HomeMy WebLinkAboutResolutions - No. 2014-205RESOLUTION NO. 2014-205
A RESOLUTION OF THE LODI CITY COUNCIL
AUTHORIZING THE CITY MANAGER TO EXECUTE A
WINERY WASTEWATER PIPELINE AGREEMENT WITH
PHILLIPS FARMS, LLC, dba MICHAEL DAVID WINERY
WHEREAS, the City of Lodi is proposing to build an approximately 11,500 -foot long
industrial wastewater force main line within San Joaquin County's existing public
right-of-way from the southeast portion of the Michael David Winery (Winery) to the City of
Lodi's industrial wastewater pipeline crossing in Devries Road; and
WHEREAS, current Winery production requires approximately one million gallons of
winery wastewater be conveyed via tanker truck to the City's White Slough Water Pollution
Control Facility, resulting in approximately 150 truck trips per year; and
WHEREAS, Winery is proposing to build an industrial wastewater collection and
booster pump facility on existing Winery property. Winery will fund all costs associated with
planning, design, permitting, and construction of the proposed facilities and the industrial
wastewater force main line.
NOW, THEREFORE, BE IT RESOLVED that the Lodi City Council does hereby
authorize the City Manager to execute a Winery Wastewater Pipeline Agreement with
Phillips Farms, LLC, dba Michael David Winery.
Dated: November 19, 2014
I hereby certify that Resolution No. 2014-205 was passed and adopted by the City
Council of the City of Lodi in a regular meeting held November 19, 2014, by the following
vote:
AYES:
COUNCIL MEMBERS —
Hansen, Johnson, Mounce, Nakanishi, and
Mayor Katzakian
NOES:
COUNCIL MEMBERS —
None
ABSENT:
COUNCIL MEMBERS —
None
ABSTAIN:
COUNCIL MEMBERS —
None
NIFER . R011ON
ty Clerk
2014-205