RESOLUTION NO. 2007-52
A RESOLUTION OF THE LODI CITY COUNCIL ESTABLISHING
AN AREA OF BENEFIT AND REIMBURSABLE COSTS FOR
LOWER SACRAMENTO ROAD (KETTLEMAN LANE TO
HARNEY LANE) IMPROVEMENTS
WHEREAS, as part of the City's Lower Sacramento Road (Kettleman Lane to Harney
Lane) project and San Joaquin County's Harney Curve project, more than $902,905 in public
improvements were constructed that benefit the adjacent parcels and would be required to be
installed at the time of development of those parcels. To recover those costs, staff recommends
formation of an Area of Benefit pursuant to Lodi Municipal Code (LMC) §16.40.030, as shown
on Exhibit A and Exhibit B attached; and
WHEREAS, generally, the improvements included the installation of water, sewer, storm
drain, traffic signal, and dry utility conduits that are not required for the roadway project, but
were installed to avoid trenching in the new roadway in the future; and
WHEREAS, pursuant to LMC Section 16.40.030, the costs of improvements installed by
the City that benefit adjacent properties and would be required of the properties upon
development are reimbursable to the City, as shown in Exhibit C attached.
NOW, THEREFORE, BE IT RESOLVED by the Lodi City Council that:
a) The City Council hereby establishes an Area of Benefit as shown on Exhibit A.
b) A summary by category of reimbursable improvements for each parcel is
provided in Exhibit B. This exhibit also provides an explanation of how the
benefit was determined for each category.
C) The reimbursable costs for each of the benefiting properties have been
calculated and are shown in Exhibit C. The total reimbursement to the City is
calculated to be $902,905.
d) Payment of reimbursement costs will be a condition of approval for any future
complete applications for entitlements, including development plans,
development agreements, tentative subdivision maps, lot line adjustments, and
final maps for the benefiting parcel groups. For payment collection purposes,
some of the benefiting parcels have been segregated into the following groups as
shown on Exhibit B:
1. Lodi Shopping Center $ 81,748
2. Olive Drive Group $ 44,480
3. Peterson Group $108,397
4. Southwest Gateway Group $596,004
Total reimbursement costs for all parcels within a given group will be payable at
the time of City Council approval of a subdivision map within each group and the
amount collected would be prorated based upon the area of the subdivision map.
e) Pursuant to LMC Section 15.64.080, the reimbursable amount will be adjusted
annually to include an amount attributable to interest, which will be based on the
change in the Engineering News Record (ENR) 20 Cities Construction Cost
Index from January 1, 2006 to January 1st of the year of reimbursement. The
beginning ENR index is 7660.
f) In conformance with LMC 16.40, the City Council has conducted a public hearing
and hereby establishes an Area of Benefit and Reimbursable Costs to recover
the cost of improvements constructed with the Lower Sacramento Road
(Kettleman Lane to Harney Lane) project that benefit adjacent properties.
Dated: March 21, 2007
I hereby certify that Resolution No. 2007-52 was passed and adopted by the Lodi City
Council in a regular meeting held March 21, 2007, by the following vote:
AYES: COUNCIL MEMBERS — Hansen, Hitchcock, Katzakian, Mounce, and
Mayor Johnson
NOES: COUNCIL MEMBERS — None
ABSENT: COUNCIL MEMBERS — None
ABSTAIN: COUNCIL MEMBERS — None
v�
a i J6F9
City Clerk
...... .... 1
� r
00. .fht�ty
=ftsirli
2007-52
Exhibit B
Summary of Lower Sacramento Road Reimbursements by Parcel
The Lower Sacramento Road Widening Project consisted of reconstructing approximately
6,500 feet of roadway generally between Kettleman Lane and Harney Lane and
Century Boulevard between Sylvan Lane and Lower Sacramento Road. Three contracts were
awarded, two by the City of Lodi and one by San Joaquin County. They consisted of the
Lower Sacramento Road Widening Project (City), Century Boulevard Construct Project (City)
and the Harney Curve Project (County).
The Harney Lane work consisted of removing the old County roadway and reconstructing a new
wider roadway in the approximate same horizontal and vertical location. Right of way was
obtained from the adjacent landowners that would accommodate the full future widening of the
roadway. Dedication of the rights of way was generally traded for the roadway improvements.
Storm drainage facilities were installed to convey runoff from the new roadway to the adjacent
storm drainage basin. Existing overhead PG&E distribution lines, ATT phone lines, and Comcast
cable lines were relocated to the ultimate future location as allowed by the right of way
dedications.
At the time the planning and design studies took place, there was no evidence that development
of the adjacent vacant parcels would occur any time in the near future. At the time of
construction, the City was processing applications for development. Recognizing the City's
preference not to open trench across new streets and the cost savings of constructing utilities
crossing the roadway during a full closure condition, it was determined that many of the future
utilities required to serve the new development could and should be installed concurrently with
the construction of the roadway improvements.
The following provides a property -specific description of the facilities constructed and the cost
share methodology for determining the fair share costs assignment to the property.
Lodi Shopping Center
Site 1: BDC Lodi III/APN 058-030-13
8 -inch Sanitary Sewer Service: 54 feet of pipe was constructed at an existing manhole providing
for a future sanitary sewer service to the site. Another 38 feet of pipe was constructed and a
manhole installed for the connection to provide for a future sanitary sewer connection to the site.
Costs for the pipe and one-half of the manhole is allocated to the site at a price of $18,570.
10 -inch Water Main: 496 feet of pipe was constructed along the frontage of the site. Half of the
cost or 248 feet is allocated to this site for a cost of $12,152.
10 -inch Water Valve and Service Stub: Two 10 -inch service stubs with a valve at the main were
installed along with -86 and 105 feet of 10 -inch water pipe extended to the site. The total cost was
$13,'789.
Lodi Electric Utility Conduit Crossing: A gang of (1) 2 -inch conduit, (1) 4 -inch conduit, and
(3) 6 -inch conduits was installed across the street (101.5 feet) at the southerly driveway for future
underground phone, television and electrical power to the site. One half of the cost is allocated to
the site at a price of $4,573.
K:IWPIDEV_SERV\CCSetPHAreaofBenefitLwrSac—ExBlevued.doc 1
Future Traffic Signal Conduit: One conduit each of size 2 -inch and 4 -inch were installed the
100 feet across the street. The full cost of $2,390 is allocated to the site.
Design Changes to accommodate the future Lodi Shopping Center Driveway with turn pockets
and the traffic signal were completed by Mark Thomas and Company. One-third of the cost is
allocated to the site at a price of $18,150.
Interim Safety and Traffic Control: In order to prohibit traffic from using the left -turn pockets at
the future driveway location, K -rail and delineators were installed at a cost of $4,692.
With ten percent added for Engineering and Administration, the total reimbursable cost is
$81,748.
