Loading...
HomeMy WebLinkAboutResolutions - No. 2010-139RESOLUTION NO. 2010-139 A RESOLUTION OF THE LODI CITY COUNCIL APPROVING CONTRACT CHANGE ORDERS NO. 1, NO.2 AND NO.3 AND APPROPRIATING ADDITIONAL FUNDS FOR LODI GRAPE BOWLALL-WEATHER SURFACE PROJECT WHEREAS, on April 7, 2010, City Council awarded a contract to Western Engineering Contractors, Inc., in the amount of $592,675 for the preparation of the Grape Bowl for the installation of the all-weather surface, including the clearing and grubbing of the existing field and the installation of new irrigation and storm drain systems. The appropriation for this contract included $87,325 for contingencies; and WHEREAS, Contract Change Order No. 1 includes field grooming equipment ($8,200.00); quick coupler installation modification ($2,400.30); electrical/water main work ($32,997.10); extra subgrade work ($21,800.00); irrigation system modification ($2,700.00); and field signage ($1,400.00), for a total cost of $69,497.40; and WHEREAS, Contract Change Order No. 2 includes concrete stairs, ramps, and railing ($80,193.40); concrete walks ($16,600.00); and disabled parking ($20,000.00), for a total of $116,793.40; and WHEREAS, Contract Change Order No. 3 includes the installation of an II -foot walkway ($48,612.00) and protective railing ($9,000.00), for a total of $57,612.00. NOW, THEREFORE, BE IT RESOLVED that the Lodi City Council does hereby approve Contract Change Orders No. 1, No. 2 and No. 3; and BE IT FURTHER RESOLVED that funds in the amount of $134,400 be appropriated from Parks Impact Mitigation Fees for this project. Dated: August 4, 2010 -------------------- -------------------- I hereby certify that Resolution No. 2010-139 was passed and adopted by the City Council of the City of Lodi in a regular meeting held August 4, 2010, by the following vote: AYES: COUNCIL MEMBERS— Hansen, Johnson, and Mayor Katzakian NOES: COUNCIL MEMBERS— Hitchcock ABSENT: COUNCIL MEMBERS— Mounce ABSTAIN: COUNCIL MEMBERS — None 5JOHL ity Clerk