Loading...
HomeMy WebLinkAboutAgenda Report - May 5, 1999 E-05,. COUNCIL • • �41FOR� AGENDA TITLE: Accept Improvements Under Contract for Century Boulevard and Rivergate Drive Electric Utility Substructures MEETING DATE: May 5, 1999 PREPARED BY: Public Works Director RECOMMENDED ACTION: That the City Council accept the improvements under the "Century Boulevard and Rivergate Drive Electric Utility Substructures" contract and direct the City Engineer to file a Notice of Completion with the County Recorder's office. BACKGROUND INFORMATION: The project was awarded to Royal Electric Company, of Sacramento, on November 18, 1998, in the amount of $218,450.00. The contract has been completed in substantial conformance with the plans and specifications approved by the City Council. The contract completion date was April 13, 1999, and the actual completion date was March 12, 1999. The final contract price was $244,348.85. A requirement of City Resolution 85-72 is that Council be informed of all Contract Change Orders over 10% of the contract amount. The attached Contract Change Order #1, approved by the City Manager, was in the amount of $35,746.20, which is 16.4% of the contract. The work in the Contract Change Order included additional quantities of asphalt concrete and controlled density fill. The trench location was moved closer to the gutter to avoid an existing gas main and the new location involved the removal and replacement of additional asphalt concrete. Additional controlled density fill was also required on this project because the trench depth was increased so the new conduits could be placed under existing utilities. FUNDING: Budgeted Fund: 1998199 Electric Utility Department Distribution System Improvements Contract Amount: $244,348.85 Pt'Li Richard C. Prima, Public Works Director Prepared by Wesley K. Fujitani, Senior Civil Engineer RCP/WKF/Im Attachment cc: Purchasing Officer EUD Engineering and Operations Manager APPROVED: Campt.doc H. Dixon Flynn -- City 04/26/99 CITY OF LODI PUBLIC WORKS DEPARTMERECEIV ONTRACT CHANGE ORDER NO. 1 APR 0 2 1999 Sheet 1 of 1 Date 4/01/99 ROYAL ELECTRIC CO Account No. 161652 PROJECT: CENTURY BOULEVARD & RIVERGATE DRIVE ELECTRIC UTILITY SUBSTRUCTURES CONTRACTOR: Royal Electric You are directed to make the following changes or do the following work not included in the Plans and Specifications on this contract. ---------------------------------------------------------------------- Description of work to be done, estimate of quantities, and prices to be paid. Specify whether additional work is at contract price, agreed price, or force account. Unless otherwise stated, rales sur renial of equipment cover only such time as equipment is actually used and no allowance will be made for idle time. 1. Add 4,106.5 Square feet of Contract Item #2 "Remove and Replace Asphalt Concrete" at $4.76/SF Agreed Upon Price $19,546.94 2. Modify vault covers to include bolt down lids. Agreed Upon Price $ 1,437.73 3. Additional controlled density fill required due to increased trench depth. Agreed Upon Price $14,430.68 4. Replace 36 -inch radius bends with 48 -inch radius bends. Agreed Upon Price $ 330.85 TOTAL $35,746.20 PERCENT OF CONTRACT Original Contract Price $ 218,450.00 Total Cost of This Change Order NOT TO EXCEED $ 35,746.20 16.4% Previous Change Orders $ 0.00 Total Cost of All Change Orders to Date $ 35,746.20 16.4% Contract Price, Including All Change Orders, Will Be: $ 254,196.20 Time of completion will be adjusted as follows: N/A ---------------------------------------------------------------------- Submitted By Date - 4 Approval Recommend Date 4 -17If cr - Approved, Public Works Director Date i is Approved, City a ager e ublic Works Policies and P cedures, Administratio 4. ) Date 9 The and rsigned ntractor, Ifaving carefully considered the change proposed, agrees, if this proposal is approved, to provide all equipment, furnish all materials, except as otherwise noted above, perform all services necessary for the work above specified, and accept as full payment the prices shown above. ACCEPTED: Date4 f 6f 9y Contractor ZOyA(_ � 771 L C�Oy'/Pj�vy By WTitle V e -d Pew 1 P4W7' t3d�T C. c c— If the contractor does not sign acceptance of this order, the contractor should refer to Section 4- 1.03A of the Standard Specifications regarding filing a written protest within the specified time.