Loading...
HomeMy WebLinkAboutAgenda Report - July 17, 1996 (62)AGENDA TITLE: Contract Change Orders for Civic Center Improvements (Phase II), City Hall Remodel MEETING DATE: July 17, 1996 PREPARED BY: Public Works Director RECOMMENDED ACTION: This item is for information only. No action is required. BACKGROUND INFORMATION: In accordance with the Contract Change Order Policy adopted by Resolution 85-173, change orders over an aggregate total of $25,000 are approved by the City Manager and reported to the City Council at its regular meeting. The attached summary shows change orders that have been approved for the Civic Center Improvements (Phase II), City Hall Remodel project since the May 1, 1996 Council meeting. The original contract for this project was $1,853,310. The total cost of all change orders to date is $206,071, or approximately 11 percent of the contract. The project is now 99.8 percent complete and offices temporarily located in the Carnegie Forum and trailers are back in City Hall. The attached list showing descriptions of the change orders is very brief; however, detailed below is a more complete description of the work involved in the change orders over $1,500. More detailed descriptions and backup information for all of the change orders are available in the Public Works office. Chance Order No. 89 - The automatic door openers at the front entrance were originally to be part of the Entry/Plaza Renovation contract. Because of the timing of the plaza contract and the power needed to be supplied by the building contract, it was more expeditious to delete it from that project and add it to the building contract. ($6,722) Change Order No. 90 - In order to accommodate the mounting of lights in the basement, the soffit details had to be modified. ($1,800) Chance Order No. 92 - The smoke detectors required by the Building Code were not included in the specifications for the remodel project. ($6,128) Chance Order No. 93 - The existing handicap ramp at the vestibule on the north side of the building did not meet current ADA requirements so it had to be modified. This modification was not included in the specifications for the project. ($7,486) Change Order No. 94 - This change order added trim to the new windows in the mahogany paneled offices to hide the joint which was exposed with the replacement of the old windows. ($2,674) Change Order No. 98 - This change order added jambs and casings to the second floor doorways which have no doors. ($2,061) There are a few more changes orders still being negotiated with the contractor. These will be completed shortly. FUNDING: There are sufficient funds budgeted in the Civic Center improvement (Phase II), City Hail Remodel account to cover these change orders. 4�� o Jack L. Ronsko Public Works Director Prepared by Sharon Blaufus, Administrative Assistant Attachment cc: Building and Equipment Maintenance Superintendent Contract Construction Inspector APPROVED:_— H. Dixon Flynn -- Citynager CCC04_DOC 07/08/96 Sheetl Page 1 SUMMARY OF CONTRACT CHANGE ORDERS CIVIC CENTER IMPROVEMENTS, PHASE II Change Order Number Description Add Deduct Total Contract ORIGINAL CONTRACT $1,853,310 CHANGE ORDERS TO DATE $179,367 ($1,879) 177.488 Total $2,030,798 89 AUTOMATIC DOOR OPENERS Q FRONT ENTRY $6,722 $2,037,520 90 BASEMENT SOFFIT DETAILS $1,800 $2,039,320 91 WIRE SUMP PUMP @ EAST STAIRS $749 $2,040,069 92 ADD SMOKE DETECTORS $6,128 $2,046,197 93 MODIFY HANDICAP RAMP Q NORTH ENTRANC $7,486 $2,053,683 94 ADD TRIM Q PANELED OFFICE WINDOWS $2,674 $2,056,357 95 HEADER C DOOR 18 $692 $2,057,049 96 LOWER 1ST FLOOR CEILING TO ACCOMMODATE DUCT $132 $2,057,181 97 CHANGE SWING @ DOOR 12 $140 $2,057,321 98 ADD DOOR JAMB/CASING ON 2ND FLOOR $2,061 $2,059,382 99 HANDRAILS 0, EAST INTERIOR STAIRS $885 $2,060,267 100 DELETE REFRIGERATOR IN ADMINISTRATION ($550) $2,059,717 101 RELOCATE JOB TRAILER TO ACCOMMODATE LANDSCAPING $643 $2,060,360 102 DELETE HVAC COMPUTER (1,300) $2,059,060 103 FIRE SPRINKLER TAMPER SWITCH $321 $2,059,381 subtotal $30,433 ($1,850) TOTALS $209,800 $3,729 2,059,381 Page 1