Loading...
HomeMy WebLinkAboutResolutions - No. 2012-183RESOLUTION NO 2012-183 A RESOLUTION OF THE LODI CITY COUNCIL AWARDING CONTRACTAND AUTHORIZING THE CITY MANAGER TO EXECUTE CONTRACT FOR DIRECTIONAL BORINGAND CONDUIT INSTALLATION WHEREAS, in answer to notice duly published in accordance with law and the order of this City Council, sealed bids were received and publicly opened on November 7, 2012, at 11:00 a.m., for directional boring and conduit installation, described in the specifications thereof, approved by the City Council on October 3; 2012; and WHEREAS, said bids have been compared, checked, and tabulated and a report thereof filed with the City Manager as shown in ExhibitA; and WHEREAS, staff recommends awarding the contract for directional boring and conduit installation to the low bidder and local vendor, Diede Construction, Inc., of Woodbridge, in the amount not to exceed $300,000. NOW, THEREFORE, BE IT RESOLVED that the Lodi City Council does hereby authorize the award of the contract for directional boring and conduit installation to Diede Construction, Inc., of Woodbridge, in the amount not to exceed $300,000; and BE IT FURTHER RESOLVED that the City Manager is hereby authorized to execute the contract on behalf of the City. Dated: November 21, 2012 ------------------------------------------------------------------ ------------------------------------------------------------------ hereby certify that Resolution No. 2012-183 was passed and adopted by the City Council of the City of Lodi in a regular meeting held November 21, 2012, by the following vote: AYES: COUNCIL MEMBERS — Hansen, Johnson, Katzakian, Nakanishi, and Mayor Mounce NOES: COUNCIL MEMBERS — None ABSENT: COUNCIL MEMBERS — None ABSTAIN: COUNCIL MEMBERS — None JOHL City Clerk 2012-183 Directional Boringand Conduit Installation Bid Tabulation Received 11/07/2012 EXHIBITA Directional Boring and Conduit Installation Bid Tab Died Deieo Golden Irish Item Description Unit Est'd Qty. Unit Price Unit Price Unit Price Unit Price 1 One 1 each 6 Schedule40 PVC Bore Guard or Certacom LF $0.00 $44.00 1 70.25 56.75 $95.86 One 1 each 5" Schedule 40 PVC Bore Guard or Certacom LF $0.00 $43.00 $68.60 $52.65 $94.36 One (1) each 4" Schedule 40 PVC Bore Guard or Certacom LF $0.00 $36.00 $44.75 $48.75 $92.86 One (1) each 3 Schedule 40 PVC Bore Guard or Certacom LF $0.00 $30.00 $44.65 $45.00 $92.36 Two (2) 3" Schedule 40 PVC Bore Guard or Certacom LF $0.00 $37.00 $52.45 $50.75 $95.36 One (1) each 2 HDPE LF 00 23.00 35.15 $42.75 $91.36 Two (2) 2" HDPE LF $0.00 1 25.00 1 $36.00 $46.00 $93.36 Three (3) 2" HDPE LF $0.00 $30.00 $36.90 $49.00 $95.36 One (1) %" HDPE LF $0.00 $22.00 $35.00 $42.00 $89.36 Two (2)%' HDPE LF 0.00 $23.00 $35.00 $45.00 $89.36 2 Excavate, Trench, Backfill, and Compact all Excavations LF $0.00 $50.00 $65.00 $84.00 $42.50 3 As halt Removal and Replacement as required above need for standard boring work SF 1 $0.00 $35.00 $32.00 $28.75 $32.00 4 Concrete Removal and Re lacementas required above need for standard boring work SF $0.00 $35.00 1 $27.00 $34.75 $42.24 5 Curb and Gutter Removal and Replacement SF $0.00 $32.00 $42.00 $56.50 $42.00 6 Dispose of all excess material for each project EA $0.00 $250.00 $250.00 $650.00 $500.00 7 Construction notification for each project EA $0.00 $81.00 $250.00 $725.00 $500.00 8 Excavation Safety for each project I EA $0.00 $312.00 $250.00 1 $375.00 1 $500.00