CITY OF LODI
COUNCIL COMMUNICATION
AGENDA TITLE: Authorization for the Police Department to Move
Investigations Division into Carnegie Forum Basement
DATE: May 15, 1996
PREPARED BY: Chief Larry D. Hansen
RECOMMENDED ACTION: That the City Council authorize the Police
Department to move its Investigation Division into
the basement of the Carnegie Forum. This action
requires approval of construction costs and architectural services, purchase of office
systems furniture, data & telecommunications removal and installation, purchase of
audio/video equipment and other computer related equipment. The City Council should
also appropriate $168,700.00 from the Police Development Mitigation Impact Fees for
this project.
BACKGROUND INFORMATION: The Lodi Police Department has occupied the
Public Safety Building since 1967. The
Investigations Division has occupied approxi-
mately the same amount of office space since
that time. Due to the addition of the Streets Crime Unit authorized by the City council
this past year (5 positions), and due to other additional personnel, we have outgrown our
present facility.
The Investigations Division of the Lodi Police Department is anticipating moving to the
lower level of the Carnegie Forum in August or September of this year. We will utilize
all existing HVAC equipment, alarms, utilities and existing floor space. This move will
provide us with office space for (21) persons, sufficient to operate this division for many
years to come. The proposed floor plan is attached as Exhibit A.
Carnegie Forum lower level is currently providing office space for (11) persons from the
Administrative Section of the City of Lodi, which they will utilize until the City Hall
remodeling project is completed. The Office systems furniture which is being used by
the staff was designed for City Hall and will be moved upon completion of that project.
APPROVED:
!///,�
H, DIXON Fl NN
City Manager
recycled paper
r
cc -1
Authorization to Move Investigations Division
to Carnegie Forum Basement
May 15, 1996
Page 2
Architectural Services and Construction Costs
The City of Lodi acquired the services of Wenell Mattheis Bowe Architecture - Planning
- Interiors, of Stockton to work with our staff and design a plan which would provide
work areas for (21) staff persons in this division to acquire the needed work space, some
modification and construction is needed. As a result of their planning, the following is
required:
1. (3) supervisors offices size will be reduced, allowing for more work space
for staff in the investigations portion of the structure.
2. Doorway adjacent to the Street Crimes/Gang Sergeants office will be
added to allow better access for citizens and investigations personnel to
the conference room and Street Crimes Unit.
3. (2) Interview rooms will be constructed. These rooms are used to
interview victims of crimes and to do Computer Voice Stress Analyzer
(CVSA) interviews. These rooms will be equipped with both audio and
video equipment to monitor and record interviews.
4. Storage room for council tables and chairs.
The estimated construction costs are: $ 24,700.00
Concept Cost Estimate is attached as Exhibit B.
The City of Lodi Public Works Department recommends the firm of Wenell Mattheis
Bowe be utilized to coordinate the planning and construction administration and their fee
will include the following:
Project Investigation
Construction Documents
Building Department Processing
Bidding Assistance
Construction Administration
Their fee for the above is: $ 10,800.00
Proposal for Services is attached as Exhibit C.
Authorization to Move Investigations Division
to Carnegie Forum Basement
May 15, 1996
Page 3
Office Systems Furniture
Due to construction constraints and design of the lower level of Carnegie Forum, the only
way we can provide office space for (21) employees is to utilize Office systems Furniture.
We have received a bid from our current supplier, Warden's Office Supply for office
systems furniture for (21) working positions and other related equipment such as tables,
chairs and storage cabinets.
Total cost including tax, delivery and installation: $108,700.00
The cost is discounted 63.28% off list price by purchasing off of the League of Cities
contract.
