Loading...
HomeMy WebLinkAboutAgenda Report - November 6, 1996 (87)COUNCIL • • AGENDA TITLE: Contract Award for Hutchins Street Square Conference and Performing Arts Center ($8,262,010) MEETING DATE: November 6, 1996 PREPARED BY: Public Works Director RECOMMENDED ACTION: That the City Council adopt the attached resolution awarding the contract for the above project to F & H Construction, of Stockton, in the amount of $8,262,010 and appropriate funds in accordance with the recommendation shown below. BACKGROUND INFORMATION: This project consists of furnishing all labor, materials, tax, equipment, and A recap of the bids, including the bid alternates, is attached as Exhibit A. Portions of the project have been deferred to meet the construction funding available and other items will be furnished by the Hutchins Street Square Foundation (see Exhibit B). The architectural firm and City staff have also done 'value engineering" throughout the design process and will continue to look, along with the contractor, at ways to most cost effectively complete the project. Bid Alternate 2, a single -ply membrane roofing system, is recommended in addition to the base bid. FUNDING: From the $10 million Certificates of Participation (COP), issued July 22, 1996, and anticipated construction fund interest earnings, as outlined in Exhibit B. Requested Appropriation: 121.0-350.70 Appropriate balance of COP proceeds per Finance Director Project Estimate: $10,050,000 Bid Opening Date: October 17, 199 Jac L. Ronsko is Works Director Prepared by Dennis J. Callahan, Building and Equipment Maintenance Superintendent Attachments cc: City Attorney Community Center Director Purchasing Officer Building and Equipment Maintenance Superintendent Finance Director Construction Manager APPROVED: CAWARD.DOC H. bixon Flynn -- Cfty Manager 10130/96 services necessary for the construction and completion of the remodel of the existing multipurpose and theater buildings in accordance with the plans and specifications for the project. Plans and specifications for this project were approved on October 4, 1995. The City received the following six bids for this project: Bidder Location Base Bid Engineer's Estimate (9/4/96) $7,425,400 F & H Construction Stockton $8,262,000 P. W. Construction, Inc. Upland $8,348,948 Allen L. Bender, Inc. West Sacramento $8,475,171 Charles H. Bloom Co. Stockton $8,490,000 Acme Construction Modesto $8,570,000 John F. Otto, Inc. Sacramento $8,590,000 A recap of the bids, including the bid alternates, is attached as Exhibit A. Portions of the project have been deferred to meet the construction funding available and other items will be furnished by the Hutchins Street Square Foundation (see Exhibit B). The architectural firm and City staff have also done 'value engineering" throughout the design process and will continue to look, along with the contractor, at ways to most cost effectively complete the project. Bid Alternate 2, a single -ply membrane roofing system, is recommended in addition to the base bid. FUNDING: From the $10 million Certificates of Participation (COP), issued July 22, 1996, and anticipated construction fund interest earnings, as outlined in Exhibit B. Requested Appropriation: 121.0-350.70 Appropriate balance of COP proceeds per Finance Director Project Estimate: $10,050,000 Bid Opening Date: October 17, 199 Jac L. Ronsko is Works Director Prepared by Dennis J. Callahan, Building and Equipment Maintenance Superintendent Attachments cc: City Attorney Community Center Director Purchasing Officer Building and Equipment Maintenance Superintendent Finance Director Construction Manager APPROVED: CAWARD.DOC H. bixon Flynn -- Cfty Manager 10130/96 CITY OF LODI Public Works Department Tabulation of bids received October 17,1996 PROJECT: HUTCHINS STREET SQUARE CONFERENCE AND PERFORMING ARTS CENTER Item Description 1 Remodel Existing Theater, Multi-purpose and Associated Buildings BID ALTERNATES Provide all Labor. Materials to Construct Port Cochere as 1 Described in the Drawings and Specifications In Lieu of Built-up Roof System, Provide