Loading...
HomeMy WebLinkAboutResolutions - No. 2007-67RESOLUTION NO. 2007-67 A RESOLUTION OF THE LODI CITY COUNCIL CERTIFYING THE NEGATIVE DECLARATION AND AUTHORIZING CITY MANAGER TO EXECUTE CONTRACTS FOR CONSTRUCTION, TESTING AND INSPECTION, AND CONSTRUCTION ADMINISTRATION FOR WHITE SLOUGH WATER POLLUTION CONTROL FACILITY PHASE 3 IMPROVEMENTS PROJECT, AND TO FURTHER ADJUST EXISTING APPROPRIATIONS WHEREAS, the City has made substantial progress on the State -mandated improvements at the White Slough Water Pollution Control Facility. Phase 1—Interim Aeration Improvements and miscellaneous electrical and earthwork improvements were completed in 2003; and WHEREAS, Phase 2 — Year 2004 Improvements Project, which was completed in 2006, included the installation of tertiary filters, UV disinfection equipment, additional aeration improvements, emergency generator, and associated electrical and mechanical facilities; and WHEREAS, the Phase 3 project includes the construction of an additional secondary clarifier, an additional digester, aeration basins, headworks modifications, minor administration building modifications, and associated electrical, mechanical, utility, site preparation, and demolition work. The improvements to the secondary process are necessary to meet current and anticipated State of California regulatory requirements and improve treatment process reliability; and WHEREAS, City staff and consultants prepared an initial Study/Proposed Negative Declaration to review and assess potential impacts, which was reviewed by various agencies with no comments received, published and the City posted its intent to issue a Negative Declaration for the required 30 -day period, from January 30, 2007 through March 1, 2007; and WHEREAS, following the environmental review of the project, it was determined that there were no significant environmental impacts that could not be adequately mitigated and staff therefore recommends that the City Council certify the filing of a Negative Declaration as adequate environmental documentation for the White Slough Water Pollution Control Facility Phase 3 Improvements Project; and WHEREAS, in answer to notice duly published in accordance with law and the order of this City Council, sealed bids were received and publicly opened on March 15, 2007, at 11:00 a.m., for the White Slough Water Pollution Control Facility Phase 3 Improvements Project, described in the specifications therefore approved by the City Council on January 17, 2007; and WHEREAS, said bids have been compared, checked, and tabulated and a report thereof filed with the City Manager as follows: Bidder Location Bid Engineer's Estimate $23,000,000 Western Water Constructors, Inc. Santa Rosa $16,387,000 C. W. Roen Construction Danville $17,472,000 Pacific Mechanical Corp. Concord $18,021,000 WHEREAS, staff recommends award of the contract for White Slough Water Pollution Control Facility Phase 3 Improvements Project to Western Water Constructors, Inc., of Santa Rosa, California, in the amount of $16,387,000; and " WHEREAS, staff recommends award of a time and materials contract for testing,.and inspection services to Krazan & Associates, who performed the work for Phase 1 and 2 of this project; and WHEREAS, three proposals were received for the environmental survey work as follows: LSA $2,000 Krazan & Associates $3,200 SWCA Environmental Consultants $3,310 WHEREAS, staff recommends award of the contract for the environmental survey work to LSA & Associates in the amount of $2,000; and WHEREAS, staff recommends award of a time and materials contract with West Yost & Associates to perform the construction administration services. As the Design Engineer for this project, West Yost is ideally suited to perform these duties; and WHEREAS, staff recommends reallocating existing appropriations listed below to the White Slough Water Pollution Control Facility Phase 3 Improvements Project: ProiectlTask Balance (rounded) Notes Phase 1 Design $ 144,000 Completed Value Engineering $ 19,000 Completed Ca aci Fee Update $ 8,000 Completed Standby Power Design $ 11,000 Completed Phase 2 Improvements $ 1,301,000 Completed Phase 3 Design $ 1,600,000 Completed (double bud eted Land Acquisition $ 5,000,000 Project on hold/defer Wetland $ 5,000,000 Project on hold/defer Alternative Discharge Stud $ 212,000 Completed Bishop Cut Flow Monitoring 26,000 Completed Total: $13,321,000 WHEREAS, the total project estimate for Phase 3 is $20,600,000, which includes: prepurchased equipment, construction administration services, environmental survey, construction contract, testing and inspection contract, construction contingencies, and other project -associated expenses. NOW, THEREFORE, THE LODI CITY COUNCIL HEREBY FINDS AS FOLLOWS: 1) That the City Council has reviewed all documentation and hereby certifies the filing of a Negative Declaration as adequate environmental documentation for the White Slough Water Pollution Control Facility Phase 3 Improvements Project; and 2 2) That the City Council hereby awards the contract for White Slough Water Pollution Control Facility Phase 3 Improvements Project to Western Water Constructors, Inc., of Santa Rosa, California, in the amount of $16,387,000; and 3) That the City Council hereby awards a time and materials contract for testing and inspection services to Krazan & Associates; and 4) That the City Council hereby awards a contract for the environmental survey work to LSA & Associates in the amount of $2,000; and 5) That the City Council hereby awards a time and materials contract for the performance of construction administration services to West Yost & Associates for this project; and 6) That the City Council hereby reallocates existing appropriations listed below to the White Slough Water Pollution Control Facility Phase 3 Improvements Project: Pro'ect/Task Balance !rounded) Notes Phase 1 Design $ 144,000 Completed Value Engineering $ 19,000 Completed Capacity Fee Update $ 8,000 Completed Standby Power Design $ 11,000 Completed Phase 2 Im rovements $ 1,301,000 Completed Phase 3 Design $ 1,600,000 Completed (double budgeted) Land Acquisition $ 5,000,000 Project on hold/deter Wetland $ 5,000 000 Project on hold/defer Alternative Discharge Stud $ 212,000 Completed Bishop Cut Flow Monitoring 26,000 Completed Total: $13,321,000 Dated: April 10, 2007 hereby certify that Resolution No. 2007-67 was passed and adopted by the City Council of the City of Lodi in a special meeting held April 10, 2007, by the following vote: AYES: COUNCIL MEMBERS — Hansen, Hitchcock, Katzakian, and Mayor Johnson NOES: COUNCIL MEMBERS — None ABSENT: COUNCIL MEMBERS — Mounce ABSTAIN: COUNCIL MEMBERS -- None (2�_ RANDI JOHL City Clerk 2007-67 3