Southwest Gateway Group
Site 2: Van Ruiten/APN 058-030-03
Industrial Waste (30 -inch) Realignment: The manhole and stub (27 feet) required for the
realignment of the Industrial Waste Trunkline at the north side of the site is required for the new
development. The cost of these facilities is $7,810.
Domestic Waste (21 -inch) Realignment: The manhole and stub (38 feet) required for the
realignment of the Domestic Waste Trunkline at the north side of the site is required for the new
development. The cost of these facilities is $12,030.
Domestic Waste (42 -inch) Realignment. The pipe segment at Century Boulevard across
Lower Sacramento Road is required for the realignment that is driven by the new development.
The cost of the 218 feet of pipe is $85,020.
Storm Drainage Outfall (I -Basin to G-Basin/Outfall): The 48 -inch pipe segment at
Century Boulevard across Lower Sacramento Road is the outfall line from I -Basin to the WID
Terminal Drainage. The cost of the 242 feet of pipe is $49,610.
10 -inch Water Main: The combined frontage width is 492 feet and 492 feet of water pipe was
constructed along the frontage of the site. Half of the cost or 246 feet is allocated to this site for a
cost of $12,054.
10 -inch Water Valve and Service Stub: Two 10 -inch service stubs with a valve at the main were
installed along with 74 and 131 feet of 10 -inch water pipe extended to the site. The total cost was
$14,475.
Lodi Electric Utility Conduit Crossing: At the south side of Century Boulevard, a 132 -foot
conduit crossing of Lower Sacramento Road was constructed with (2) 2 -inch conduits, (2) 4 -inch
conduits, and (2) 6 -inch conduits. Half of the cost of this crossing was assigned to Site 2. In
addition, an 86 -foot conduit crossing of Century Boulevard on the west side of Lower Sacramento
Road was constructed with (1) 2 -inch conduit, (2) 4 -inch conduits, and (2) 6 -inch conduits. The
cost of this crossing was assigned to Site 2. The total cost for the two conduit crossings is
$13,730.20.
48 -inch Storm Drain (Century Boulevard): The storm drain outlet piping for I -Basin was
constructed in the correct location with the Lower Sacramento Road and Century Boulevard
K:IWPIDEV SERvlccsetPHA..fa..r.tLwrsw-ExB-mvm&&c 2
projects. The total length of pipe was 447 feet and Site 2 was assigned half of the cost. The cost
of this piping was $86,817.50.
Traffic Signal at Century Boulevard: The traffic signal at this location was assigned one-quarter
to each of the adjoining large parcel sites. The cost of the traffic signal attributed to Site 2 is
$38,325.00.
With ten percent added for Engineering and Administration, the total reimbursable cost is
$351,281.
Site 3: Van R 'ten/APN 05$-030-04
10 -inch Water Main: The combined frontage width is 90 feet and 90 feet of water pipe was
constructed along the frontage of the site. Half of the cost or 45 feet is allocated to this site for a
cost of $4,410.
Lodi Electric Utility Conduit Crossing: A 97 -foot conduit crossing of Lower Sacramento Road
was constructed with (3) 2 -inch conduits and (2) 4 -inch conduits for future underground phone,
television and electrical power to the site. One half of the cost is allocated to Site 3 and one half
to Site 21 at a price of $4,910 each.
With ten percent added for Engineering and Administration, the total reimbursable cost is
$10,252.
Site 4: Van Ruiten/APN 058-030-05
10 -inch Water Main: The frontage width is 660 feet and 660 feet of water pipe was constructed
along the frontage of the site. Half of the cost or 330 feet is allocated to this site for a cost of
$16,170.
Water Valves and Service Stubs: One 6 -inch service stub with a 6 -inch valve at the main was
installed along with 70 feet of 6 -inch water pipe extended to the site. One 10 -inch service stub
with a 10 -inch valve at the main and 74 feet of 10 -inch pipe were installed. The total cost was
$9,993.50.
With ten percent added for Engineering and Administration, the total reimbursable cost is
$27,562.
Site 6: Sebumacber/APN 058-040-01
10 -inch Water Valve and Service Stub: One 10 -inch service stub with a valve at the main was
installed along with a 68 feet of 10 -inch water pipe extended to the site. The total cost was
$5,547.
Lodi Electric Utility Conduit Crossing: A 107 -foot conduit crossing of Lower Sacramento Road
was constructed with (2) 2 -inch conduits and (1) 4 -inch conduit for future underground phone,
television and electrical power to the site. One half of the cost is allocated to Site 6 and one half
to the park site at a price of $3,309 each.
K:NWP%DEV_SERVI--CSetPHArcaotBenefitLwrSac_jExB_jeviseddoc 3
Traffic Signal at Century Boulevard: The traffic signal at this location was assigned one-quarter
to each of the adjoining large parcel sites. The cost of the traffic signal attributed to Site 2 is
$38,325.
With ten percent added for Engineering and Administration, the total reimbursable cost is
$147,398.
Site 7: Schumacher/APN 058-040-02
10 -inch Water Valve and Service Stub: One 10 -inch service stub with a valve at the main was
installed along with 72 feet of 10 -inch water pipe extended to the site. The total cost was $5,743.
Lodi Electric Utility Conduit Crossing: A 124 -foot conduit crossing of Lower Sacramento Road
was constructed with (2) 2 -inch conduits and (1) 4 -inch conduit for future underground phone,
television and electrical power to the site. One half of the cost is allocated to Site 7 and one half
to the Vintage Oaks subdivision at a price of $3,844 each.
With ten percent added for Engineering and Administration, the total reimbursable cost is
$10,546.
Site 8: Schumacher/APN 058-040-04
10 -inch Water Main: The frontage width is 317 feet and 317 feet of 10 -inch water pipe was
constructed along the frontage of the site. Half of the cost or 158 feet and half of the cost of the
inline 10 -inch valve is allocated to this site for a cost of $8,849.50.
8 -inch Water Valve and Service Stub. One 8 -inch service stub with a valve at the main was
installed along with 62 feet of 8 -inch water pipe extended to the site. The total cost was $4,095.
Lodi Electric Utility Conduit Crossing: A 119 -foot conduit crossing of Lower Sacramento Road
was constructed with (2) 2 -inch conduits and (1) 4 -inch conduit for future underground phone,
television and electrical power to the site. One half of the cost is allocated to Site 8 and one half
to the City at a price of $3,697 each.
With ten percent added for Engineering and Administration, the total reimbursable cost is
$18,306.
Site 9: Schumacher/APN 058-040-05
10 -inch Water Main (City Project): The frontage width is 167 feet and 167 feet of 10 -inch water
pipe was constructed along the frontage of the site. Half of the cost or 84 feet and half of the cost
of the inline 10 -inch valve is allocated to this site for a cost of $5,223.50.
10 -inch Water Main (County Project): Water main was installed on Lower Sacramento Road and
Harney Lane in lengths of 326 feet and 66 feet, respectively. Half of the cost or 163 feet and 33
feet and half of the cost of the inline 10 -inch valve is allocated to this site for a cost of $15,337.