Single -ply Roofing System 2 as Specified in Section 7532 for the Conference and Performing Arts Buildings In Lieu of Prefinished Metal Roofing at the Rotunda Roof, Provide 3 20 oz. Standing Seam Copper Roofing System. Provide Rotunda Cap in Copper Material as Detailed on k/a 29. Provide Additional (48) Dual 2.4 kw Theatrical Lighting Dimmer 4 Modules. All Dimmer Racks Provided in Base Specifications. Reference Section 11064. Replace (4) Hand Winch Operated Theatrical Rigging General 5 Purpose Battens with (4) Motorized Shaft Driven Dead Haul General Purpose Battens and Controls. Reference Section 11061. Item Description 1 Remodel Existing Theater. Multi-purpose and Associated Buildings BID ALTERNATES 1 Provide all Labor. Materials to Construct Port Cochere as Described in the Drawings and Specifications In Lieu of Built-up Roof System. Provide Single -ply Roofing System 2 as Specified in Section 7532 for the Conference and Performing Arts Buildings In Lieu of Prefinished Metal Roofing at the Rotunda Roof, Provide 3 20 oz. Standing Seam Copper Roofing System Provide Rotunda Cap in Copper Material as Detailed on k/a 29. Provide Additional (48) Dual 2.4 kw Theatrical Lighting Dimmer 4 Modules. All Dimmer Racks Provided in Base Specifications. Reference Section 11064. Replace (4) Hand Winch Operated Theatrical Rigging General 5 Purpose Battens with (4) Motorized Shaft Driven Dead Haul General Purpose Battens and Controls. Reference Section 11061 1 LS Engineer's Estimate F&H CONSTRUCTION PW CONSTRUCTION ALLEN L. BENDER INC. 6.05500 6,055.001 i 25.702.00 Stockton, CA Upland, Ca W. Sacramento, CA City Unit Price Total Price Total Price Total Price Total 1 LS $7,425.400.00 $7,425.400.00 $8.262.000.00 $8,262,000.00 j $8,348.948.00 $8,348,948.00 $8.475.171.00 $8,475,171.00 1 LS 112,168.00 112,168.00 110,000.00 110.000.00 70.124.00 70.12400 111,320.00 111,320.00 1 LS 20.957.00 20.957.00 10.00 10.00 4,329.00 4.329.00 ; (9.999.00) (9,999.00)! 1 LS 13.749.00 13.749.00 126,000.00 I ACME CONSTRUCTION CO. 26.000.00 I 6.05500 6,055.001 i 25.702.00 25,702.00 1 LS 15.825.00 15.825.00 13 500.00 13.500.00 13 744.00 I 13.744.00 1 10,646.00 10.646.00 1 LS 7596000 75.960 00 88 000 00 86 000 00 56.491 00 56.491.00 51 507 00 51.50700 Page 1 of 1 CHAS. H. BLOOM ACME CONSTRUCTION CO. JOHN F. OTTO, INC. Stockton, CA Modesto, CA Sacramento, CA Qty Unit Price Total Price Total Price Total 1 LS 58.490.000.00 S8.490 000 00 58.570.000 00 $8.570.000 00 S8.590.000.00 58.590.000.00 1 LS 131.000.00 131000 00 100.000.00 100.000.00: 120 000.00 120.000.00 1 LS 0.00 000 : 0.00 0.00 000 0.00 j 1 LS 10.000.00 10,000.00 25.000.00 25,000.00 I 19.000.00 19.00000 1 LS 15,000.00 15.000.00: 9.700,00 I 9,700.00 j 11,000 00 11.000.00 I 1 LS 50.000.00 50.000 00 85,000.00 85, 000.00 I 50.000 00 50.000.00 Page 1 of 1 Exhibit B Hutchins Street Square - Conferencing/Performing Arts Center Cost Summary Subtotal: $ 8,212,000 $ 8,348,000 A/E Fee 616,400 616,400 Const. Contingency 634,100 498,100 6% insufficient for this project Misc. (asbestos, testing, misc) 137,500 137,500 portion w/const. CPAC Subtotal: $ 1,388,000 $ 1,252,000 Total Construction: $ 9,600,000 $ Addtional funding available: $ Total Contingency Amount: $ 9,600,000 450,000 Construction fund interest 948,100 11.5% adequate for this project Perfart$ 10/30/96 Estimated Costs for Financing Plan Bid Prices Item 4/96 10/17/96 Demo/Asbestos in const. CPAC $ - SE Parking Lot 60,000 85,000 Construct CPAC 7,003,000 8,262,000 Plaza/Landscape 410,000 - defer SW Parking 60,000 - defer Site Fence 75,000 - defer Chairs/Drapes/Shell/Lights 427,000 to be furnished by the Foundation Hutchins frontage 52,000 - do w/street project Amphitheater 125,000 - defer Subtotal: $ 8,212,000 $ 8,348,000 A/E Fee 616,400 616,400 Const. Contingency 634,100 498,100 6% insufficient for this project Misc. (asbestos, testing, misc) 137,500 137,500 portion w/const. CPAC Subtotal: $ 1,388,000 $ 1,252,000 Total Construction: $ 9,600,000 $ Addtional funding available: $ Total Contingency Amount: $ 9,600,000 450,000 Construction fund interest 948,100 