Loading...
HomeMy WebLinkAboutResolutions - No. 2012-142RESOLUTION NO. 2012-142 A RESOLUTION OF THE LODI CITY COUNCIL APPROVING MASTER PLANS FOR WATER, WASTEWATER, STORM DRAINAGE, AND BICYCLE; APPROVING IMPACT MITIGATION FEE PROGRAM REPORTAND SCHEDULE OF FEES; AND APPROVING IMPACT MITIGATION FEE PROGRAM SCHEDULE OF REDUCED FEES WHEREAS, in 1991, City Council approved the impact Mitigation Fee Program (IMFP) that established impact fees in the categories of water, wastewater, storm drainage, streets, police, fire, parks, and general City facilities. An electric utility impact fee was established in 2007. With the 2010 adoption of the new General Plan for the City, it is the propertime to perform an overhaul of the IMFP; and WHEREAS, master plans for water, wastewater, storm drainage, and bicycle infrastructure have been prepared in conjunction with the IMFP and an initial study/mitigated negative declaration for the master plans has been prepared and distributed for public comments by the Community Development Department; and WHEREAS, the IMFP Report presents details regarding the assumptions, methodologies, facilities standards, projects, costs, and cost allocation factors used to establish the nexus between the fees and the development upon which the fees will be levied. The Technical Appendix to the report includes the detailed project descriptions, cost estimates, cost allocation factors, and fee calculations; and WHEREAS, the IMFP Report has been distributed to representatives of the building community and others that expressed interest in the project, and a copy was made available to the public at the Public Works Department and on the City's website; and WHEREAS, a public hearing was held to receive public comment on the master plans, the IMFP Report and Schedule of Fees and the IMFP Schedule of Reduced Fees. NOW, THEREFORE, BE IT RESOLVED that the Lodi City Council does hereby approve the master plans for water, wastewater, storm drainage, and bicycle; and BE IT FURTHER RESOLVED that the City Council does hereby approve the Impact Mitigation Fee Program Report and Schedule of Fees, attached hereto as Exhibit A; and BE IT FURTHER RESOLVED that the City Council does hereby approve the Impact Mitigation Fee Program Schedule of Reduced Fees, attached hereto as Exhibit B. Dated: August 15, 2012 hereby certify that Resolution No. 2012-142 was passed and adopted by the City Council of the City of Lodi in a regular meeting held August 15, 2012, by the following vote: AYES: COUNCIL MEMBERS — Hansen, Johnson, Katzakian, Nakanishi, and Mayor Mounce NOES: COUNCIL MEMBERS — None ABSENT: COUNCIL MEMBERS — None ABSTAIN: COUNCIL MEMBERS— None RANDI JOHL City Clerk 2012-142 Exhibit A Impact Mitigation Fee Program Schedule of Fees Table A-1: Water and Wastewater Fees Meter Size Water Wastewater 5/8 -inch meter $2,079 $2,831 3/4 -inch meter $3,103 $4,225 1 -inch meter $5,181 $7,056 1 1/2 -inch meter $10,332 $14,070 2 -inch meter $16,537 $22,521 3 -inch meter $31,026 $42,253 4 -inch meter $51,721 $70,435 6 -inch meter $103,411 $140,828 8 -inch meter $165,464 $225,333 10 -inch meter $237,880 $323,951 Table A-2: Transportation, Police, Fire, General City Facilities, Park and RESIDENTIAL LAND USES NON-RESIDENTIAL LAND USES Low Medium High Office/ Density Density Density Retail Medical Industrial Fee Component (per Unit) (per Unit) (per Unit) (per 1,000SF) (per 1,000SF) (per 1,000SF) Transportation $711 $386 $386 $1,199 $872 $443 Police $753 $634 $528 $330 $528 $176 Fire $385 $324 $270 $338 $540 $180 Park $3,890 $3,276 $2,730 $406 $650 $217 General City Facilities $617 $519 $433 $270 $433 $144 Art in Public Places $80 $67 $56 $35 $56 $19 Table A-3: Residential Electric Utilitv Fees Table A-4: Non-ResidentialElectric Utilitv Fees 240 Volts Single Phase Panel 480 Volts 60 amps $248 100 amps $413 125 amps $516 200 amps $826 400 amps $1,652 600 amps $2,478 Table A-4: Non-ResidentialElectric Utilitv Fees 208 Volts 240 Volts 480 Volts Simile Phase