Lodi Electric Utility Conduit Crossing: One crossing of Lower Sacramento Road [2 -inch (2),
4 -inch (1), 6 -inch (2)] and one crossing of Harney Lane [2 -inch (2), 4 -inch (1), 6 -inch (1)] were
installed. Half of the cost of each is allocated to this site for a cost of $7,312.
K;NWP\DEV_SERV\CCSetPHArcaoiBenefitLwrsae-Fim- viw dm 4
With ten percent added for Engineering and Administration, the total reimbursable cost is
$30,660.
Site 23: P tersonlAPN 058-140-52
10 -inch Water Main: The frontage width is 666 feet and 666 feet of water pipe was constructed
along the frontage of the site. Half of the cost or 333 feet is allocated to this site for a cost of
$16,317.
Traffic Signal at Century Boulevard: The traffic signal at this location was assigned one-quarter
to each of the adjoining large parcel sites. The cost of the traffic signal attributed to Site 23 is
$38,325.
Lodi Electric Utility Conduit Crossing: A 150 -foot conduit crossing of Century Boulevard was
constructed with (1) 2 -inch conduit, (1) 4 -inch conduit and (3) 6 -inch conduits for future
underground phone, television and electrical power to the site. The whole cost is allocated to
Site 23 at a price of $11,550.
With ten percent added for Engineering and Administration, the total reimbursable cost is
$72,811.
Site 22: Peterson/APN 058-140-14
10 -inch Water Main: The frontage width is 84 feet and 84 feet of water pipe was constructed
along the frontage of the site. Half of the cost or 42 feet is allocated to this site for a cost of
$2,058.
Lodi Electric Utility Conduit Crossing: A 101.5 -foot conduit crossing of Lower Sacramento Road
was constructed with (1) 2 -inch conduits, (1) 4 -inch conduit and (3) 6 -inch conduits for future
underground phone, television and electrical power to the site. One half of the cost is allocated to
Site 1 and one half to Site 22 at a price of $4,573 each.
With ten percent added for Engineering and Administration, the total reimbursable cost is 7,294.
Site 21: Peterson/APN 058-140-12
10 -inch Water Main: The frontage width is 662 feet and 662 feet of water pipe was constructed
along the frontage of the site. Half of the cost or 331 feet is allocated to this site for a cost of
$16,219.
Water Valves and Service Stubs: One 6 -inch service stub with a 6 -inch valve at the main was
installed along with 16 feet of water pipe extended to the site. One 10 -inch service stub
consisting of 15 feet of 10 -inch pipe was installed. The total cost was $6,257.
Lodi Electric Utility Conduit Crossing: A 97 -foot conduit crossing of Lower Sacramento Road
was constructed with (3) 2 -inch conduits and (2) 4 -inch conduits for future underground phone,
television and electrical power to the site. One half of the cost is allocated to Site 3 and one half
to Site 21 at a price of $4,910 each.
With ten percent added for Engineering and Administration, the total reimbursable cost is 28,292.
K:IWPIDEV_SERV\CCSetPHArewfBenefitLwrSsc_ExB—rcviwA.&c 5
Olive Drive Group
Sites 13 through 20
The group of parcels is combined and the fair share cost assigned to each individual parcel is
based upon acreage. The total acreage of the area is 6.13 acres.
10 -inch Water Main: The frontage width is 778 feet and 778 feet of water pipe was constructed
along the frontage of the site. Half of the cost or 389 feet is allocated to this site for a cost of
$19,061.
8 -inch Water Valve and Service: 11 feet of pipe was constructed and a new valve installed to
provide service to the site. The total cost was $2,310.
8 -inch Sanitary Sewer Service: 54 feet of pipe was constructed at a new manhole providing for a
future sanitary sewer service to the site. A manhole was installed and half the cost was assigned
to this site for a total of $11,540.
18 -inch Storm Drain Service: 31 feet of pipe was constructed at a new manhole providing for a
future storm drain service to the site. A manhole was installed and the whole cost was assigned
to this site because it was the only connection to the manhole. The total cost was $7,525.
With ten percent added for Engineering and Administration, the total reimbursable cost is
$44,480.
Harney Lane (East of Lower Sacramento Road)
Site 10: Havn/APN 058-070-07
10 -inch Water Main: The frontage width is 206 feet and 206 feet of water pipe was constructed
along the frontage of the site. Half of the cost or 103 feet is allocated to this site for a cost of
$7,416. With ten percent added for Engineering and Administration, the total reimbursable cost
is $8,158.
Site 11 Bell/APN 058-070-08
10 -inch Water Main: The frontage width is 206 feet and 206 feet of water pipe was constructed
along the frontage of the site. Half of the cost or 103 feet is allocated to this site for a cost of
$7,416. With ten percent added for Engineering and Administration, the total reimbursable cost
is $8,158.
Site 12 Woods/APN 058-070-09
10 -inch Water Main: The frontage width is 206 feet and 206 feet of water pipe was constructed
along the frontage of the site. Half of the cost or 103 feet is allocated to this site for a cost of
$7,416. With ten percent added for Engineering and Administration, the total reimbursable cost
is $8,158.
K:%WP\DEv_SERVICCSetPHA=ofBenefitLwr8w—FXB—miw&&c 6
Site 24 Galindo/ N 058-2 0-06
10 -inch Water Main: The frontage width is 66 feet and 66 feet of water pipe was constructed
along the frontage of the site. Half of the cost or 33 feet is allocated to this site for a cost of
$2,376. With ten percent added for Engineering and Administration, the total reimbursable cost
is $2,614.
Site 25 Stice/APN 058-230-07
10 -inch Water Main: The frontage width is 66 feet and 66 feet of water pipe was constructed
along the frontage of the site. Half of the cost or 33 feet is allocated to this site for a cost of
$2,376. With ten percent added for Engineering and Administration, the total reimbursable cost
is $2,614.
Site 26 Sanchez/APN 058-230-08
10 -inch Water Main: The frontage width is 66 feet and 66 feet of water pipe was constructed
along the frontage of the site. Half of the cost or 33 feet is allocated to this site for a cost of
$2,376. With ten percent added for Engineering and Administration, the total reimbursable cost
is $2,614.
Site 27 S doval/ N 058-230-09
10 -inch Water Main: The frontage width is 66 feet and 66 feet of water pipe was constructed
along the frontage of the site. Half of the cost or 33 feet is allocated to this site for a cost of
$2,376. With ten percent added for Engineering and Administration, the total reimbursable cost
is $2,614.
Site 28: SchumacherlAPN 058.230-10
10 -inch Water Main (County Project): Water main was installed on Lower Sacramento Road and
Harney Lane in lengths of 326 feet and 380 feet, respectively. Half of the cost or 163 feet and
190 feet and half of the cost of the inline 10 -inch valve is allocated to this site for a cost of
$26,641.
