Loading...
HomeMy WebLinkAboutAgenda Report - June 19, 1996 (77)AGENDA TITLE: Plans and Specifications and Advertisement for Bids for White Slough Water Pollution Control Facility Holding Pond No. 3 Embankment Rehabilitation, 12751 North Thornton Road MEETING DATE: June 19, 1996 PREPARED BY: Public Works Director RECOMMENDED ACTION: That the City Council approve the plans and specifications for the above project and authorize advertising for bids. BACKGROUND INFORMATION: Since the four holding ponds at the White Slough Water Pollution Control Facility were constructed in 1967, the levee embankments have been eroding into the bottom of the ponds. The severity of last winter's storms and the storms in 1994 have also accelerated the erosion of the levees. This project will reconstruct the levee embankments of Pond No. 3 and reface them with riprap. This is the second year of a four-year project. Last summer, Pond No. 2's levee embankments were rehabilitated. The City will be rehabilitating one pond each year until all four ponds have been reconstructed. FUNDING: The money for this project will be coming from the Sewer Capital Outlay Fund. A request for appropriation of funds will be made at contract award. Project Estimate: $190,000 Planned Bid Opening Date: July 24, 1996 Jack. Ronsko Publi Works Director Prepared by Wesley K. Fujitani, Senior Civil Engineer JLR/WKF/Im cc: Purchasing Officer City Engineer Water/Wastewater Superintendent Assistant Wastewater Treatment Superintendent APPROVED: t H. Dixon Flynn -- Ci Manager CPSBA.DW 06106/96