HomeMy WebLinkAboutResolutions - No. 2012-183RESOLUTION NO 2012-183
A RESOLUTION OF THE LODI CITY COUNCIL
AWARDING CONTRACTAND AUTHORIZING THE CITY
MANAGER TO EXECUTE CONTRACT FOR DIRECTIONAL
BORINGAND CONDUIT INSTALLATION
WHEREAS, in answer to notice duly published in accordance with law and the
order of this City Council, sealed bids were received and publicly opened on November
7, 2012, at 11:00 a.m., for directional boring and conduit installation, described in the
specifications thereof, approved by the City Council on October 3; 2012; and
WHEREAS, said bids have been compared, checked, and tabulated and a report
thereof filed with the City Manager as shown in ExhibitA; and
WHEREAS, staff recommends awarding the contract for directional boring and
conduit installation to the low bidder and local vendor, Diede Construction, Inc., of
Woodbridge, in the amount not to exceed $300,000.
NOW, THEREFORE, BE IT RESOLVED that the Lodi City Council does hereby
authorize the award of the contract for directional boring and conduit installation to Diede
Construction, Inc., of Woodbridge, in the amount not to exceed $300,000; and
BE IT FURTHER RESOLVED that the City Manager is hereby authorized to
execute the contract on behalf of the City.
Dated: November 21, 2012
------------------------------------------------------------------
------------------------------------------------------------------
hereby certify that Resolution No. 2012-183 was passed and adopted by the
City Council of the City of Lodi in a regular meeting held November 21, 2012, by the
following vote:
AYES: COUNCIL MEMBERS — Hansen, Johnson, Katzakian, Nakanishi,
and Mayor Mounce
NOES: COUNCIL MEMBERS — None
ABSENT: COUNCIL MEMBERS — None
ABSTAIN: COUNCIL MEMBERS — None
JOHL
City Clerk
2012-183
Directional Boringand Conduit Installation
Bid Tabulation
Received 11/07/2012
EXHIBITA
Directional Boring and Conduit Installation
Bid Tab
Died
Deieo
Golden
Irish
Item
Description
Unit
Est'd Qty.
Unit Price
Unit Price
Unit Price
Unit Price
1
One 1 each 6 Schedule40 PVC Bore Guard or Certacom
LF
$0.00
$44.00 1
70.25
56.75
$95.86
One 1 each 5" Schedule 40 PVC Bore Guard or Certacom
LF
$0.00
$43.00
$68.60
$52.65
$94.36
One (1) each 4" Schedule 40 PVC Bore Guard or Certacom
LF
$0.00
$36.00
$44.75
$48.75
$92.86
One (1) each 3 Schedule 40 PVC Bore Guard or Certacom
LF
$0.00
$30.00
$44.65
$45.00
$92.36
Two (2) 3" Schedule 40 PVC Bore Guard or Certacom
LF
$0.00
$37.00
$52.45
$50.75
$95.36
One (1) each 2 HDPE
LF
00
23.00
35.15
$42.75
$91.36
Two (2) 2" HDPE
LF
$0.00 1
25.00 1
$36.00
$46.00
$93.36
Three (3) 2" HDPE
LF
$0.00
$30.00
$36.90
$49.00
$95.36
One (1) %" HDPE
LF
$0.00
$22.00
$35.00
$42.00
$89.36
Two (2)%' HDPE
LF
0.00
$23.00
$35.00
$45.00
$89.36
2
Excavate, Trench, Backfill, and Compact all Excavations
LF
$0.00
$50.00
$65.00
$84.00
$42.50
3
As halt Removal and Replacement as required above need for standard boring
work SF
1 $0.00
$35.00
$32.00
$28.75
$32.00
4
Concrete Removal and Re lacementas required above need for standard boring
work SF
$0.00
$35.00 1
$27.00
$34.75
$42.24
5
Curb and Gutter Removal and Replacement
SF
$0.00
$32.00
$42.00
$56.50
$42.00
6
Dispose of all excess material for each project
EA
$0.00
$250.00
$250.00
$650.00
$500.00
7
Construction notification for each project
EA
$0.00
$81.00
$250.00
$725.00
$500.00
8
Excavation Safety for each project
I EA
$0.00
$312.00
$250.00 1
$375.00 1
$500.00