Loading...
HomeMy WebLinkAboutResolutions - No. 2015-106When Recorded Please Return to: Doe .4:.2015--@86.4$2 Lodi City Clerk 07/20/2015 11:08:39 An /t P. O. Box 3006 e: 1 'of. 2 F": $ja Lodi, CA 95241-1910 K�nrzsit E1 6lekemord San Joaquin County Record*ra. pafd isy: SHOIJN ON DOCUMENT Illi MISftv I N'i X I Ul 1 RESOLUTION NO. 2015-106 A RESOLUTION OF THE LODI CITY COUNCIL ACCEPTING REYNOLDS RANCH PHASE 3A PUBLIC IMPROVEMENTS The City Council of the City of Lodi finds: 1. That the public improvements for Reynolds Ranch Phase 3A have been completed in substantial conformance with the requirements of the Improvement Agreement between the City of Lodi and Skinner Ranch Holdings, L.P., as approved by the City Council on October 1, 2014, as shown on Drawing No. D160, on file in the Public Works Department; and 2. The improvements consist of new sidewalk (south side of Harney Lane from Stockton Street to Reynolds Ranch Parkway); traffic signal improvements at the intersections of Rocky Lane and Reynolds Ranch Parkway; and full public improvements in Rocky Lane, including curb, gutter and sidewalk, water, wastewater and storm drain utilities, street lighting, and landscape and irrigation improvements; and 3. The streets to be accepted are as follows: Streets Length in Miles Harney Lane* 0.00 Reynolds Ranch Parkway* 0.00 Rocky Lane 0.13 Total New Miles of City Streets 0.13 'The street dedication for Harney Lane and Reynolds Ranch Parkway consists of landscape and irrigation improvements in an existing street right-of-way and did not add additional miles to the City's street system. 4. As conditioned in the original Environmental Impact Report, the Reynolds Ranch Development is obligated to construct intersection improvements at the Harney Lane and Stockton Street intersection and to underground the existing overhead PG&E utility poles that are located along Harney Lane at that location. If the intersection improvements are constructed with the Harney Lane Grade Separation Project prior to being constructed by the Development, the developer must reimburse the City for the cost of those improvements. The estimated cost of the intersection improvements that include the south leg of the traffic signal, ADA ramps, and pavement, curb, and gutter along Stockton Street for approximately 200 feet south of Harney Lane is $225,000. The estimated cost to underground the existing utility poles is $128,000; and 5. The public improvements installed by this project will be maintained by the City of Lodi. As a condition of acceptance, the developer is obligated to warranty all public improvements for a period of two years after the date of acceptance by the City Council. Dated: July 15, 2015 I hereby certify that Resolution No. 2015-106 was passed and adopted by the City Council of the City of Lodi in a regular meeting held July 15, 2015, by the following vote: AYES: COUNCIL MEMBERS — Chandler, Kuehne, Mounce, Nakanishi, and Mayor Johnson NOES: COUNCIL MEMBERS — None ABSENT: COUNCIL MEMBERS — None ABSTAIN: COUNCIL MEMBERS — None .•' x,11 1069 WIFE FER GSL ity Clerk ' { rVa7,,�p[ti7`��;t 2015-106