HomeMy WebLinkAboutResolutions - No. 5940: 7-o-.7 02i1,,
355
RESOLUTION :0 . 593
RESOLVED, by the City Council of the City of Lodi .
That the plan and specifications this evening submitted
by ..:r ::. . ,curt, 0.e., consultin-- engineer of this City, and
t "; -,�_..+n n- i'T7 n T4eST TI r
entitled ��_�_ f.,A__0::3 FCR ...� l��i �-tCA`�A:!C..S AT _
DEZ SITE CF' _:13 'RC?OSED -J O-1LECTRIC DE7E1:07.1317 T CN THE
•Ce• T.. 2 A30 -VE ,U0 T �l THE C F n "
_:�r.�L,�__i:. RIVE A30 -VE LANCRA ?L.�:i3 FOR _� �I-'� OF L..DI be
and the same are hereby approved and adopted as the Plans and
specifications under .. nich said work shall be done;
BE I'T R•ESCLVED, also, that the City Clerk be and he is
hereby authorized and directed, to advertise in time, form and
Manner as required by law, for the reception by this Council
of sealed proposals or bids for performs ee saia work and
the _'-;rnisning the materials therefore, said bids to be +
returnable on or before 7 o'clock . of Monday, October 7th.
A.D.1929
-"r .rest advised the Council that the City's cause before
the Superior Court of _Ian Joaquin County wo_ila be materially
aided ty�t he obtaining of expert testimony re ra.rding the 'round
waters of the :`okelU.nne bas -.n particularly in interpreting
the reeorts of the S.Ceologi�•al Survey; he advised that the
services of :.:r 3.A.Etchiverry and :.:r Thomas H. Leans could
be obtained at a reasonable figure and reg n ended that they
both be retained for this purpose.
s:r Etchiverry and Mr Meanswere' retained as consulting
engineers and experts by the passage of Resolution No. 594
by the following vote
AYES: Councilmen, Shattuck ffeihe Hale Roach & Spooner
NCES: : Counei1 en, None. A_3SENT : Uounci Innen, None.
RESOLUTIO} NO. 594
WHEREAS, the City of Lodi has cameienced an action in the
Superior Court of the State of California in and for the County
of San Joaquin, against East Bay Municipal Utility District
and others for the purpose of restraining defendents therein
named from diverting waters from the Mokelumne River and for
the purpose of protecting the underground eater supply of said
City of Lodi;
MD WHEREAS, the City Council of the City of Lodi has rec-
eived a letter fran Thos. H. Means and B.A.Etchiverry, a cop -
of which is annexed hereto marked "Exhibit A" and made part here-
of; and whereas it is the desire of the said City Council to
its said Thos. H. Means and B.A.Etchiverry as engineers
for the purpose of raking a study of underground water conditions
in said City of Lodi and vicinity for the purpose of making the
necessary report or reports and evidence as referred to in said
letter;
NO THEREFORE, BE IT RESOLVED, that said City of Lodi does
hereby employ said Thos. H. Means and B. A. Etchiverry pursuant
to the terms and conditions set out in said letter, as its
engineers for the purpose of making a survey of the under-
ground grater conditions aryl of all available data and informat-
ion connected therewith and for the purpose of -making a report
r- or reports and furnishing the evidence as set out and contemplated
in said letter;
CE IT 'URTHER RESOLVED, that said Thos H. deans and B.A.
Etchiverry are hereby authorized for and on behalf of said City
to collect and analyze the information which has heretofore •
been collected and to determine the extent of new field work
which will be required as mentioned and contemplated in and by
iters number "1" and "2" on page one of said letter;
BE IT : UR "HER RESOLVED THAT SAID CITY pay said Thos. H:
Means and B. A. Etchiverry for making such preliminary study
of existing data and preliminary report the sun of One Thousand
Dollars and that the same be paid out of any moneys in the
Treasury of sais City which may be available for that purpose,
the sun of Five Hundred Dollars to be paid for Iiwith.as a
retainer and the balance , to -wit'; the sun of Five Hundred
Dollars, upon the presentation of said preliminary report.
BE IT-FIJR'HER RESOLVED, that z the Mayor of said Cityis
hereby ordered to draw a warrant upon the Treasury of the Cty
for the first payment of said Five Hundred Dollars and that the
same be paid out of any moneys available for that purpose.
Bim; IT FURTHER BISOLVr1J, that any further additional
work after said preliminary report shall have been completed
anbeddonesbytsaidnd as Thos.contemplated.Md 3.A.n d tchiverryd fortwhichshall
shall be paid at the rate of Seventy-five Dollars per day and they
expenses ror each of them based upon the time employed in
performing such additional work, no such additional work to be
done until the same be authorized and aaproved by City Attorney
Glenn lest and Mr Robert M. Searls, attorneys representing
said City in said suit
HIBIT A -
(attached to foregoing and made part thereof)
THOS. H. MEANS
Consulting y ineer
11 Suter Street
San Francisco
September 3,1929.
City Council, City of Lodi,
Lodi, California.
Gentlemen: -
At the request of Mr. Robert Y. Searls, Special Counsel
for your City, we submit the following concerning our employ-
ment in ;he litigation over the waters of the llokelumne River.
A great -deal of the information upon the subject has
been collected in recent years by the Federal Government and
agencies of the State of California. The most important thing
to be done is to collect and analyze this information for the
purpose of seeing :chat additional facts will be required in
he defense of the suits now pending and to prepare the avail-
able information for use in the trial.
Following this field work to collect additional inform-
ation may be necessary and further office studies may be requir-
ed to prepare testimony for trial. the amount of this sort of
work is v:ry difficult to estimate until there is an analysis
of the material already collected and available.
.ie believe ,he ollowing plan should be followed:
1. Collect and analyze the information which has here-
tofore been collected. •
2. From the above determine the extent of new field
work which will be required.
3. Carry on the additional field work.through your
engineering department. The direction of the work
should be in our hands so that we can use the facts
thus collected.
4. Make final preparation of the data to be presented in
court in defense of the City's rights.
5. Prepare and make available all•information collect-
ed which maybe useful to other litigants in the
defense of rights to the use of water in the vicinity
of Lodi.
le would expect the sum of $1,000.00 for the preliminary
study of the existing data as outlined under (1) above.
work following the preliminary report is difficult to
estimate as the amount of it cannot be known until the value of
the facts already collected has been determined by the prelimin-
ary study.
,7e believe that an additional sum of $2,000 will be
sufficient to cover the cost of our employment up to the time
the case goes to trial. ,e do not like to be limited to this
amount as the extent of work.to be done depends to agreat
extent upon the waythe information works out. If the occasion
for additional work arises it will be possible to predict the
amount and cost considerable time in advance so that sums may
be provided.
Under this plan all expenses of field -Work will be under
the City's engineering department and will be paid direct.