Cost Summary Sheet is attached as Exhibit D
Data & Telecommunications
Cost of moving existing equipment, which will include telephones, CLETS & CJIS
terminals, cable and other related equipment is estimated to be: $ 6, 500.00
Equipment
Equipment and hardware include an IBM multiplexor, terminals, printer for CJIS/CLETS
System, wiring and coax cable connections and necessary hardware to connect the AS400
computer. Depending on availability, some of this equipment may be available as used
equipment. The estimate cost range is up to: $ 7,000.00
Audio/Video Equipment
This equipment will be used in both interview rooms. Presently the method of recording
interviews on major cases is limited to audio tape recordings or video recording with a
camera on a tripod in view of the subject. Interview and interrogation techniques are
hampered by this method. The camera visible to a suspect inhibits the interrogator from
obtaining a confession. Victims or witnesses become very uncomfortable with
equipment "staring" at them in an interview room. the interview and interrogation
schools LPD officers attend strongly recommend that the best audio and video recording
are necessary for successful prosecution. Currently San Joaquin County Sheriff, Stockton
PD, and the Child Advocacy Center are using specially equipped interview rooms with
concealed audio and video equipment. This remodeling project is the best opportunity to
bring LPD up-to-date in this area.
Authorization to Move Investigations Division
to Carnegie Forum Basement
May 15, 1996
Page 4
The estimated cost for this equipment is: $ 3,000.00
Contingency
In a project of that size it is recommended that a minimal contingency be budgeted for. A
5% contingency should be budgeted $ 8,000.00
FUNDING: $168,700.00 Police Development Mitigation Impact Fees
Larry D. Hansen
Chief of Police
LDH:sm
cc: City Attorney
54_0024.0.1)
ATTACHMENT A
k 1 1
iu�
c „c
J
0)) SCALE: 1/8" = 1'0"
FLOOR PLAN
ATTACHMENT B
LODI POLICE DETECTIVE DIVISION
REMODEL CARNEGIE FORUM BASEMENT
CONCEPT COST ESTIMATE
Description
Subtotal Total
1 ENTRY $ 2,400
3 New Wall with Wallcovering & Wood Base & Wood Cap $ 1,000
4 Handrail $ 650
5 Door and Hardware $ 750
7
8 INTERVIEW (Off Waiting Room) $ 1,806
10 Carpet$ 180
11 'Ceiling $ 120
12 Lighting $ 300
13 HVAC $ 300
14 Painting $ 256
15 Door & Hardware $ 650
17
18 ,INTERVIEW $ 3,288
20 Walls $ 1,088
21 Ceiling Modification $ 100
22ILighting Modification $ 300
23 I HVAC Modification $ 300
24 Doors & Hardware $ 1,500
26
27 OFFICES $ 7,300
29 Rebuild Window Walls; Relocate Window & Doors $ 3,200
30 Ceiling Modification $ 500
31 Lighting Modification $ 500
32 HVAC Duct Rerouting $ 500
33 Demolition for Door $ 250
34 ' New Door & Hardware $ 750
35 'Demolition Concrete Slab $ 250
36INew Stairs & Slab _ $ 350
37!Carpet Stairs $ 250
38;Handrails $ 750
40
41 INTERCOM/SECURITY SYSTEM $ 2,500
42
43 MISCELLANEOUS ELECTRICAL MODIFCATIONS $ 1,000
44
_45 ELEVATOR CONTROL MODIFICATION $ 1,000
46 —_— 47 SUBTOTAL $ 19,294
49 Markup @ 28% $ 5,402
50
511TOTAL CONCEPT COST ESTIMATE $ 24,696
Lodi Police Detective Division
3/18/96 Concept Cost Estimate Page 1 of 1
ATTACHMENT C
March 27, 1996
z 1996'
Jack Ronsko, Director
PUBLIC WORKS DEPARTMENT
CITY OF LODI
P.O. Box 3006
Lodi, CA 95241-1910
SUBJECT: CARNEGIE BASEMENT REMODEL FOR
POLICE DEPARTMENT DETECTIVES
Dear Jack,
We are pleased to submit the following proposal for the remodeling of the Carnegie
Basement for Police Department Detective usage based upon the attached approved
plan, dated 3/25/96. The scope of work will consist of the remodeling as shown;
moving and installing new walls and doors to create several new rooms and
modification of finishes, mechanical and electrical systems to accommodate the
uses. Electrical conduit will be provided for alarm and signal modifications and for
interview videotaping system; however, security alarm systems, data
communication systems and video taping systems are not included in our scope of
work.
