Loading...
HomeMy WebLinkAboutResolutions - No. 2009-157RESOLUTION NO. 2009-157 A RESOLUTION OF THE LODI CITY COUNCIL APPROVING THE PLANNING DIVISION HOURLY RATE AND SETTING VARIOUS FIRE CODE RELATED FEES WHEREAS, the Lodi Municipal Code requires the City Council to set fees for various services provided by the City of Lodi to recover the costs associated with providing specific services and programs. NOW, THEREFORE, BE IT RESOLVED that the City Council finds as follows: 1. That the Planning Division hourly rate of $132.00 per hour attached hereto as Exhibit A, is approved; and 2. That the Fire Code related permitlinspection fees attached hereto as Exhibit B, are approved; and 3. All resolutions or parts of resolutions in conflict herewith are repealed insofar as such conflict may exist; and 4. This resolution shall be published one time in the "Lodi News -Sentinel," a daily newspaper of general circulation printed and published in the City of Lodi. and shall be in force and take effect on December 4, 2009, which date is at least thirty (30) days after the passage of this Resolution. Dated: November4, 2009 I hereby certify that Resolution No. 2009-157 was passed and adopted by the City Council of the City of Lodi in a regular meeting held November4, 2009, by the following vote: AYES: COUNCIL MEMBERS— Hitchcock. Johnson, Katzakian, and Mayor Hansen NOES: COUNCIL MEMBERS— None ABSENT: COUNCIL MEMBERS — Mounce ABSTAIN: COUNCIL MEMBERS— None City Clerk 2009-157 EXHIBIT A 2009110 Planning Division Hourly Rate Direct hourly rate $ 78.90 Internal overhead hourly rate $ 15.90 External overhead hourly rate $ 19.87 Planning Division Hourly Rate $ 114.68 15% reserve $ 17.20 Total Rounded $ 132.00 Direct Cost Planning Staff 142,228 Supplies/Materials 41,775 184,003 Billable hours 2332 IfittiatAliaty tiate 71W. Internal Overhead Cost Planning Commision (100%) 3,400 Administrative Secretary (40%) 33,680 37,080 Billable hours 2332 Internal overhead hourly rate 15.90 External Overhead Cost Allocated Costs 2009 Revision 46,344 Billable hours 2332 gttlettaIi OVert*attiickttiy New Developmentand Tenant Improvements Plans Review Fee Site Planning Annexation Land Use Lot Line Adjustments Parcel Map SPARC Zoning Variance Subdivision/Lot Splits 1 - 4 Lots 5-24Lots 25 or more Lots 150+ 150+ 150+ 150+ 150+ 150+ 150 300 450 Fire & Life Safety Plans Review and Inspections Fire Review of Building Construction Add 25% to building plan check 8 permitfee Certificate of Occupancy (Fire) 75+ 135+ Fire Protection Equipment Plans Review and lnspecfions Civil Improvement Site Plan (no underground inspection) 4504-270+ Compressed Gas System (each) Hazardous Materials 3 675+ Medical Gas 450+-810+ Fire Alarm System 459* -810+ Fire Alarm System for Fire Sprinkler Moniter300*-540+ Fire Flow/Hydrant Test 450+ 270+ Fire Pump 990+-1620+ Fire Sprinkler (per riser) 1 - 6 Heads 225 405 7 -19 Heads 375 675 20 - 99 Heads G 1350 100 -199 Heads 11050 1890 >= 200 Heads (plus 0.50 per head) 4,35G 2430 Halon/Clean Agent System 4810+ Hood & Dud Fire Suppression System*(each)000+540+ *hood requires separate building permit Plan Maintenance Fee*Add �o- 10% to plan check fee *compressed gas systems, fire alarm system, alarm system for sprinkler monitor, fire pump, fire sprinkler system, halon/ clean agent system, hood 8 duct suppression system, spray booth, standpipe/ hose stations Smoke Management Systems 7-50+ 1350+ Spray Booth (each) 44124-8 10+ Standpipe/Hose Stations 4504-270+ Miscellaneous Development Fee Administrative Charge Design Review Consultation/Conference 75+ Minimum Intake Fee (not otherwise specified) T5 135 Second and Subsequent Plan Revision Submittals (each) 150 270 Temporary Certificate of Occupancy 150 Special Plan Review Request After Hours 225'405+ Not Otherwise Specified 150+270+ Cancellation—< 24 hours notice, not ready, no show 7-5-135 Technical Report/Alternate Materials or Methods* *per code item plus consultantfee plus 20% admin fee 450+-270+ Annual Fire and Life Safety Inspections State Mandated Inspections E-3 Occupancies—Day Care 7 - 49 clients 150+ 50 -149 clients 187.50+ >= 150 clients 225+ Pre -inspection <= 25 clients 50 Pre -inspections 25 clients 100 Occupancies—Institution 1-1 or 12 occupancies < 6 patients 150+ 1-1 or 1-2 occupancies 6 patients 225+ 1-3 occupancies (detention) no charge R-1 Occupancies—Apartments/Hotels/Motels 3 - 16 units 112.50+ 17 - 32 units 150+ >tt 33 units 187.50+ R-2 Occupancies -Residential Care Facilities >= 7 residents 225+ Pre -inspection < 25 residents 50 Pre -inspection >= 26 residents 100 R-3 Occupancies—Large Family Day Care 7 -14 clients 75+ Pre -inspection 50 R-6 Occupancies—Halfway Houses, etc. >= 7 residents 225+ Pre -inspection< 25 residents 50 Pre -inspection >= 26 residents 100 Business Fire & Life Safety Inspections Fire Company Business Inspection Initial plus 1 re -inspect no charge Additional re -inspections (each) 75+ Fee Miscellaneous Charges Administrative Charge Appeals (Fire Chief denies application) 250 Environmental Impact Report Document Search 75+ Other Activities Not Listed 74+-135+ Refund Processing 37.50 67.50 Weed Abatement (per parcel) 150+ Emergency Response (per company) Hazardous Materials 131+ False Alarms—2 or fewer per calendar year no charge Third False Alarm 75 Fourth False Alarm 150 Fifth and Subsequent (each) 393 Contact not at scene in 60 minutes 131 Failureto notify LFD of test 131 Fire investigations (per person) 75+ Fire Reports and Other Documents (per page) 0.25 Investigation—No Construction Permit 75+ Occupancy Load Calculation 75+ Photograph Reproduction(per print) Actual cost plus 20% admin fee Standby (per person) 75+ Standard Hourly Rate LFD Personnel 75 Engine or Truck Company 131 + Minimum Fee, actual cost may vary Fees based on $75 $135 per hour (in quarter-hour increments) EXHIBIT B