HomeMy WebLinkAboutResolutions - No. 2010-139RESOLUTION NO. 2010-139
A RESOLUTION OF THE LODI CITY COUNCIL
APPROVING CONTRACT CHANGE ORDERS NO. 1,
NO.2 AND NO.3 AND APPROPRIATING ADDITIONAL
FUNDS FOR LODI GRAPE BOWLALL-WEATHER
SURFACE PROJECT
WHEREAS, on April 7, 2010, City Council awarded a contract to Western
Engineering Contractors, Inc., in the amount of $592,675 for the preparation of the
Grape Bowl for the installation of the all-weather surface, including the clearing and
grubbing of the existing field and the installation of new irrigation and storm drain
systems. The appropriation for this contract included $87,325 for contingencies; and
WHEREAS, Contract Change Order No. 1 includes field grooming equipment
($8,200.00); quick coupler installation modification ($2,400.30); electrical/water main
work ($32,997.10); extra subgrade work ($21,800.00); irrigation system modification
($2,700.00); and field signage ($1,400.00), for a total cost of $69,497.40; and
WHEREAS, Contract Change Order No. 2 includes concrete stairs, ramps, and
railing ($80,193.40); concrete walks ($16,600.00); and disabled parking ($20,000.00), for
a total of $116,793.40; and
WHEREAS, Contract Change Order No. 3 includes the installation of an II -foot
walkway ($48,612.00) and protective railing ($9,000.00), for a total of $57,612.00.
NOW, THEREFORE, BE IT RESOLVED that the Lodi City Council does hereby
approve Contract Change Orders No. 1, No. 2 and No. 3; and
BE IT FURTHER RESOLVED that funds in the amount of $134,400 be
appropriated from Parks Impact Mitigation Fees for this project.
Dated: August 4, 2010
--------------------
--------------------
I hereby certify that Resolution No. 2010-139 was passed and adopted by the
City Council of the City of Lodi in a regular meeting held August 4, 2010, by the following
vote:
AYES: COUNCIL MEMBERS— Hansen, Johnson, and Mayor Katzakian
NOES: COUNCIL MEMBERS— Hitchcock
ABSENT: COUNCIL MEMBERS— Mounce
ABSTAIN: COUNCIL MEMBERS — None
5JOHL
ity Clerk