Loading...
HomeMy WebLinkAboutResolutions - No. 2014-18RESOLUTION NO. 2014-18 A RESOLUTION OF THE LODI CITY COUNCIL AWARDING AND AUTHORIZING THE CITY MANAGER TO EXECUTE THE CONTRACT FOR DIRECTIONAL BORING, EXCAVATION, AND CONDUIT INSTALLATION WHEREAS, in answer to notice duly published in accordance with law and the orders of this City Council, sealed bids were received and publicly opened on January 8, 2014, at 11:00 a.m. for directional boring, excavation, and conduit installation, described in the specifications thereof, approved by the City Council on December 18, 2013; and WHEREAS, said bids have been compared and tabulated and a report thereof filed with the City Manager as shown on Exhibit A; and WHEREAS, staff recommends awarding the contract for directional boring, excavation, and conduit installation to the lowest, compliant bidder, Westech Industries, Incorporated, of Galt, California, in an amount not to exceed $500,000. NOW, THEREFORE, BE IT RESOLVED the Lodi City Council does hereby award the contract for directional boring, excavation and conduit installation to the low bidder, Westech Industries, Incorporated, of Galt, California, in an amount not to exceed $500,000; and BE IT FURTHER RESOLVED the City Manager is hereby authorized to execute the contract. Dated: February 5, 2014 ------------------------------------------------------------------------ ------------------------------------------------------------------------ I hereby certify that Resolution No. 2014-18 was passed and adopted by the City Council of the City of Lodi in a regular meeting held February 5, 2014, by the following vote: AYES: COUNCIL MEMBERS — Hansen, Johnson, Nakanishi, and Mayor Katzakian NOES: COUNCIL MEMBERS — None ABSENT: COUNCIL MEMBERS — Mounce ABSTAIN: COUNCIL MEMBERS — Non&DIL-COLSON City Clerk 2014-18 Bidder Cal Electro, Inco Daleo, Inc Diede Const, Inc. Westech ind. ITEM NO. DESCRIPTION UNIT Price Price Price Price Trench I Mainline Trench {NonlointUse) LF 130.06 40.00 21.23 38.63 2 Secondary Trench(NonlolntTrench) LF 115.00 31.00 21.23 5532 3 Compact/BackfillMainline Trench LF 75.00 25.25 23.40 10.20 4 Compact/Backfill Secondary Trench LF 55.00 20.00 23.40 10.20 5 Remove/Replace Concrete SF 39.00 28.75 50.25 30.60 6 Remove/Replace Ashphalt SF 28.00 32.00 43.33 25.50 7 Remove/Replece landscaping(Sod) SF 13.00 5.75 14.71 5.10 8 Trench Plate Install/Remove (Including Prep) EA 150.00 100.00 507.00 10.20 9 Assemble and install 6" Conduit LF 15.00 6.85 9A3 2.04 10 Aseemble and Install 4" Conduit LF iLDO 437 8.25 2.04 11 Assemble and Install 3" Conduit LF 8.00 3.67 842 142 12 Assemble and install 2" Conduit LF 7.OD 2.8D 7.93 1.02 13 Assemble and install 1" Conduit LF 6.00 LSD 7A5 OSS 14 Assemble and Install 3/4" Conduit LF 4.00 LSD 7.32 0.51 35 Install Each Additional Conduit LF 4.OD 5.85 6.93 1.02 16 Bore and Install 4" Conduit LF 68.00 53.00 41.96 59.02 17 Bore and Install 4" Conduit LF 58.00 34.00 41.7a 50.28 18 Bore and Install 3" Conduit LF 47.DD 33.50 41.69 43.80 19 Bore and Install 2" Conduit LF 40.00 23.85 41.63 36.43 20 Bore and Install 1" Conduit LF 30.01) 23.25 41.42 36.07 21 Bore and Install 3/4" Conduit LF 2&DD 23.25 41.28 35.99 22 Send/Recive Pit (Per Job) EA 1,500.00 250.00 2,03450 204.00 23 Install Each Additional Conduit LF 10.00 5.00 208.00 10.20 24 Mobilization/DemobilWtlon EA 425.00 - 650.DD 99L90 255.00 25 Disposal of Excess Material CY 60.00 60.00 179.40 5,10 26 Construction Notification (Per Project) EA 1,200.00 250.00 429.00 302.10 27 EU Field Directed Work 50,ODD.00 50,OOD.OD 50,000.00 50,000.00 Sub -Total Bid $54,126.00 $51,715.14 $54,857.44 $51,031.90 Unit Price Bid (Less Item 27) $4,126.00 $1,715.14 $4,857.44 $1,031.90 Avg. Unit Bid $158.69 $65.97 $386.82 $39.69