Lodi Electric Utility Conduit Crossing: One crossing of Lower Sacramento Road [2 -inch (2),
4 -inch (1), 6 -inch (2)] and one crossing of Harney Lane [2 -inch (2),4 -inch (1), 6 -inch (1)] were
installed. Half of the cost of each is allocated to this site for a cost of $7,312.
With ten percent added for Engineering and Administration, the total reimbursable cost is
$37,348.
K.\WPDEV SERV\CCSetPHAm.fBenefi[L.Sac—F,xB—mvised.dm 7
City of Lodi Lower Sacramento Road (Kettleman Lane to Harney Laney EXHIBIT C
Pudic Works Dept
Reimbursable Costs
ITEM
No.
DESCRIPTION
UNIT QUANTITY Unit Price
BDC Lad III
SAe No. 1 056-030-13
OAntlty Tolet
Ven Rdtsn
She No. 3 058430-04
Duan' Told
Ven Rdtm
She No. 2 058430.03
Que Tote!
Van Ruiten
Site W. 4 058430-05
Omnlr Total
Hmvwd Inveshnents
Site No. 5 058-030-6
Qaar84 Tate)
Snhumedter
Site No. 8 05804401
Quan' Total
LOWER SAC ROAD CONSTRUCTION PROTECT
1
84NCH ITARY SEWS PIPE
IF
140
185.00
92
17,020.
0.00
0,00
0.00
0.00
0.00
2
21•INCN SANITARY SEWER PIPE
LF
38 f
235.00
0.00
0.00
38
5,930.00
0.00
0.00
0,00
3
424NCN SANITARY SEWER PIPE
LF
218
380.00
0.00
0.00
218
85,020
0.00
0.00
D.00
4
184NCH STORM DRAIN PIPE
LF
51 f
125,00
0.00
0.00
0.00
0.00
0.00
0.00
5
s4NCH STORM DRAIN PIPE
LF
242 E
205.00
0.00
0.00
242
49610,
0.00
0.00
0.00
6
30 -INCH INDUSTRIAL WASTE PIPE
LF
21
15530
0.00
0.00
27
4,185.DO
0.00
0.00
0.00
7
PIPE MARKERS
EA
23
200 .00
0.00
0.00
0.00
0.00
0,00
0.00
8
SIDE INLET CATCH BASIN
EA
17 f
95000
0.00
0.00
0.
0.00
0.00
0.00
9
STORM DRAIN MANHOLE
EA
14
3,650.00
0.00
0.00
0,00
0.00
0.00
0.00
10
SANITARY SEWER MANHOLE
EA
3
3.100.00
0.5
1.550.00
0.00
2
B .00
0.
0.
0.00
11
INDUSTRIAL WASTE MANHOLE
EA
1
3 6.00
0.00
0.00
0.00
0.00
0.00
0.00
12
104NCH WATER PIPE
LF
2 910 f
49.00
43
21,511
B0
4 410.
451
22 099.
404
19,7%
0.00
68
3,332.00
13
&INCH WATER PIPE
LF
1t0 f
35.00
0.00
030
0.00
0.00
0.00
0.00
14
LOCH WATER PIPE
LF
190 f
28.00
0.00
0,
0.00
70
1 820.00
0.00
0.00
15
24MCH WATER PIPE
EA
3 f
2,625.00
0.00
0.00
0.00
0.00
0.00
0.00
16
TEMPORARY BLOW -OFF
EA
14
1,150.00
0.00
0.00
0,
0.00
0.00
0.00
17
WATER VALVE 10•INCH
EA
16
2 15.00U1522,684..
0.00
2
4430.00
1
2 15.00
0.00
1
2 215.
16
WATER VALVE B -INCH
FA
5
1 5.00
0.00
6,00
0.00
0.
0.00
19
ATERVALVE&INCH
EA
2 $
1 5.00
0.00
0.00
1
1225.
0.
D.
20
IRE HYDRANT ASSEMBLY
EA
2
3 .DD
0.00
0.00
0.
0.00
0.00
21
IT2-I4CNI CROSSINGS
LF
1,810 S
23.00146
3,358.
132
3,036.
0.00
0.00
107
2481.
22
GONIIXJIT-INC.H CRO88NVO8
LF
812 f
183047
1,552,
132
2112.
0.00
0.00
53
848.
23
CONDUIT 6 PICH CROSSINGS
LF
572 f
1740
0.00
132
244.
0.00
0.00
0.00
24
TRAFFICSKINAL SYSTEM CENTURY BLVD
LS
I f 153 300.00
D.
0.25
38 325.
O.DO
0.00
0.25
38 3225
SK3NAL MODIFICATIONS AT KETTLEMAIILOWER SAC
LS
1
12000.00
0.00
0.
0.00
0.00
0.00
25
ADD CONOUIT CROSSINGS PER EUD REQUEST
LS
1 $
20,278.20
0.
0.00
030
0.00
0.06
G.
CONDUIT 2' CROSSING
LF
336
9.50
100
450.00
0.00
86
81 TOD
0.00
030
0.00
R 4' CROSSING
LF
092
14.40
IDD
1,440
0.00
172
2,478.60
0.00
0.00
0.00
CONDUIT G CROSSING
LF
822
17.70
0.00
0.00
172
3,044.40
0.00
0.00
0.00
CHANGES FUTURE TS 91KETTLEMAN
LS
1
55000.00
0.33
18,150.
030
Soo
0.00
0.00
0.00
R27DESIGN
MTCO AMF.9WMENT#3 Cia COS %55000
0.00
030
0.00
0.00
0.00
0.00
AM $TEPHENS K-RAiL RENTAL
LSf1
500.00
1
t 500.00
0.
0.00
0.00
0.00
0.00
GEORGE REED INSTALL DELNEATORS
LS
3,142,38
1
3182.36
0.001
0.
0.00
030
0.00
0.01
0.001
0.00
0.00
0.00
040
NARNEY CURVE PROJECT
0.00
0.00
0.00
O.DD
Coo
0.00
1
1(rWATER PIPE
LF
1.160 f
72.00
0.00
0.00
0.00
O.DO
0001)
0.00
2
10' WATER VALVE
EA
5 3
2,450.00
0.00
0.00
0.00
0.D0
0.00
0.00
3
4" BLOW OFF
EA
2 S
2,100.00
0.00
0.00
0.00
0.D0
0.00
0.00
4
EUD CONDUIT CROSSINGS LSR@KARNEY
0.00
0.00
0.00
030
0.00
WEST CROSSING HAR 70IF iM COST
LB
1 f
4,875.00
0.00
0.00
0.00
0.00
0.00
EAST CROSSING HARN 70 LF 1!4 COST
LS
1 f
4.675.06
0.
0.00
0.
0.00
0.00
NORTH CROSSING LSR 120 LF 112 COST
LS
1
9,749.00
0.00
0.00
0.00
0.000.00
0.
