COUNCIL• •
AGENDA TITLE: Authorize City Manager to Execute Professional Engineering Services Contract for
Design Work for Lower Sacramento Road Widening Project
MEETING DATE: April 7, 1999
PREPARED BY: Public Works Director
RECOMMENDED ACTION: That the City Council adopt the attached resolution authorizing the
City Manager to execute a professional engineering services contract,
and appropriate funds for the Lower Sacramento Road Widening Project.
BACKGROUND INFORMATION: At the request of City Council, Public Works Department staff has
made the Lower Sacramento Road Widening Project a priority
project. As discussed at the March 23, 1999 Shirtsleeve Session,
staff sent requests for proposals (RFP) to fifty civil engineering firms
in December 1998 and received eight proposals from various firms. Staff reviewed the proposals and
interviewed three engineering teams. The most qualified engineering team, Mark Thomas & Company, Inc.
(MT & Co.) was selected. The Sacramento firm will be using two local firms, Baumbach and Piazza, and
Kjeldson, Sinnock & Neudeck, Inc. for the design work. MT & Co. has designed several major projects,
including City of Stockton's Interstate 5 and March Lane Interchange Improvement Project, and
San Joaquin County's Special Purpose Plan for Lower Sacramento Road.
The project limits are from Turner Road to just south of Taylor Road. However, for purposes of this contract,
we have excluded the segment from just south of Taylor Road to Kettleman Lane since this area will be
included with an adjacent development project. The City's peak -hour and daily traffic counts will be updated
and San Joaquin County Council of Governments (COG) 2020 future projections and land -use assumptions
will be reviewed. MT & Co. will prepare alternative layouts showing the number of lanes, lane widths, and
various raised median/streetscape treatments. There will be median openings at all the signalized
intersections, and the traffic study will determine opening locations at non -signalized intersections. The
Lower Sacramento Road and Tokay Street intersection will also be evaluated to determine if a signal is
needed.
MT & Co. will host public workshops and arrange individual meetings with property owners who will be
most affected by this project. After the public workshops, MT & Co. will consolidate public and staff
comments and present City Council with a final layout. After City Council approval, MT & Co. will
proceed with the final design. Depending on right of way acquisitions, the plans and specifications
should be completed by spring 2000. The consultant has indicated the box culvert design can be done
prior to the entire project, and possibly under construction by the 1999/2000 winter months when the
canal is dry.
This project also includes the frontage road extension on the east side of Lower Sacramento Road south
of Tejon Street as an option to be included with the design work.
APPROVED:
H.'Dixon Flynn -- City anager
CDSGNSRVCS.DOC l J 03131199
Authorize City Manager to Execute Professional Engineering Services Contract for Design Work for
Lower Sacramento Road Widening Project
April 7, 1999
Page 2
The cost for professional engineering services for the traffic study and design work is $645,080. The
environmental documentation is not included, and, depending on the results of the traffic study, may be
done in-house.
Staff recommends City Council authorize the City Manager to execute the agreement with MT & Co. for
professional engineering services and appropriate funding for this project.
FUNDING: $322,540 Measure K funds
322,540 TDA funds
$645,080 TOTAL
Funding Available:
Vicky McAthie, Finance Director
4�LAN4
Richard C. Prima,
Public Works Director
Prepared by Paula J. Fernandez, Associate Traffic Engineer
RCP/PJF/Im
Attachment
cc: City Attorney
Transportation Manager
Associate Traffic Engineer
MT & Co.
SJCOG, Steve VandeBurg
CDSGNSRVCS.DOC
RESOLUTION NO. 99-56
A RESOLUTION OF THE LODI CITY COUNCIL APPROVING A
PROFESSIONAL ENGINEERING SERVICES CONTRACT WITH
MARK THOMAS & COMPANY FOR DESIGN WORK FOR LOWER
SACRAMENTO ROAD WIDENING PROJECT, AND FURTHER
APPROPRIATING FUNDS TO COVER THIS PROJECT
BE IT RESOLVED, that the Lodi City Council hereby approves a Professional
Services Contract with Mark Thomas & Company for Design work for Lower Sacramento
Road Widening Project; and
project:
BE IT FURTHER RESOLVED that funds be appropriated as follows to cover this
Measure K Funds $322,540
TDA Funds $322,540
$645,080
FURTHER RESOLVED, that the City Manager is hereby authorized to execute this
Contract on behalf of the City of Lodi.
Dated: April 7, 1999
I hereby certify that Resolution No. 99-56 was passed and adopted by the Lodi
City Council in a regular meeting held April 7, 1999 by the following vote:
AYES: COUNCIL MEMBERS — Hitchcock, Mann, Nakanishi, Pennino and
Land (Mayor)
NOES: COUNCIL MEMBERS — None
ABSENT: COUNCIL MEMBERS — None
ABSTAIN: COUNCIL MEMBERS — None
��
ALICE M. RE CHE
City Clerk
CITY COUNCIL
KEITH LAND, Mayor
STEPHEN J. MANN
Mayor Pro Tempore
SUSAN HITCHCOCK
ALAN S. NAKANISHI
PHILLIP A. PENNINO
CITY OF LODI
Mr. Timothy R. Fleming
Mark Thomas & Co. Inc
7300 Folsom Blvd., Ste. 203
Sacramento, CA 95826
CITY HALL, 221 WEST PINE STREET
P.O. BOX 3006
LODI, CALIFORNIA 95241-1910
(209) 333-6706
FAX (209) 333-6710
April 1, 1999
H. DIXON FLYNN
City Manager
ALICE M. REIMCHE
City Clerk
RANDALL A. HAYS
City Attorney
SUBJECT: Authorize City Manager to Execute Professional Engineering Services
Contract for Design Work for Lower Sacramento Road Widening Project
Enclosed is a copy of background information on an item on the City Council
agenda of Wednesday, April 7, 1999. The meeting will be held at 7 p.m. in the
City Council Chamber, Carnegie Forum, 305 West Pine Street.
This item is on the consent calendar and is usually not discussed unless a
Council Member requests discussion. The public is given an opportunity to address
items on the consent calendar at the appropriate time.
If you wish to write to the City Council, please address your letter to City Council,
City of Lodi, P. O. Box 3006, Lodi, California, 95241-1910. Be sure to allow time for the
mail. Or, you may hand -deliver the letter to City Hall, 221 West Pine Street.
If you wish to address the Council at the Council Meeting, be sure to fill out a speaker's
card (available at the Carnegie Forum immediately prior to the start of the meeting) and
give it to the City Clerk. If you have any questions about communicating with the
Council, please contact Alice Reimche, City Clerk, at (209) 333-6702.
If you have any questions about the item itself, please call Paula Fernandez, Associate
Traffic Engineer, at (209) 333-6800, ext. 667.
Richard C. Prima, Jr.
Public Works Director
RCPArn
Enclosure