Loading...
HomeMy WebLinkAboutResolutions - No. 2011-169RESOLUTION NO. 2011-169 A RESOLUTION OF THE LODI CITY COUNCIL APPROVING THE PURCHASE OF PADMOUNT TRANSFORMERS FROM HEES ENTERPRISES, INC., OF ASTORIA, OREGON, AND CG POWER SYSTEMS USA INC., OF WASHINGTON, MISSOURI WHEREAS, in answer to notice duly published in accordance with law and the order of this City Council, sealed bids were received and publicly opened on September 14, 2011, at 11:00 a.m. for the purchase of padmount transformers for the Electric Utility Department, described in the specifications therefore approved by the City Council on August 17, 2011; and WHEREAS, said bids have been compared as to life -cycle costs, checked, and tabulated and a report thereof filed with the City Manager as shown on ExhibitA attached; and WHEREAS, the bids meeting the City's specification with the lowest estimated life -cycle costs are shown below: 5 each 75kVA, 240/120V I -Phase Pad 2 each 225kVA, 480/227V 3 -Phase Pad 3 each 1500kVA, 480/277V 3 -Phase Pad HEES Enterprises, Inc. CG Power System CG Power System $11,464.60 $13,057.15 $57,897.31 NOW, THEREFORE, BE IT RESOLVED that the Lodi City Council does hereby approve the purchase of padmount transformers as shown above in the amount of $82,419.06. Dated: November2,2011 hereby certify that Resolution No. 2011-169 was passed and adopted by the City Council of the City of Lodi in a regular meeting held November 2, 201 1, by the following vote: AYES: COUNCIL MEMBERS — Hansen, Katzakian, Mounce, Nakanishi, and Mayor Johnson NOES: COUNCIL MEMBERS — None ABSENT: COUNCIL MEMBERS— None ABSTAIN: COUNCIL MEMBERS — None RAN I OHL City Clerk 2011-169 'Transformer Bid Evaluation Padmount For 10/19/2011 Council Meeting EXHIBIT A. - PAD MOUNTED TRANSFORMER BID EVALUATION October 19, 2011 Bid Opening: September 14, 2011 Tax (factor): 1.0775 Primary Windings: No Load Loss $/watt: 3.75 Load Loss $/watt: 1.25 Bid Item 1: 75 kVA, 240/120 Volt, Single Phase Pad Three -Phase, 12000 Volt, 60Hz, Delta Connected Single -Phase, 12000 Grd. Wye/6930 Volt, 60Hz Number of units: 5 65 >1.8 Vendor Unit Extended Price No Load Load No Load Load Cost of Life Cycle Delivery Height Impedance Price $ Price $ w/tax $ Loss (watts) -OSS (watt Loss value Loss value Losses $ Cost $ (weeks) (inches) I % HD Supply Utilities 2,387.00 11.935.00 12,859.96 116 731 2,175.00 4,568.75 1 6,743.75 19,603.71 20-22 24 2.140 Pacific Utilities (ABB, Inc.) 2,440.00 12,200.00 13,145.50 125 636 2,343.75 3,975.00 6,318.75 19,464.25 9-11 32 1.980 Hees Enterprises Inc. (Ermco Transformers) 2,128.00 10,640.00 11,464.60 135 686 2,531.25 4,287.50 6,818.75 18,283.35 8-10 28 2.000 CG Power System no Quote Bid Item 2: 225kVA, 480/277 Volt, Three Phase Pad, Vendor Number of units: Unit Extended Price _ No Load Load No Load Load Price $ Price $ w/tax $ .oss (watts .oss (watts Loss value Loss value HD Supply Utilities 7,832.00 15,664.00 16,877.96 , 431 1997 3,232.50 4,992.50 Pacific Utilities (ABB, Inc.) 7,750.00 15,500.00 16,701.2552 1791 2,640.00 4,477.50 1 3 Hees Enterprises Inc. (Ermco Transformers) 7,089.00 14,178.00 15,276.80 434 1626 3,255.00 4,065.00 CG Power System 6,059.00 12,118.00 13,057.15 487 1,822 3,652.50 4,555.00 Bid Item 3: 1500 kVA, 480/277 Volt, Three Phase Pad, Vendor IHD Supply Utilities [Pacific Utilities (ABB, Inc.) IHees Enterprises Inc. (Ermco Transformers) ICG Power System Hees Enterprises Inc. (Ermco Transformers) CG Power System USA Inc. CG Power System USA Inc. Unit Extended Price $ Price $ I 23,125.00 20,575.00 21,229.00 17,911.00 Bid Item 1 2 3 69,375.00 61,725.00 63,687.00 53,733.00 Price No Load Load No Load w/tax $ Loss (watts .oss (watt Loss value 2 Cost of Life Cycle Delivery Losses $ Cost $ (weeks) 65 Height (inches) 8,225.00 25,102.96 10-12 7,117.50 23,818.75 9-11 7,320.00 22,596.80 8-10 49 8,207.50 21,264.65 8-10 52 Number of units:I 3 74,751.56 1938 9785 21,802.50 66,508.69 1434 10107 16,132.50 68,622.74 1599 10102 17,988.75 57,897.31 1633 11345 18,371.25 Lowest Total Price 11,464.60 13,057.15 57,897.31 82,419.06 BSU Account No.l 160.1496 I Prepared by: Weldat Haile P.E. Senior Power Enginner 11-02-11 WI -I Award Padmount Transforrhers - Attach.xls 1 Load Loss value 36,693.75 37,901.25 37,882.50 42,543.75 Cost of Losses $ 58,496.25 54,033.75 55,871.25 60,915.00 Life Cycle Cost $ 133,247.81 120,542.44 124,493.99 118,812.31 Total LCC 18,283.35 21,264.65 118,812.31 158,360.31 >3.5 Impedance 4.340 3.890 4.700 3.560 90 >5.3 Delivery I Height Impedance (weeks) I (inches) % 13-15 5.700 8-10 6.260 8-10 63 5.8 8-10 74 5.750