AGENDA TITLE: Accept Public Improvements in Millsbridge Subdivision, Phase 1
(WID Crossing Only)
MEETING DATE: May 5, 1999
PREPARED BY: Public Works Director
RECOMMENDED ACTION: That the City Council adopt the attached resolution accepting the public
improvements for Phase 1 of the Millsbridge Subdivision.
BACKGROUND INFORMATION: Improvements for Phase 1 of the Millsbridge Subdivision have been
completed in substantial conformance with the requirements of the
Improvement Agreement between the City of Lodi and
Tokay Development, Inc., R. Thomas Development, Inc., and
Lowell B. Flemmer, as approved by the City Council on November 19, 1997, and as shown on
Drawings No. 97DO98 through 97D104. These improvements consist of the Mills Avenue roadway
structure and a water main crossing the Woodbridge Irrigation District (WID) Canal. The total cost for
this project is $369,610.76.
The Phase 1 improvements did not include the final paving and miscellaneous grading and
improvements related to the finished roadway over the crossing. This finish work will be included as part
of the final subdivision improvements. The crossing will remain closed to traffic until the remaining
phases of the Millsbridge subdivision improvements are ready for City acceptance.
FUNDING: $369,611 from Development Impact Mitigation funds.
"Q� a
Richard C. Prima, Jr.
Public Works Director
Prepared by Wesley K. Fujitani, Senior Civil Engineer
RCP/WKF/Im
Attachment
cc: City Attorney
Senior Civil Engineer - Development Services
Associate Traffic Engineer
Street Superintendent
Engineering Technician Supervisor Tamura
Chief Building Inspector
Tokay Development, Inc., c/o Jeff Kirst
Z'
APPROVED: '
H. Dixon Flynn -- City anager
caccptmillsbridge.doc 04/23/gg
When Recorded, Return to:
City of Lodi City Clerk's Office
P.O. Box 3006
Lodi, CA 95241-1910
RESOLUTION NO. 99-69
A RESOLUTION OF THE LODI CITY COUNCIL
ACCEPTING THE DEVELOPMENT IMPROVEMENTS
INCLUDED IN THE IMPROVEMENT AGREEMENT FOR
MILLSBRIDGE SUBDIVISION, PHASE 1 (WID CROSSING
ONLY)
The City Council of the City of Lodi finds:
1. That all requirements of the Improvement Agreement between the City of Lodi and
Tokay Development, Inc., R. Thomas Development, Inc., and Lowell B. Flemmer, for the
improvements in Millsbridge Subdivision, Phase 1, (WID Crossing only), have been
substantially complied with. The improvements are shown on Drawings No. 97DO98 and
97D104 on file in the Public Works Department, and as specifically set forth in the plans
and specifications approved by the City Council on November 19, 1997.
The streets to be accepted are as follows: None.
Dated: May 5, 1999
--------------------------------------------------------------------
--------------------------------------------------------------------
I hereby certify that Resolution No. 99-69 was passed and adopted by the City
Council of the City of Lodi in a regular meeting held May 5, 1999, by the following vote:
AYES: COUNCIL MEMBERS — Hitchcock, Mann, Nakanishi, Pennino and
Land (Mayor)
NOES: COUNCIL MEMBERS — None
ABSENT: COUNCIL MEMBERS — None
ABSTAIN: COUNCIL MEMBERS — None
ALICE M. EIMCHE
City Clerk