preserve as many
trees as possible.
Staff will make a presentation of the revised trail74 p oject on a at Lodi Lake Park.
FUNDING: None
Prepared by Dwight Dauber, Parks Superintendent
RW/DD/sb
APPROVED:
Ron Williamson
Parks and Recreation Director
H. Dixon Flynn -- City Manager
09/29!99
DESIGN CRITERIA
• 12 FOOT WIDE TRAIL (CAL TRANS REQUIREMENT
TO MIX PEDESTRIAN WITH BICYCLES)
• MAINTAIN 49 FOOT FLOOD ELEVATION OF LEVEE
• HANDICAP ACCESSABILITY (A.D.A. REQUIREMENT
OF NO GREATER SLOPE THAN 5%)
• LANDSCAPED SLOPES OF NO GREATER THAN 25%
FOR GROUNDCOVER AND 15% FOR TURF
(EROSION CONTROL AND MAINTENANCE
MINIMUMS)
• ELIMINATION OF UNSAFE WALL AND SIDEWALK
ALONG TURNER ROAD
• ELIMINATION OF BICYCLES COMING DOWN STEEP
SLOPES INTO ONCOMING TRAFFIC ON TURNER
ROAD
LODI LAKE BEACH AND TRAIL
POSITIVE OUTCOMES
1. ELIMINATION OF UNSAFE BICYCLYING ON THE WESTSIDE
LEVEE AND TURNER ROAD.
2. ELIMINATION OF UNSAFE WALKING ALONG TURNER ROAD.
(NEW TRAIL IS 30 FEET FROM TRAFFIC).
3. FLOOD CONTROL ELEVATIONS ARE MAINTAINED.
4. TRAIL ACCESSABLE TO PHYSICALLY 01PARED
5. ELIMINATION OF UNSAFE, SINKING AND UNAPPEALING WALL
ALONG TURNER ROAD.
6. CREATION OF AN AESTHETIC STREETSCAPE ALONG TURNER
ROAD.
7. ADDITION OF A RECREATION TRAIL SYSTEM FOR SCHOOL KIDS,
BICYCLERS,WALKERS,JOGGERS AND CROSS-COUNTRY
RUNNERS.
S. ENHANCEMENTS TO BEACH AREA TO INCLUDE: EXPANSION OF
BEACH AREA FOR MORE ACTIVITIES, A COVERED SHELTER
TO STAGE EVENTS AND A BETTER LIGHTING AND PA SYSTEM.
9. PLANTING OF SO ADDITIONAL TREES.
DESIGN CRITERIA
• 12 FOOT WIDE TRAIL (CAL TRANS REQUIREMENT
TO MIX PEDESTRIAN WITH BICYCLES)
• MAINTAIN 49 FOOT FLOOD ELEVATION OF LEVEE
• HANDICAP ACCESSABILITY (A.D.A. REQUIREMENT
OF NO GREATER SLOPE THAN 5%)
• LANDSCAPED SLOPES OF NO GREATER THAN 25%
FOR GROUNDCOVER AND 15% FOR TURF
(EROSION CONTROL AND MAINTENANCE
MINIMUMS)
• ELIMINATION OF UNSAFE WALL AND SIDEWALK
ALONG TURNER ROAD
• ELIMINATION OF BICYCLES COMING DOWN STEEP
SLOPES INTO ONCOMING TRAFFIC ON TURNER
OPTION #1
(NO PROJECT)
PROS:
DOES NOT ELIMINATE OR EFFECT ANY TREES.
CONS:
DOES NOT ADDRESS OR RESOLVE ISSUES OF UNSAFE BICYCLING ON THE
WEST SIDE INCLUDING DANGEROUS EXIT OF BICYCLES INTO TRAFFIC
ON TURNER ROAD.
DOES NOT ADDRESS HAZARDOUS SIDEWALK ALONG TURNER ROAD.
DOES NOT ADDRESS FAILING RETAINING WALL ALONG TURNER ROAD.
DOES NOT CREATE A TRAIL SYSTEM TO UTILIZE THE PARK AND ENJOY ITS
AMENITIES.