0.00
FIDDO
0.00CENTURY
BLVD CONSTRUCTION PROJECT
0.00
0.00
0.00
0.001
48' STORM DRAIN PIPE
LF
847
205.00
0.00
0,00
423.5
88 817.50
0.00
423.5
09 817.5
TOTAL, CONITUUCTION COSTS
S
7 316.]8
9320
f
31! .70
5086.00
f
f 183 .50
10%ENGINEERINO l.ADMINIBTRATION
S
7,431.64
932.60
f
31113067
S
2509.90
f
13,1".85
TOTAL REIMBURSABLE COMI
I
1
81 748.02
f 1021200
f
351 51.37
I 3
27 1.W I
is
f 147 398,35
K:SWP\3EV_SERV1caPHAreaol8enefiLLmSac_Reimbur&WAsCasls.zlsTotai Project 1 319/2007
City of Lodi Lower Sacramento Road (KoWeman Lane to Harney Lana) EXHIBIT C
Public Works Dept
Reimbursable Caste
ITEM
No.
DESCRIPTION
UNIT QUANTITY UNI Rice
Sd� medmr
Sib Na. 7 058,040-02
Qaee Tetal
Som
Silo No. B
-
mcher
058-096-04
ToW
Sclwnacher
She No. 9 058-01005
O"Ity law
Stlwrngc►ier
Site Na. 28 058-230-10
OuWfily ToW QLAM
Ku6olr
058-230-04
Tr.W
Po[erwn
SM No. 23 058.14052
awrof TO
LOWER SAC ROAD CONSTRUCTION PROJECT
PAIO
1
54MCK SAMMARY SEWER PIPE
LF
146
185.00
0.00
0-00
0.00
0.00
0.00
2
214NCH SANITARY SEWER PIPE
LF
38
235.00
0.00
ODD
0.00
0.00
S
0.00
3
424NCH SANrrARY SEWER PIPE
LF
218 $
390.00
0.00
O.00
0.00
0.00
S
0.00
4
184NCH STORM DRAIN PIPE
LF
51 $
125.00
0.00
0.00
0.00
0.00
S -
0.
5
48 4NCH STORM DRAIN PIPE
LF
242 S
205.00
0.00
0.00
0.
O.OD
S -
0.
8
304NCH INDUSTRIAL WASTE PIPE
LF
27 i
155.00
0.00
0.00
0.00
0.00
f
0.00
7
PIPE MARKERS
EA
23 f
200.00
0.00
0.00
0.00
0.00
$
0.00
8
SIDE INLET CATCH BASIN
EA
17 f
96D.00
0.00
O.
0.00
0.00
f
0.00
9
STORM DRAIN MANHOLE
EA
14
3850.00
0.00
0.
0.00
0.
0.00
10
SANITARY SEWER MANHOLE
EA
3 S
3100.00
0.00
0.00
0.00
0.
S -
0.00
11
INDUSTRAL WASTE MANHOLE
EA
1 f
3 825.00
0.00
0.00
0.00
0.00
$ -
0.00
12
104NCH WATER PIPE
LF
2,910
49.00
72
3528.
158,
7742.00
84
4113.
0.
S -
333 18,317.
13
TER PIPE
LF
110
35.00
0.00
32
2170.00
0.
0.00
S
0.00
14
TER PIPE
LF
190
26.00
0.
0.00
0.00
0.00
f
ODD
15
TER PIPE
EA
3
2 825.00
0.00
0.00
0.00
0.00
0.00
16
RY BLOW-0FF
EA
14 $
1,150.00
0.00
0.
0.00
0.00
f
0.00
17LVE
UERE10.NCH
EA
13 S
2215.00
1
2 215.
0.5
1,107.50
0.5
1 107.
0.
i8LVE
&MCH
EA
5 S
1,925.00
0.00
1
119
ALVE B-MICH
EA
2
1 .00
0.
0.00
0.
000
S
0.007ASSEMBLY
EA
2
3,050.00
0.
0.00
0.
0.00
S -
0.00212
-INCH CROSSINGS
LF
1.81 $
23.00
121
2862.00
11
2,737.00
0.00
0.00
L
0.00
22
canourr 44NCH CROSSINGS
LF
912
13.00
62
992.
so
930.
0.90
0.00
S
0.00
23
CONDUIT 64 4CH CROSSINGS
LF
$72 S
17.00
0.00
0.
0.00
O.DO
f
0.00
24
TRAFFIC SiCri4AL SYSTEM -MTURY BLVD
LS
1
153 300.00
0.00
D.
0.00
0.
S -
0.25 38.325.
25
SIGNAL i.IOOIFICATIONS AT KETLEMNILOWER SAC
L3
1
12000.00
0.00
0.00
0.00
OAO
$ -
0.00
28
CONDUIT CROSSINGS PER EUD REQUEST
U3
1 f
20 78.20
0.
0.00
0.
0,00
; -
0.00
CONDUIT 2' CROSSING
LF
335 S
9.50
0.00
0.00
0.00
0.00
$
1 1425.00
CONDUIT 4"CROSSING
LF
M2
14.40
0.00
0.00
0.00
0.00
S
1 2150.00
U5WD--VIT e"CRossING
LP
622 S
17.70
0.6D
0.
O.DO
0.00
7935.
27
DESIGN CHANCES FUTURE TS SMETTLEMAN
LS
1
65.000.00
0.00
0.
0.00
0.00
0.00
MTCG AMENDMENT *3 V3 COs x 66 000
0.00
0.Do
AM STEPHENS K -RAIL RENTAL
LS
1,500.00
0.
0.00
0.00
0.00
0.00
GEORGE REED INSTALL DELINEATORS
L5
S
3.192.38
0.
0.00
C
0.00
0.00
0.00
0.00
0.
0.00
0.00
HARNEY CURVE PROJECT
0.00
0.00
0.00
0.00
S
0.00
1
10' WATER PIPE
LF
1.160 f
72.00
0.00
0.
186
14 112.00
353 25,416.
S
0.00
2
10' WATER VALVE
EA
5 S
2.450.00
0.00
0.
0.5
1
0.5 1.225.
$
0.00
3
' BLOW OFF
EA
2 $
2,100.00
D.00
0.00
0.00
O.
S
0.00
4
E IT CROSSINGS EY
0.00
0.00
0.00
0.00
-
0.00
WEST CROSSING 70 LF 1N COST
LS
1 f
4,875.00
0.
0.00
0.5
2,437.
0.5 2,437.
$
0.00
EAST CROSSING HARN 70 LF 1K COST
LS
1 f
4,075.00
0.00
0.00
0.00
0,00
$
DAO
NORTH CROSSING LSR 120 LF (1 12)
LS
1
9,749.01)
0.00
0.00
0.5
4,4L4,90
0.5 4874.50
f
0.00
0.00
0.00
0.00
0.00
0.00
CENTURY BLVD CONSTRUC71O11 PROJECT
0.00
0.
0.00
0.
S
0.00
1
48' STORM DRAIN PIPE
LF
847 S
205.00
0,00
0.
0.00
0.
