Loading...
HomeMy WebLinkAboutResolutions - No. 2014-205RESOLUTION NO. 2014-205 A RESOLUTION OF THE LODI CITY COUNCIL AUTHORIZING THE CITY MANAGER TO EXECUTE A WINERY WASTEWATER PIPELINE AGREEMENT WITH PHILLIPS FARMS, LLC, dba MICHAEL DAVID WINERY WHEREAS, the City of Lodi is proposing to build an approximately 11,500 -foot long industrial wastewater force main line within San Joaquin County's existing public right-of-way from the southeast portion of the Michael David Winery (Winery) to the City of Lodi's industrial wastewater pipeline crossing in Devries Road; and WHEREAS, current Winery production requires approximately one million gallons of winery wastewater be conveyed via tanker truck to the City's White Slough Water Pollution Control Facility, resulting in approximately 150 truck trips per year; and WHEREAS, Winery is proposing to build an industrial wastewater collection and booster pump facility on existing Winery property. Winery will fund all costs associated with planning, design, permitting, and construction of the proposed facilities and the industrial wastewater force main line. NOW, THEREFORE, BE IT RESOLVED that the Lodi City Council does hereby authorize the City Manager to execute a Winery Wastewater Pipeline Agreement with Phillips Farms, LLC, dba Michael David Winery. Dated: November 19, 2014 I hereby certify that Resolution No. 2014-205 was passed and adopted by the City Council of the City of Lodi in a regular meeting held November 19, 2014, by the following vote: AYES: COUNCIL MEMBERS — Hansen, Johnson, Mounce, Nakanishi, and Mayor Katzakian NOES: COUNCIL MEMBERS — None ABSENT: COUNCIL MEMBERS — None ABSTAIN: COUNCIL MEMBERS — None NIFER . R011ON ty Clerk 2014-205