Loading...
HomeMy WebLinkAboutAgenda Report - May 5, 1999 E-04o COUNCIL• • - J AGENDA TITLE: Accept Public Improvements in Millsbridge Subdivision, Phase 1 (WID Crossing Only) MEETING DATE: May 5, 1999 PREPARED BY: Public Works Director RECOMMENDED ACTION: That the City Council adopt the attached resolution accepting the public improvements for Phase 1 of the Millsbridge Subdivision. BACKGROUND INFORMATION: Improvements for Phase 1 of the Millsbridge Subdivision have been completed in substantial conformance with the requirements of the Improvement Agreement between the City of Lodi and Tokay Development, Inc., R. Thomas Development, Inc., and Lowell B. Flemmer, as approved by the City Council on November 19, 1997, and as shown on Drawings No. 97DO98 through 97D104. These improvements consist of the Mills Avenue roadway structure and a water main crossing the Woodbridge Irrigation District (WID) Canal. The total cost for this project is $369,610.76. The Phase 1 improvements did not include the final paving and miscellaneous grading and improvements related to the finished roadway over the crossing. This finish work will be included as part of the final subdivision improvements. The crossing will remain closed to traffic until the remaining phases of the Millsbridge subdivision improvements are ready for City acceptance. FUNDING: $369,611 from Development Impact Mitigation funds. "Q� a Richard C. Prima, Jr. Public Works Director Prepared by Wesley K. Fujitani, Senior Civil Engineer RCP/WKF/Im Attachment cc: City Attorney Senior Civil Engineer - Development Services Associate Traffic Engineer Street Superintendent Engineering Technician Supervisor Tamura Chief Building Inspector Tokay Development, Inc., c/o Jeff Kirst Z' APPROVED: ' H. Dixon Flynn -- City anager caccptmillsbridge.doc 04/23/gg When Recorded, Return to: City of Lodi City Clerk's Office P.O. Box 3006 Lodi, CA 95241-1910 RESOLUTION NO. 99-69 A RESOLUTION OF THE LODI CITY COUNCIL ACCEPTING THE DEVELOPMENT IMPROVEMENTS INCLUDED IN THE IMPROVEMENT AGREEMENT FOR MILLSBRIDGE SUBDIVISION, PHASE 1 (WID CROSSING ONLY) The City Council of the City of Lodi finds: 1. That all requirements of the Improvement Agreement between the City of Lodi and Tokay Development, Inc., R. Thomas Development, Inc., and Lowell B. Flemmer, for the improvements in Millsbridge Subdivision, Phase 1, (WID Crossing only), have been substantially complied with. The improvements are shown on Drawings No. 97DO98 and 97D104 on file in the Public Works Department, and as specifically set forth in the plans and specifications approved by the City Council on November 19, 1997. The streets to be accepted are as follows: None. Dated: May 5, 1999 -------------------------------------------------------------------- -------------------------------------------------------------------- I hereby certify that Resolution No. 99-69 was passed and adopted by the City Council of the City of Lodi in a regular meeting held May 5, 1999, by the following vote: AYES: COUNCIL MEMBERS — Hitchcock, Mann, Nakanishi, Pennino and Land (Mayor) NOES: COUNCIL MEMBERS — None ABSENT: COUNCIL MEMBERS — None ABSTAIN: COUNCIL MEMBERS — None ALICE M. EIMCHE City Clerk