S
0.00
TOTAL CONSTRUCTION COSTS
S
.4O
f 4 130
f
27 7290
f 33 AS
f
",192.1 0
10% ENGINEERING i ADMINISTRATION
956.70
f 1664.16
2,78725!
f f
f /619.20
TOTAL IMMURSABLE COSTS
10 .70
f 1 306.45
959.75
f 37
11.3
K:IWP\DEV_SERV=PHAreaoiBendtLvrSec__Reirnbr®bieC err.idaToW Preled 2 319P2007
City of LOCH Lower Sacramento Road (Ketdeman Lane to Harney Lane) EXHIBIT C
Public Works Dept
Reimbursable Coats
ITEM
No.
DESCRIPTION
UNIT QUANTITY
Pelson
Sita No. 21 058,114101-112
Peterson
Site No. 22 OSS -140.14
Hannan
She No. 15 058-140-06
AmWable
Site No. f 9 058-14o-10
Frame
S71s No. 13 058-14044
Ramauri
No. 14 058.540-05
Urrl Rice OLMAlty Tod Quariety Trial Quentity W Qua Tale) Oua Total
Qua To101
LOWER SAC ROAD CONSTRUCTION PROJECT
14.88%
5.87%
18.80%
23.98%
I
is-INCH SANITARY SEWER PIPE
LF
140
T 185.D0
0.00
0.00
0.00
GAD
0.00
0.00
2
214NCH aMNA Y SEWER PIPE
LF
38 $
235.DO
0.00
OM00
0.00
0.00
0.00
0.00
3
424INCH SANITARY SEWER PIPE
LF
218 $
390.00
0.00
0.00
0.00
OAO
O.DO
0.00
4
klSm4NCH STORM DRAIN PIPE
LF
51
125.00
0.
0.00
0.00
0.00
0.DO
0.00
5
4&mcN STORM ORA1H PIPE
LF
242 $
205.00
O.OD
0.00
0.00
0.00
O.
0.00
8
30•INCH 91pU37RVi WASTE PIPE
LF
27 S
155.00
0.00
7
PIPE MARKERS
EA
23 $
200.00
0.00
0.0.00
0.
0.00
0.00
S
siDEINLET CATCH BASIN
EA
17 $
950.00
0.00
0,0.00
0.00
0.00
0.009
STORMDRAIN MLANHOLE
EA
14
3850.00
0.00
0.0.00
0.00
0.00
OMW
10
SANITARY SEWER MANHOLE
EA
3
3100.OQ
0.00
0.0.00
0.00
0,00
0.00
11
INDUSTRIAL WASTE MANHOLE
EA
5 S
3525.00
0.00
C0.00
0.00
0.00
0.00
12
S64NCHWATER PIPE
LF
2910 $
49.00
346
18954.
42
2.058.0.
0.00
0.00
0,00
53
&INCFI WATER PIPE
LF
110 $
35.00
0.
0.0.00
0.00
0.00
0.00
14
WATER PIPE
LF
190 $
20.00
16
410.
0.0.00
0.00
0.
O,W
15
24MCH WATER PIPE
EA
3 $
2 025.00
0.00
0.1).00
r
0.00
000
0.00
10
TEMPOPARY BLOW -OFF
EA
14
5 150.00
O.OD
0.0.00
b.
0.00
0.00
WATERVALVE IDINCH
EA
10 S
2 15.00
1
2 11&
0.0.00
0.WATER
VALVE a -INCH
EA
5 $
1,925.00
COD
0.0.00
ODD
ORO
OM00
ATERVALVE64NCH
EA
2 ;
1 5.00
1
5
0.0.
0.00
0.000.IRE
HYDRANT �SS='�Y
EA
2
3050.00
0.
0.0.
0.00
0.00
0.01)
&NCH CROSSINGS
LF
1,810 $
23.00
f48
3358.
51
1,173.0.00
0.00
0.00
0.01)
F23
CONDUIT 44NCH CROSSINW
LF
912
18.00
97
1552.
51
$16.0.00
0.00
0.00
0.00
CONDUrT8414CH CROSSMGS
LF
572 $
57.00
0.
152
2,564.OA0
0.00
MOD
0.00
TRAFFIC SIGNAL SYSTEM ZENTORY BLVD
LS
1 S 153 300.00
COO
0.0.00
0.
0.
0.00
SIGNAL MODIFICATiONSAT I¢TYLEMAWLOWER SAC
LS
1
12000.00
ODD
0.0.00
0.
0.
0.00
ADD CONDUIT CROSSINGS PER ELM REQUEST
LS
1 $
20,278.20
0.00
0.00
0.00
DmO01
OmDD
a.Ob
CONDUIT 2'CROSSNG
LF
336
9.50
0,00
DAO
0,00
BMW
MOD
GmOD
CONDUIT 4' CROSSING
LF
442 $
14.40
0.00
0.00
0MOD
0.00
OM00
OmOD
CONDUIT S'CROSSNG
LF
622
17.70
0.00
0.00
0moo
0.00
OM00
0.00
27
DESIGN CHANGES FUTURE TS SAMTTLEMAN
LS
1 $
55 000.00
GM00
Coal
11.00
0.00
0.00
0.00
MTOO AMENDMENT 0341/3 %55000
&DO
0.00
0M00
0.00
0.00
0.00
AM STEPHENS i -RAIL RENTAL
LS
1500.00
O.
DmOO
GM001
OM00
OAO
0.00
GEORGE REED INSTALL DELINEATORS
LS
3 182.38
ODD
0.
0.00
O.
0.00
0.00
ODD
O.
0.00
O.
O.
0.00
HARNEY CURVE PROJECT
0.00
OAO
0.00
0.
0.00
5
1a'WATER PIfE
LF
1,1 S
72.00
O.OD
0.00
0.
O.
MOO
2
10'WATER VALVE
EA
5
24;0.00
0.00
0.00
0.
0.00
0.00
EA
2 $
2 100.00
0.00
0.00
0.
0.00
OAO
ROSSINGS LSR EY
0.00
0.1)0
0.00
OAO
No,
0.00
O HARNE 70 LF IM COST
LS
4 S
4,875.00
0.00
0.D0
O.OD
0.00
COO
70 LF SM CO8T
LS
1 $
4.875.00
0.00
0.00
D.OD
0.00
0.00
120 LF 11 COST
LS
1 $
9,749.00
0.
D.OD
0.00
COO
ODD
ON
0.
0.
0,00
0.
OADY
BLVD CONSTRUCTION PROJECT
0.00
0.00
O.
O.
