HomeMy WebLinkAboutAgenda Report - June 5, 1996 (92)� OF CITY OF LODI COUNCIL COMMUNICATION AGENDA TITLE: Van Buskirk Park Master Plan MEETING DATE: June 5, 1996 SUBMITTED BY: Parks and Recreation Director RECOMMENDED ACTION: That the City Council adopt the Master Plan for development of Van Buskirk Park as presented. BACKGROUND INFORMATION: The park site is one (1) acre in size and located at the corner of Pleasant Avenue and Daisy Avenue. Until recently, the park was essentially a small baseball field. However, because of the size of the park, the ballfield created many problems with long balls hit over the fence into adjacent homes. The ball field has been removed and new facilities now need to be added. A Public Meeting was held on February 27, 1996 to receive public input and review the department's plans to revitalize this neighborhood park. The Parks and Recreation Commission reviewed and approved the master plan as presented by staff at its April 2, 1996 meeting. Improvements to the site include grading, mounding, drainage, handicap accessible playgrounds, %: basketball court, horseshoe pit, picnic tables, bike racks, benches, walkways, open play field, game tables, landscaping and irrigation. If approved by the council, staff will accomplish construction drawings in-house and proceed with construction in a phased manner as funds become available. First phase is scheduled for construction in November of 1996 using $70,000 from the departments 1996/97 capital budget. FUNDING: Capital Outlay Reserve Funds of $70,000 as proposed in the 1996/97 budget. Future funding to come from CDBG in 1997/98 and from private sector participation.., Ron Williamson, Park and Recreation Director Prepared by Dwight Dauber, Parks Superintendent APPROVED: %1011, k �. H. I X O N FLYNN recycled paper City Manager CC -1 Van Buskirk I'mk 1.0 Act es "is park is located off Pleasant Avenue and Daisy Avenue and is found InF - i� ..-- ; ,.� f- a portion of the city, deficient in neighborhood park faciiides. It is unfortunate that no other park land is available in the aiea and that the park itself is so small. Until recently the park was essentially a small baseball field. I lowever, because of the size of the park, the* ballfield */ created many problems with long balls hit over the fence into adjacent t • / . 't ' • lioines- The ballfield has been removed and other facilities now need to be added. Because of its size, the park should be restricted to passive uses only. Before any development occurs, a master plan should be completed. ` ( -) ICNIC - • , I i Recommended improvements to the park should include:ei • Expand the playground and ndd curbing, walls and seating areas `� - \ t �, N 1 I • Add a small multi-purpose paved court • plant new turf �. J I • • Add trees and landscaping - • Install a new park sign _. -�ASK�T LL OPEN PLAY �� � • ' �4 TOOT l� O -" �g� ' d PtCN iC 4 IDT LoT �l4' I arta I 01 _ TURF PL E A5ANT AVf-. a � w a � H 'K DESCRIPTION OF WORK 1. 2. 3. 4 1 -1 7. 8. 9. 10. 11. 12. 13. 14. 15. 16. 17. 18. 19. 20. T VAN BUSKIRK PARK MASTER PLA- Cost LACost Estimate: OUANITITY UNIT PRICE Date: 1/24/96 TOTAL DEMOLITION/CLEARING $141,436.00 lump sum 5,500.00 GRADING/SOIL FILL 33,800 sf .25 8,450.00 DRAINAGE $155,579.00 A. Storm Drain Line 10" dia. 250 if 45.50 11,375.00 B. 24" dia. catch basins w/cover 4 ea 1,100.00 4,400.00 ELECTRICAL A. New Installation underground lump sum 5,000.00 B. Security lights 2 ea 2,000.00 4,000.00 CONCRETE -FLAT WORK A. Walkways - 5 ft. wide 3,500 sf 3.50 12,250.00 B. Walkways - 3 ft. wide 270 sf 3.50 945.00 C. Curbing - 12 in. wide 230 sf 3.50 805.00 IRRIGATION SYSTEM A. Sprinkler System 33,800 sf .30 10,140.00 TURF 33,800 sf .15 5,070.00 CONCRETE PAVERS 1,200 sf 7.00 8,400.00 DRINKING FOUNTAIN 1 ea 2,500.00 2,500.00 PLAYGROUND AREA A. Fibar ground cover 2,750 sf 12.00 2,500.00 B. Play equipment lump sum 20,000.00 PICNIC SHELTER ORI 1 ea lump sum 15,000.00 HALF BASKETBALL PICNIC TABLES W/SLAB 4 ea 1,500.00 6,000.00 TREES 65 ea 80.00 5,200.00 SHRUBS lump sum 1,250.00 PARK BENCHES 5 ea 350.00 1,750.00 GAME TABLES W/SEATS 2 ea 1,200.00 2,400.00 KEYSTONE RETAINING WALL 35 If 70.00 2,450.00 WALL BENCH 301f 100.00 3,000.00 PARK SIGN lump sum 2,500.00 LOOP BIKE RACK 2 ea 300.00 600.00 SUBTOTAL $141,436.00 10% contingency 14,143.00 TOTAL CONSTRUCTION $155,579.00 DESIGN FEE (IN HOUSE) 0 TOTAL PROJECT $155,579.00