DOES NOT CREATE A SAFE BICYCLING OR WALKING TRAIL FOR SCHOOL
CHILDREN.
OPTION #2
PROS:
DOES PLACE PEDESTRIANS AT LEAST 6 FEET AWAY FROM TRAFFIC.
CREATES PLEASING LANDSCAPED AREA ALONG TURNER ROAD.
CONS:
PLACES BICYCLES OUT IN TURNER ROAD.
WILL EFFECT THE REMOVAL OF 3 TREES ON EAST END AND 3 TREES
ON THE WEST END. WILL ALSO NEED TO REGRADE SLOPES.
DOES NOT RESOLVE THE SAFETY OF BIKES PRESENTLY EXITING ON
TURNER ROAD.
DOES NOT TIE INTO TRAIL ON WEST SIDE FOR A CONTINUOUS TRAIL
SYSTEM.
I
U
m
IL
OC
W
U
z
W
LL
t9
.sP
~`
1i
Q
C-4
Lu
o
�.4.•:
o
W
W
-�
w
z
U
co
OPTION #3
PROS:
DOES PLACE PEDESTRIANS AT LEAST 6 FEET AWAY FROM TRAFFIC.
ADDS STREET SCAPE ELEMENTS TO TURNER ROAD.
REPLACES SIDEWALK THAT IS LIFTING.
REPLACES EXISTING WALL WITH NEW WALL THEREBY ELIMINATING
FAILING WALL.
COINS:
PLACES BICYCLES OUT IN TURNER ROAD.
WILL EFFECT THE REMOVAL OF 3 TREES ON WEST END AND 3 TREES ON
EAST END.
DOES NOT ADDRESS TYING INTO TRAIL ON WEST SIDE FOR A CONTINUOUS
TRAIL SYSTEM.
DOES NOT RESOLVE SAFETY OF BIKES PRESENTLY EXISTING ON
TURNER ROAD.
COST OF WALL: $150,000.00
OPTION #4
PROS:
ELIMINATION OF UNSAFE BICYCLING ON THE WEST SIDE LEVEE AND
TURNER ROAD.
ELIMINATION OF UNSAFE WALKING ALONG TURNER ROAD. NEW TRAIL
IS 30 FEET FROM TRAFFIC.
FLOOD CONTROL ELEVATIONS ARE MAINTAINED.
TRAIL ACCESSIBLE TO PHYSICALLY IMPARED.
ELIMINATION OF UNSAFE, SINKING AND UNAPPEALING WALL ALONG
TURNER ROAD.
ADDITION OF A RECREATION TRAIL SYSTEM FOR SCHOOL KIDS, BICYCLERS,
WALKERS, JOGGERS AND CROSS-COUNTRY RUNNERS.
ENHANCEMENTS TO BEACH AREA TO INCLUDE: EXPANSION OF BEACH AREA
FOR MORE ACTIVITIES, A COVERED SHELTER TO STAGE EVENTS AND BETTEF
LIGHTING AND PA SYSTEM.
PLANTING OF 80 ADDITIONAL TREES.
MINIMAL DISRUPTION OF EXISTING TREES.
PROVIDES A SAFE BIKING AND WALKING TRAIL FOR SCHOOL CHILDREN TO
AND FROM WOODBRIDGE AND LAKEWOOD SCHOOLS.
COINS:
REQUIRES THE REMOVAL OF 4 TREES.
Tuw�uaD�
SE7--GTION
ALyzp55WA�-K
�l
NEW TREE
NEW SLOPE -
NEW TREE
NEW ro' FENGE
NEW NEW SLOPE
ASPHALT PATH
TURNER ROAD
LODI LAKE PARK
BICYCLE / PEDESTRIAN CORRIDOR PROJECT
NEW GROSS SECTION
PHASE
EXISTING ro' FENGE
EXISTING 0'
RIP RAP WALL
TURNER ROAD
LODI LAKE PARK
EXISTING TREE
(TO BE REMOVED)
EXI5TING SLOPE
I
BEACH AREA
BICYCLE / PEDESTRIAN CORRIDOR PROJECT
EXISTING GRO55SECTION
94 ss
"2� eAPy
---�Nft-69�
�l °Z���
2C' LE'S9