0.00
IN PIPE
LF
847 $
21)5.00
0.00
03)0
0.00
0.00
0,
0.00
TOTAL CONSTRUCTION COSTS
$
25 720.00
;
e O;1A0
;38.77
16 7,374.71
; $ 7;4.30
$ S .72
1096 ENONE18tNG $, ADMINISTRATION
$
.00
!88.50
I $ 393.tltl 1
1 ; Z37A71
1 4979A3
1; 9tl9J37
TOTAL REIMBURSABLE COSTS
;
28,MmOO
S
7,224,110 1
IS30.45 1
1 ; 2,912mlB
7 73.73 1
1$ 50 .40
K1WPMEV SERV=PHAr.woendkLwr5ac_Remb+se6MCoeL LxlsToMl Project
City of Lodi Lower Sacramento Road (Kettlaman Lane to Harney Lane) EXHIBIT C
Public Works Dept
Reimbursable Coats
Del Ria Hall Del Rio Zane Gallntl0 Skce
She No. 16 05&140-07 Slb No. 17 053140-08 Sib No. 18 058-140-09 Site No. 20 058.140-11 Site No. 24 05&230.06 She No. 25 063230-07
ITEM
No. DESCRIPTION
K1WRDEV SERV-PHAmaofEerwNLwrSac RelmbursahleCcate.)dsTatal Project 4 9!912007
UNITQUANTITY U�dt Price
Trial
Qua.' Tool
Due Trial
(Juan' Tab!
OuenB Tore)
QuanB Trial
LOWER SAC ROAD CONSTRUCTION PROJECT
11.75%
11.42%
5.87%
9.62%
1
&MCH SANITARY SEWER PIPE
LF
146
185.00
0.00
0.00
0.00
0.
0.00
0.90
2
21 -INCH SM I TARY SEWER PIPE
LF
38 $
235.00
0.
0.
0.00
0.00
0.00
0.50
3
424NCH SANITARY SEWER PIPE
LF
218 $
390.06
0.00
0,00
0.00
0.00
0.00
O.DO
4
194NCH STORM DRAIN PPE
LF
51 f
125.00
0.00
0.00
0.00
0.00
9.00
0.00
5
484NCH STORM DRAIN PIPE
LF
242 $
205.00
0.
0.00
0.00
0.00
0.00
0.00
8
304MCH INDUSTRAL WASTE PIPE
LF
27 S
155.00
0,00
9.00
0.
0.00
0.00
0.00
T
PIPE MARKERS
EA
23
200.00
0.00
0.00
0.
0.00
0.00
0.00
B
SIDE INLET CATCH BASIN
EA
17
-9W DO
0.00
0.00
0.00
0.00
0.00
0.00
9
STORM DRAM MANHOLE
EA
14
3,650.00
&
0.00
0.
0.
0.
0.00
10
SANITARY SEWER MANHOLE
EA
3
3100.00
0.00
0.00
D.00
0.00
0.
0.00
11
INDUSMIAL WASTE MANHOLE
FA
1 $
31125.00
0.00
0.00
0.00
0.00
O.DO
0.00
12
104NCH WATER PIPE
LF
2 910 S
49.00
0.00
0.00
0,00
0.00
0.00
9.00
13
84MCH WATER PIPE
LF
119 S
35.00
0.00
0.00
0.00
0.00
0.00
0.00
14
64NCH WATER PIPE
LF
1 S
28.00
0.00
0.00
0.
0.00
0,00
070
15
2 -INCH WATER PIPE
EA
3 S
2.625.0a
0.00
0.00
0.00.0.00
0.00
0.00
16
TEMPORARY BLOW -OFF
EA
14
1.150.00
0.
0,00
0.00
0.00
0,00
0.00
17
WATER VALVE 10 -INCH -
FA
16
2.215.00
0.90
0.
0.00
0.00
0.
0.00
18
WATER VALVE 84NCH
EA
5 ;
1.925.001
0.
0.
0.00
0.00
01
0.
19
WATER VALVE 64NCH
EA
2 S
1225.00
0.00
0.00
0.00
0.00
0.
0.00
20
FIRE HYDRANT ASSEMBLY
EA
2 S
3050.00
0.00
0.00
0.00
0.DD
0.00
0.00
21
CONDUIT 24NCH CROSSINGS
LF
1,610 $
23.00
0.00
0.00
0.
0.00
D.OD
0.00
22
4aNCH CROSSINGS
LF
912 S
111.00
0.00
90.0
0.
0.00
0.00
0.00
23
CONDl11T 8-N1CH CROSSINGS
LF
572 $
17.00
&00
0.00
0.00
0.00
0.00
0.00
24
TRAFFIC Sr.KAL SYSTEM -CENTURY BLVD
LS
1 S 153 300.00
0.00
0.
0.00
0.
0.00
0.00
25
SIGNAL MODIFICATKINS AT KETTLEMAWLCWER SAC
LS
1
12000.00
0.00
0.
0.00
0.00
00.0
0.00
26
ADD CONDUIT CROSSINGS PER EUD REQUEST
LS
1 S
20 78.20
0.00
0.00
0.00
0.00
OAO
0.00
CONDUIT2 CCROSSWG
LF
336 S
9.W
0.00
0.00
0.00
0.00
0.
O.OD
CONDUIT 4" CROSSING
LF
M2 ;
14.40
0.00
0.00
0.00
0-00
0.00
0.00
CONDUITS"CROSSING
LF
622 S
17.70
0.
0.00
0.
0.00
0.00
9.00
27
DESIGN CHANGES FUTURE TS S4SETTLEMAN
LS
1 S
55 000.00
0.
0.00
0.
0.00
0.00
0.00
WOO AMENDMENT N3 173 X 65,0D0
D.
00.0
0.
0.
0.011
0.00
AM STEPHENS K -RAIL RENTAL
LS
1,500.00
0.00
0.00
0.00
0.
0.00
0,00
GEORGE REED INSTALL DELINEATORS
LS
3,192.36
0.00
0.
0.00
0.
0.00
0.00
0.00
0.00
0.00
0.
C
0.00
HARNEY CUR fE PROJECT
0.00
0.00
0.00
0.001
0.00
0.00
1
10' WATER PIPE
LF
1,1 $
72.00
0.00
0.00
0.00
01001
33EI.
33 2374.00
2
10^ WATER VALVE
EA
5 S
2.450.00
0.00
0.00
6.00
0.00
3
V BLOW CFF
EA
2 $
2,100.00
0.
0.00
0.00
0.
4
EUD R CROSSINGS EY
0.
0.00
0.00
0.00
WEST CROSSING 7o LF 114COST
LS
1 $
4,875.00
0.01)
0.
0.00
O W
EAST CROSSING HARN 70 LF 114 DOST
LS
1
4.875.00
0.00
0.
0.
0.00
a...
NORTH CROSSING LSR 120 LF 1f2COST
LS
1 $
9,749.00
0.00
0.00
0.
0.00
0.
0.00
0.
0.00
CENTURY BLVD CONSTRUCTION PROJECT
0.00
0.00
0.00
0.
1
48" STORM DRAM PIPE
LF
847 ;
2D5.00
0.00
0,00
0.00
0.00
0.00
TOTAL CONSTRUCTION COSTS
14 740.42
; 48170.9
f 2 874.71
4.85
74.00
S 2,376.011
10% ENGINEERING A ADIISNI$TRA
$ 474.!4
4H.75
$ T37AT
300.1!