Panel 60 amps n/a $248 n/a 100 amps n/a $413 n/a 125 amps n/a $516 n/a 200 amps n/a $826 n/a 400 amps n/a $1,652 n/a 600 amps n/a $2,478 n/a Three Phase Panel 200 amps $1,178 $1,359 $2,718 400 amps $2,356 $2,718 $5,437 600 amps $3,534 $4,077 $8,155 800 amps $4,712 $5,437 $10,873 1000amps $5,890 n/a $13,591 1200amps $7,068 n/a $16,310 1600 amps $9,423 n/a $21,746 2000 amps $11,779 n/a $27,183 2500 amps $14,724 n/a $33,979 3000 amps $17,669 n/a $40,774 Table A-5: Storm Drainage Fees RESIDENTIAL LAND USES Low Medium High Density Density Density Fee Component (per Unit) (per Unit) (per Unit) Storm Drainage - Zone 1 $1,394 $697 $561 Storm Drainage - Zone 2 NON-RESIDENTIAL LAND USES Office/ Retail Medical Industrial (per Acre) (per Acre) (per Acre) $14,640 $14,640 $15,686 $4,237 $2,118 $1,703 1 $44,485 $44,485 $47,663 Table A-6: South Wastewater Trunk Line Fees RESIDENTIAL LAND USES NON-RESIDENTIAL LAND USES Low Medium High Office/ Density Density Density Retail Medical Industrial Fee Component (per Unit) (per Unit) (per Unit) (per 1,000sf) (per 1,000Sf (per 1,000sO South Wastewater Trunk Line' $1,181 $994 $829 $1,096 n/a n/a 1 Applies only to developmentthat will benefit from construction of the wastewater trunk line serving the southern area of the Citv. Exhibit B Impact Mitigation Fee Program Schedule of Reduced Fees Table B-1: Water and Wastewater Fees Meter Size Residential Water Wastewater Non -Residential Water Wastewater 5/8 -inch meter $846 $1,152 $2,079 $2,831 3/4 -inch meter $1,263 $1,720 $3,103 $4,225 1 -inch meter $2,109 $2,873 $5,181 $7,056 1 1/2 -inch meter $4,206 $5,728 $10,332 $14,070 2 -inch meter $6,732 $9,168 $16,537 $22,521 3 -inch meter $12,631 $17,201 $31,026 $42,253 4 -inch meter $21,056 $28,674 $51,721 $70,435 6 -inch meter $42,099 $57,331 $103,411 $140,828 8 -inch meter $67,360 $91,733 $165,464 $225,333 10 -inch meter $96,841 $131,880 $237,880 $323,951 RESIDENTIAL LAND USES NON-RESIDENTIAL LAND USES Low Medium High Office/ Density Density Density Retail Medical Industrial Fee Component (per Unit) (per Unit) (per Unit) (per 1,OOOSF) (per 1,000 SF) (per 1,000 SF) Transportation $289 $157 $157 $1,199 $872 $443 Police $307 $258 $215 $330 $528 $176 Fire $157 $132 $110 $338 $540 $180 Park $1,584 $1,334 $1,111 $406 $650 $217 General City Facilities $251 $211 $176 $270 $433 $144 Art in Public Places $33 $27 $23 $35 $56 $19 Table B-3: Residential Electric Utility Fees Table B-4: Non -Residential Electric Utility Fees 240 Volts Single Phase Panel 480 Volts 60 amps $101 100 amps $168 125 amps $210 200 amps $336 400 amps $673 600 amps $1,009 Table B-4: Non -Residential Electric Utility Fees 208 Volts 240 Volts 480 Volts Single Phase Panel 60 amps n/a $248 n/a 100 amps n/a $413 n/a 125 amps n/a $516 n/a 200 amps n/a $826 n/a 400 amps n/a $1,652 n/a 600 amps n/a $2,478 n/a Three Phase Panel 200 amps $1,178 $1,359 $2,718 400 amps $2,356 $2,718 $5,437 600 amps $3,534 $4,077 $8,155 800 amps $4,712 $5,437 $10,873 1000 amps $5,890 n/a $13,591 1200 amps $7,068 n/a $16,310 1600 amps $9,423 n/a $21,746 2000 amps $11,779 n/a $27,183 2500 amps $14,724 n/a $33,979 3000 amps $17,669 n/a $40,774 Table &5: Storm Drainage Fees RESIDENTIAL LAND USES NON-RESIDENTIALLAND USES Low Medium High Office/ Density Density Density Retail Medical Industrial (per Unit) (per Unit) (per Unit) (per Acre) (per Acre) (per Acre) $567 $284 $228 $14,640 $14,640 $15,686 $1,725 $862 $693 $44,485 $44,485 $47,663 Storm Drainage - Zone 2 Table B-6: South Wastewater Trunk Line Fees RESIDENTIAL LAND USES NON-RESIDENTIAL LAND USES Low Medium High Office/ Density Density Density Storm Drainage - Zone 1 Pee Component (per Unit) (per Unit) Storm Drainage - Zone 2 Table B-6: South Wastewater Trunk Line Fees RESIDENTIAL LAND USES NON-RESIDENTIAL LAND USES Low Medium High Office/ Density Density Density Retail Medical Industrial Pee Component (per Unit) (per Unit) (per Unit) (per 1,000 s0 (per 1,000 s0 (per 1,000 s0 South Wastewater Trunk Line' $481 $405 $337 $446 n/a n/a