Loading...
HomeMy WebLinkAboutAgenda Report - June 5, 1996 (70)CITY OF LODI COUNCIL COMMUNICATION AGENDA TITLE: Plans, Specifications and Advertisement for Bids for Henning Substation Control Building MEETING DATE: June 5, 1996 SUBMITTED BY: Electric Utility Director RECOMMENDED ACTION: That the City Council approve the plans and specifications for Henning Substation Control Building and authorize for advertisement for bids. BACKGROUND: This project will install a 14' by 20' insulated and fully conditioned steel building within Henning Substation. Existing control panels and telemetry equipment will be relocated from the Operations Center into this control building by Department staff (phase 1). Relocation of the control panels will significantly improve system reliability. In addition, the relocation will provide much needed space within the Operations Center for modifications to dispatch boards and console resulting in improved system control and operation (phase 2). This project (Control Building) was approved for bidding by the City Council in August 1995 with bids received and opened on September 6, 1995. However, subsequent to the bid opening several factors relating to Lodi's bulk electrical power supply made it necessary to place this project on hold. At this time all issues pertaining to this project and its relationship to the power supply have been analyzed and resolved. FUNDING: Utility Outlay Budget: 1995-96 Appropriation (phase 1) $94,100 1996-97 Appropriation (phase 2) $32,805 Project estimate (Control Building) $40,000 Bid Opening Date: June 26, 1996 Alan N. Vallow Electric Utility Director Prepared by Hans Hansen, Assistant Electric Utility Director ANV/HH/sh cc: City Attorney Purchasing Officer Public Works Director APPROVED h:\user\admin\ctycncl\060596.cc1 Cin May 23, 1996