S 237.80
S
TOTAL RENIBURSABLE COSTS
; 6 .36
S 5 24
; 2 812.18
; 4 1.07
f 413.60
K1WRDEV SERV-PHAmaofEerwNLwrSac RelmbursahleCcate.)dsTatal Project 4 9!912007
City of Lodi Lower Sacramento Road (Ketfleman Lane to Harney Lane) EXHIBIT C
Public Warta Dept
Reimbursable Costs
ITEM
No.
DESCRIPTION UNIT QUANTITY Unit Price
Sanchez
Silo No. 26 058-230-05
Q -thy Tale)
Sandoval Woods
Ste No. 27 05&230-09 Site No, 12
Q-Mky ChAnSly
056-070-09
d
Sell
Slb No. 11 05S -07C -05
Quantity Total
Ham
Site No. 10 056"70-07
Qu-fity Tow
LOWER BAC ROAD CONSTRUCTION PROJECT
7
84NCH SANFrARY SEWER PIPE
LF
146
155.00
0.00
D.00
0.
0.00
0.00
2
214NCH SANITARY SEWER PIPE
LF
38 $
235.00
0.00
0.00
0.
0.00
0.00
3
424NCH SANITARY SEWER PIPE
Lf
216 S
390.00
0.00
0.00
0.00
0.00
0.00
4
184NCH STORM DRAIN PIPE
LF
57 $
125.00
0.00
0.00
op
0.001
0.00
5
iMCHI STORM DRAIN PIPE
LF
242 S
206.00
0.00
0.00
0.00
0.001
0.00
6
30 -INCH INDUSTRIAL WASTE PIPE
LF
27 f
155.00
0.00
0.00
0,00
0.
0.00
7
PIPE MARKERS
EA
23 $
200.00
0.00
0.00
O.D01
0.00
0.00
8
SIDE INLET CATCH BASIN
EA
17 $
950.00
0.00
0.00
0.
0.00
0.00
9
STORM DRAIN MANHOLE
EA
14 S
3AW.00
0.00
0.00
0.00
G.D0
0.00
10
SANITARY SEWER MANHOLE
EA
3 $
3 100.00
0.00
0.00
000
0,00
0.00
11
INDUSTRL{LWASTE MANHOLE
EA
1
3625.00
0.00
0.00
0.00
0.00
0.00
12
10•INCH WATER PIPE
LF
2.910 S
49.00
0.00
0.00
0.00
0.00
0.00
13
8 -INCH WATER PIPE
LF
110 S
35.00
0.00
0.00
0.00
0.
0.00
14
NCH WATER PIPE
LF
190 S
28.00
0.00
0.00
0.00
0.
0.00
15
2 -INCH WATER PIPE
EA
3
2,625.00
0.
0.00
0.00
0.00
0.00
16
TEMPORARY BLOW -OFF
EA
14 S
1.160.00
0.00
0.00
0.00
0.00
0.00
17
WATER VALVE 1aINCH
EA
16 ;
2,215.00
0.00
0.
0.00
0.00
0.00
16
"TER VALVE 0-WQH
EA
5 $
1,925,00
0.00
0.
0.00
0.00
0.00
19
"TER VALVE 64NCH
EA
2 $
11,225.00
0.00
0.OD
0.00
0.
0.00
20
F'MIE HYORAN7 ASSEMBLY
EA
2
3,050.00
0.00
0.00
0.00
0.00
0.00
21
CONDUIT 24NCH CROSSINGS
LF
1.610 f
23.00
0.00
0.00
0.
0.00
OAD
22
IT 444CH CROSSINGS
LF
912
16.00
0.
0.00
0.
0.00
0.00
23
COrDW 64NM CROSSINGS
LF
572 S
17.00
0.
0.00
0.00
0.130
0.00
24
TRAFFIC SIGNAL SYSTEM -CENTURY BLVD
LS
1 f 153,3M.00
0.00
0.00
0.00
0.00
0.00
26
NAL MODIFICATK1nIS AT I�TTLEMANILOWER SAG
LS
1 f
12 006.00
0.00
0.00.0.00
0.00
0.00
29
CONDUIT CROSSINGS PER EUD REQUEST
LS
1 $
20,2792D
0.00
0.00
0.00
0.00
0.00
CONDUIT r CROSSING
LF
3% $
9.50
0.
0.00
0,00
0.
0.00
CONDllrr 4' CROSSING
LF
442 S
14.40
0.
0.00
0.
0.00
0.00
CONOUfr 8' CROSSING
LF
622 S
17.70
0.00
0.00
0.00
0.00
0.00
27
DESIGN CHANGES FUTURE TS SIKETTLEMAN
LS
11S
56 000.00
0.00
0.00
0.00
0.00
0.00
MTCO ALIT-NDAENT 93 iB COS X 55000
0.00
0.
0.00
0.00
0.00
AAA STEPHENS K -RAIL RENTAL
LS
S7 600.00
0.00
0.00
0.00
0.00
0.00
GEORGE REED INSTALL DELINEATORS
LS
3192.38
0.00
0.00
0.00
0.
0.
0.
0.00
0.
0.00
0.
NARNEY CURVE PROJECT
0.
0,00
0.00
0.00
0.
1
10' WATER PIPE
LF
I'm ;
72.00
33 2.375.001
33 2,376.00 103
7.416.001
103 7 416.
103 7 416.
2
10' WATER VALVE
EA
5 $
21450.00
0.00
0.00
0.00
0.00
0.00
3
4' BLOW OFF
EA
2 S
2,100.00
0.00
0.
0.00
0.00
0.00
4
E'UD CONDUIT CROSSINGS LS EY
0.00
0.
0.00
0.00
0.00
WEST CROSSING 70 LF 114 COST
LS
1 $
4,375.00
0.00
0.00
0.
0,
0.
EAST CAOSSM HARN 70 LF 1!{ COST
LS
1 $
4876.00
0.00
0.00
D.
0.00
0.
NORTH CROSSING LSR 120 LF 11 COST
LS
1 $
9 749.00
0.00
0.00
0.000.00
0.00
0.00
0.00
0.00
0.00
0.00
CENTURY BLVD CONSTRUCTION PROJECT
0,00
0.00
0.00
0.00
0.00
1
46' STORM DRAIN PIPE
LF
847 S
205.00
0.00
0.00
0.00
0.00
0.00
TOTAL CONSTRUCTKIN COSTS
f T;AO
is 2,376.00
$ 7 16,00
S 741600
f 7 10"0
10% ENGINEERING d ADMINISTRATION
$ 237"0
f 237.60
741.60
747.40
t 741"0
:2,157.60
TOTAL RENBURSABLE COSTS
; 2,!13.00
S 21013.W
S 1157.60
S 6157"0
;
K:1WPXDEV 3ERVm PHAmanlBono6tLwrSac_ReimburmbleGaso.MSTDW Project 5 3W2DG7