Our fees are determined on the following scope of services:
• Project Investigation
• Construction Documents
• Building Department Processing
• Bidding Assistance
• Construction Administration.
Our construction administration services assume bi-weekly site meetings as well as
shop drawing submittal review and punch lists. Our mechanical and electrical
consultant fees include limited construction administration services to include
submittal review and punch list.
For the sake of continuity, we are proposing A.C. Systems Engineering, Inc. and
Nelson and Associates as consultants.
WENELL
MATTH EIS
BOWE
ARCHITECT( 'RE
PLANNING
INTERIORS
246
E. Main Street
Stockton
California
95202
PHONE:
209 / 944-9110
FAX:
209 / 944-5711
Proposal for Services
CARNEGIE BASEMENT REMODEL FOR
POLICE DEPARTMENT DETECTIVES
March 27, 1996
Page 2
The proposed fee is
Architectural $ 6,870
Mechanical 1,200
Electrical 2.20Q
TOTAL $ 10,770
We realize that the proposed fee has no proximity to a "normal" percentage fee. On
very small projects like this, the tasks are the same as for a project many times its
size; the fee is based upon the tasks to be completed and our knowledge of your
expectations of services to be provided. The tasking sheets are attached for your
information.
We can proceed with the project upon receipt of your purchase order and will
expedite the project to coordinate with the projected City Hall moving dates.
Sincerely,
WENELL MATTHEIS BOWE
Larry Wenell, Architect
President
C :\ W P W IN 61 \ W PDOC S\PROPO SAL19606.1
WMB
WENELL MATTHEIS BOWE Architecture • Planning • Interiors
Larry Wenell C6599 Timothy Mattheis C16986 Tom Bowe C13357
PROFESSIONAL SERVICES WORK ORDER
WMB JOB NO. 9606.1
This agreement entered into on the fifteenth day of January, 1996 (January 15, 1996) between Client,
City of Lodi (hereinafter called Client) and the Consultant, Wenell Mattheis Bowe, Inc. (hereinafter
called Consultant) for services in connection with the following project:
Carnegie Basement Remodel for Police Department Detectives
The Client and Consultant's rights, duties, and obligations hereunder will be performed in accordance
with the terms and conditions of the Agreement for Professional Services between Client and
Consultant dated February 3, 1995 which is fully incorporated herein by reference.
I. Scope of Services
The Consultant's services will consist of the following:
See attached letter dated March 27, 1996 for a description of the scope of services.
II. Consultant's Compensation
In consideration for Consultant providing the services noted above, the Client agrees to
compensate the Consultant as follows:
Time plus materials per the attached fee schedule not to exceed $10,770.
In witness whereof, the parties have accepted, made and executed this agreement upon the terms,
conditions and provisions above stated, the day and year first above written.
Consultant: By
Name:
Client: By
Name:
Title:
Address:
(Signature)
Larry Wenell, President
WENELL MATTHEIS BOWE
246 E. Main St., S =202
1,
\\TI1VIB WENELL MATTHEIS BOWE Architecture • Planning • Interiors
246 E. Main Street, Stockton CA 95202 Phone (209) 944-9110 Fax (209) 944-5711
FEE SCHEDULE
July, 1995
Principal Architect $ 90.00/hour
Staff Architect II 75.00/hour
Staff Architect I 65.00/hour
Design/Draftsperson II 55.00/hour
Design/Draftsperson I 50.00/hour
Draftsperson 45.00/hour
Clerical 30.00/hour
REIMBURSABLE EXPENSES
Reimbursable Expenses are in addition to compensation for basic and additional services.
Reimbursable expenses include actual expenditures made by the Architectand the Architect's
employees and consultants in the interest of the project.