11.5% adequate for this project Perfart$ 10/30/96 RESOLUTION NO. 96-158 A RESOLUTION OF THE LODI CITY COUNCIL AWARDING THE BID FOR HUTCHINS STREET SQUARE CONFERENCE & PERFORMING ARTS CENTER - -------------------------------------------------------------------- -------------------------------------------------------------------- WHEREAS, in answer to notice duly published in accordance with law and the order of this City Council sealed bids were received and publicly opened on October 17, 1996 at 2:00 p.m. for the bid for Hutchins Street Square Conference and Performing Arts Center, described in the specifications therefore approved by the City Council on October 4, 1995; and WHEREAS, said bids have been compared, checked, and tabulated and a report thereof filed with the City Manager as follows: Bidder Base Bid Engineers Estimate (9!4196) $7.425.400.00 F & H Construction Stockton $8,262,000.00 P. W. Construction, Inc. Upland $8,348,948.00 Allen L. Bender, Inc. West Sacramento $8,475,171.00 Charles H. Bloom Co. Stockton $8,490,000.00 Acme Construction Modesto $8,570,000.00 John F. Otto, Inc. Sacramento $8,590,000.00 WHEREAS, the City Manager recommends award of the bid for Hutchins Street Square Conference and Performing Arts Center, be made to the low bidder, F & H Construction of Stockton, CA and NOW, THEREFORE, BE IT RESOLVED by the Lodi City Council that the award of the bid for Hutchins Street Square Conference and Performing Arts Center, be and the same is hereby awarded to F & H Construction of Stockton, CA, the low bidder, in the amount of $8,262,010 as shown on Exhibit A attached hereto; and BE IT FURTHER RESOLVED that funds be appropriated from the $10 million Certificates of Participation (COP) issued July 22, 1996, an anticipated construction fund interest earnings, as outlined in Exhibit B attached. Dated: November 6, 1996 I hereby certify that Resolution No. 96-158 was passed and adopted by the City Council of the City of Lodi in a regular meeting held November 6, 1996 by the following vote: AYES: COUNCIL MEMBERS - Davenport, Mann, Pennino, Sieglock and Warner (Mayor) NOES: COUNCIL MEMBERS - None ABSENT: COUNCIL MEMBERS - None ABSTAIN: COUNCIL MEMBERS - None u N ER M1. ? RIc�tN C ty C rk 96-158 CITY COUNCIL DAVID P. WARNER, Mayor PHILLIP A. PENNING Mayor Pro Tempore RAY C. DAVENPORT STEPHEN J. MANN JACK A. SIECLOCK F & H Construction 4945 Waterloo Rd. Stockton, CA 95215 CITY OF LODI CITY HALL, 221 WEST PINE STREET P.O. BOX 3006 LODI, CALIFORNIA 95241-1910 (209) 333-6706 FAX (209) 333-6710 November 1, 1996 H. DIXON FLYNN City Manager JENNIFER M. PERRIN City Clerk RANDALL A. HAYS City Attorney PW Construction, Inc. 1126 W. Foothill Blvd., Ste. 250 Upland, CA 91768-3768 SUBJECT: Contract Award for Hutchins Street Square Conference and Performing Arts Center ($8,262,010) Enclosed is a copy of background information on an item on the City Council agenda of Wednesday, November 6, 1996, at 7 p.m. The meeting will be held in the City Council Chamber, Carnegie Forum, 305 West Pine Street. This item is on the consent calendar and is usually not discussed unless a Council Member requests discussion. The public is given an opportunity to address items on the consent calendar at the appropriate time. If you wish to write to the City Council, please address your letter to City Council, City of Lodi, P. O. Box 3006, Lodi, California, 95241-1910. Be sure to allow time for the mail. Or, you may hand -deliver the letter to the City Clerk at 221 West Pine Street. If you wish to address the Council at the Council meeting, be sure to fill out a speaker's card (available at the Carnegie Forum immediately prior to the start of the meeting) and give it to the City Clerk. If you have any questions about communicating with the Council, please contact Jennifer Perrin, City Clerk, at (209) 333-6702. If you have any questions about the item itself, please call Dennis Callahan at (209) 333-6800, ext. 690, or Gary Wiman at (209) 333-6800, ext. 593. 'j" t . Jack L. Ronsko Public Works Director JLR/Inn Enclosure cc: City Clerk NCAWARD.DOC