Mileage $ .25/mile
Blueprints - 24"x36"
10 Sheets or less 1.50/sheet
Production Printing --11 Sheets or More .65/sheet
Blacklines - 24"x36" .80/sheet
Sepias - 24" x 36" 2.15/sheet
Xerox Bond - 24"x36" 7.20/sheet
Vellum - 24"x36" 11.50/sheet
8'h"x11" Copies .06/copy
11"x17" Copies .12/copy
Fax 3.00/page
Postage/Shipping & Handling Cost plus 20%
Presentation Materials
PMT Drawing Reductions
8'/2'x11" 9.00/sheet
11"x 14" 12.00/sheet
12"x18" 15.00/sheet
Drymount 4.20/sq ft
Drymount & Laminate 8.40/sq ft
Color Xerox, 8"x10" 3.00/xerox
City of Lodi
Carnegie Basement Remodel
for
Police Department Detectives
PHASE "E" PROJECT INVESTIGATION
PERSONNEL/TIMEFRAME
Princ Princ Princ SA II SA I DD II DD I D Cler
TASK $ 90 $ 90 $ 90 $ 75 $ 65 $ 55 $ 50 $ 45 $ 30 Totals
302 Building Measurement 2 2 $ 180
' 155 Meeting w/Client 1 1 $ 90
'TOTAL HOURS 3.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 3.0 $ 270
PERSONNEL WEEKS 0.1 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.1
TOTAL PHASE "E" 270 0 0 0 0 0 0 0 0 $ 270
PHASE "K" CONSTRUCTION DOCUMENTS
TASK
PERSONNEL/TIMEFRAME
Prin Prin Prin SA II SA I DD II DD I Drft Cler
S 90 $ 90 $ 90 $ 75 $ 65 $ 55 $ 50 $ 45 $ 30 Totals
404 Title Sheet
405 Code Compliance Sheet
406 Floor Plan(s) 2
414 Architectural Details 1
415 Door Schedule/Elevations
416 Door Details 1
417 Window Schedule/Elevations 1
418 Window Details 1
420 Finishes Schedule 1
421 Reflected Ceiling Plan(s) 2
427 Cost Estimate 3
165 Consultant Coordination 3
433 In -House Plan Check 2
429 Specifications 5
152 Correspondence 2
155 Meeting w/Client 4
158 Meeting w/Gov't Agency 1
163 Plotting Drawings
164 DXF Disk Preparation
1
1
2 2 $ 100
1 1 $ 50
6 8 $ 480
2 3 $ 190
1 1 $ 50
2 3 $ 190
1 2 $ 140
2 3 $ 190
2 3 $ 190
2 4 $ 280
2 5 $ 330
3 $ 270
2 $ 180
8 ` 13 $ 690
2 4 $ 240
4 $ 360
1 $ 90
1 $ 55
1 $ 55
'TOTAL HOURS 29.0 0.0 0.0 0.0 0.0 2.0 21.0 0.0 12.0 64.0 $ 4,130
PERSONNEL WEEKS 0.7 0.0 0.0 0.0 0.0 0.1 0.5 0.0 0.3 1.6
TOTAL PHASE "K" 2610 0 0 0 0 110 1050 0 360 $ 4,130
3/27/96 Architectural Tasking 1
City of Lodi
Carnegie Basement Remodel
for
Police Department Detectives
PHASE "L" BUILDING DEPARTMENT/GOVERNMENT AGENCY
PERSONNEL/TIMEFRAME
Prin Prin Prin SA II SA I DD II DD I Drft Cler
TASK $ 90 S 90 $ 90 S 75 S 65 $ 55 $ 50 $ 45 $ 30 Totals
500 Building Permit Processing 1 1 $ 90
501 Backcheck Documentation 1 2 1 4 $ 220
TOTAL HOURS 2.0 0.0 0.0 0.0 0.0 0.0 2.0 0.0 1.0 5.0 $ 310
PERSONNEL WEEKS 0.1 0.0 0.0 0.0 0.0 0.0 0.1 0.0 0.0 0.1
TOTAL PHASE "L" 180 0 0 0 0 0 100 0 30 $ 310
PHASE "M" BIDDING/NEGOTIATION
TASK
PERSONNEL/TIMEFRAME
Prin Prin Prin SA II SA I DD II DD I Drft Cler
$ 90 $ 90 $ 90 $ 75 $ 65 $ 55 S 50 S 45 $ 30 Totals
530 Bid Questions 2 2 $ 180
526 Addendum Doc/Processing 2 2 4 $ 240
155 Meeting w/Client 2 2 $ 180
TOTAL HOURS 6.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 2.0 8.0 $ 600
PERSONNEL WEEKS 0.2 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.1 0.2
TOTAL PHASE "M" 540 0 0 0 0 0 0 0 60 $ 600
PHASE "N" CONSTRUCTION ADMINISTRATION
PERSONNEL/TIMEFRAME
Prin Prin Prin SA II SA I DD II DD I Drft Cler
TASK $ 90 S 90 S 90 S 75 S 65 S 55 S 50 S 45 $ 30 Totals
550 Construction Site Meeting 8 8 $ 720
553 Construction Information Bulletin 2 2 4 $ 240
559 Shop Drawing Review/Process 3 3 $ 270
557 Punch List /At Site 2 2 $ 180
558 Punch List Processing 1 2 3 $ 150
TOTAL HOURS 16.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 4.0 20.0 $ 1,560
PERSONNEL WEEKS 0.4 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.1 0.5
TOTAL PHASE "N" 1440 0 0 0 0 0 0 0 120 $ 1,560
3/27/96 Architectural Tasking 2
City of Lodi
Carnegie Basement Remodel
for
Police Department Detectives
SUMMARY
Phase E - Project Investigation $ 270
Phase K - Construction Documents $ 4,130
Phase L - Building Department $ 310
Phase M - Bidding/Negotiation $ 600
Phase N - Construction Administration $ 1,560
Total $ 6,870.00
3/27/96 Architectural Tasking 3
WAT2bEN
Oa*iaCai •NOpVtT$
Modesto
Main Office 1 Showroom
14h & "J" Street
Modesto, CA 95354
;209)529.6321
=ax (2091529.2733
�I
ATTACHMENT D
April 3, 1996
City of Lodi Police Dept.
Attn: Capt, Mauch
Capt. Mauch's office - systems $ 15206.54 S5,805,09 S5,805.09
furniture (Includes tax)
Secretary's office - systems furniture S13,604.86 55.114.41 $5,114,41
(Includes tax)
Narcotics Sgt.'s office - systems $ 10273,16 $3,895.11 $3,895.11
furniture (Includes tax)
Lt. Murray's office - systems furniture $ 11,702.16 $4,423,46 $4,423.46
(includes tax)
j Gang Sgt.'s office - systems furniture S10273.16 S3,895.11 $3,895.11
(includes tax)
Open areas - systems furniture $123,616,54 $45,387.74 545,387.74
(includes tax)
Side chairs and conference tables S15,230.88 $6,566.40 $6,566,40
(includes tax)
70 Lockers - 18" wlae x 24' deep x 62" $445.00 5267.00 $5,753.85
high with aajustable shelves and
coat rack; locking (includes tax)
7 Storage cabinets • 42" wide x 18" S530.00 5317.00 $2,219.00
deep x 62" high; adjustable shelves;
lodcinq.(includes tax)
2 Storage cabinets - 20- wide x 20" 5358.00 $214.00 $461.17
deep x 30" hiah (includes tax)
Estimate for 23 task chairs (includes $833.00 $498.00 S12,341,69
tax)
Estimate for 1 executive chair
(Includes tax)
Estimate for 24
(includes tax)
Installation estimate 57996,00
S108.692,70
Authorized by.
Accepted by:
sacks+
Showroom
443 west Inns
$taken, CA 862 t0
12C91 4 72-2 939
rtu 190G> 471,2774
Total
Lead time is approximately 5-7 weeks.
urchase order instructions to follow,
MsrsrreaN
OISVIMRWn Clinker
12 t 7 ')dl 3trsel
4uW{Iu CA 9t1354
2001 5.20.6321
rs1;am N4 euJl
hi( Date:
Date;
Used Furnnsrs
Showman,
/4 9t 91rw
44p ow r A 95.350
;209.549- 1000
Fix x2001 :4P 1794
P.O,#
0
CPI P11415 Of ICC
INVESTIGATIONS LIEUTENANT
SECRETARY'S OFFICE
SIREEI CRIOS & NARC011.CS SERGEOIS
INVESTIGATORS & MISCELLANEOUS