HomeMy WebLinkAboutResolutions - No. 2006-179RESOLUTION NO, 2006-179
W %=Stoll
WHEREAS, in answer to notice duly published in accordance with law and the order of
this City Council, sealed bids were received and publicly opened on September 6, 2006, at
11:00 a.m. for the purchase of polemount and padmount transformers for the Electric Utility
Department, described in the speci . fications therefore approved by the City Council on August 2,
2006; and
WHEREAS, said bids have been compared, checked, and tabulated and a report
thereof filed with the City Manager as shown on Exhibit A attached; and
WHEREAS, the City Manager recommends the award of the bids for the various types
and sizes of pole aunt and padmount transformers for the Electric Utility Department be made
to the bidder whose proposal and equipment meet City of Lodi specifications and whose
transformers are expected to yield the lowest overall life -cycle costs, listed as follows:
Poles ounts; 27 ea Electric Research & Manufacturing Cooperative (ERMCO) $35,515.48
Padrnounts: 5 a ERMCO 148.33_558
$83,851.06
NOW, THEREFORE, BE IT RESOLVED that the award of the bids for the purchase of
polernount and padmount transformers for the Electric Utility Department be and the same is
hereby awarded >to the lowest responsible bidder, ERMCO, Inc., of Dyersburg, Tennessee,
(represented by Hees Enterprises of Astoria, OR) in the total amount of $83,851,06.
Dated: October 4, 2006
I hereby certify that Resolution No. 2006-179 was passed and adopted by the City
Council of the City of Lodi in a regular meeting held October 4, 2006, by the following vote:
AYES: COUNCIL MEMBERS — Beckman, Hansen, Johnson, Mounce,
and Mayor Hitchcock
NOES: COUNCIL MEMBERS — None
019���ffi
'IN N I F E �R�
interim City Clerk
s
Transformer Bid Eval uaton Bid Opening: September 6, 2!)06
Poleme mni: rax {factor): 1.0775 PAmary finding: 12,0M Volt i.ine-lit,-Liana
iib Loasf Lass $laya38: 3.75
September 6, 2CM LoM Loss Uvatt: 1.25
Sid ftem 1: 250M, 12i7tt4ti'x oR, Single Phase Conventionw Pois
140 Lead
Number of unit&,
5
45
500
Veedar
U.nil
No Load
Load
Loss
Lv”
No Load
Lood
Cam of
Life Cycle
Oelivsni
Vendor
Unil
Extended
Pn£e
Loss
Lusa
No Load
Leat!
Cosi of
Life .CycAe
DeliveryHeight
cbsi $
Weh R 4
{irrchea3
€ O= S
Price S
WAM 5
1wasis)
(watts)
Loss value Loss value
trasses $
c93$ $
(weeks)
pinches)
(p ds)
lRtAGr�cPoiEeesAtS8ertes�?t,- 8310$1., 34 _'395G `;;1O,t54S
�
100
3,$t_ �7& 333f; fid_
MSC® L1ish bvfion-Sara Leandro
1,838.€10
3,19Lr.0®
9,4142.23
77
US
1,443.75
2,152.50
3,606.255
13,508448
31
'37
322.2
GE Suppty
1,3.28.€10
5,64a iD
7,154-611
55
323
1,431.25
2,018.75
3,050,00
10,204,60
23
21.8
336
Howard fn.dustries, inc.
1.270M
6,350.00
5,842-13
68
320
1,275-00
2,£3007.00
3,276,DD
10,117.13
22-24
32
334
Central Moloney, Inc.
No ENd
42,535.16
22-24
39
560
%entrap Masortey. Inc.
Howard industries, Inc.-Gaoper
1.400,00
12,600.00
83,676.50
so
489
HugPses SUP*., inc. -Cooper
I. .QMOO
5,045.070
5,435.99
49
372
918.75
2,325,00
3;243.75
8,678.74
39.41
37
328
3
Bid item 2: 37.UVA, 1201240 Volt„Single Phase Clrcuit-Pr tpcted. Poo Numberofunits: 9 48 e25
Bid Recce 3: SUVA, 1201240 Volt, Single Phase Circuit -Protected Pais
140 Lead
Load
13
51
800
Veedar
U.nil
Extended
Price
Loss
Lv”
No Load
Lood
Cam of
Life Cycle
Oelivsni
Height
Weight
Ex9ended
Price $
Price $
Whax $
;watts)
llwetts)
Loss value
Lass value
Losses $
cbsi $
(w ks)
{irrchea3
Oowr0sj
FtflC® cks,He Ent�tpaises Pna -;
1 23¢ 11 !2 iXk ,1
386 5 € ;: 63 ';Z 6639 25
, . 4 756 Ta
_' 7 5501 18,54 g 33 33:43:
Losses $
"629;;
SCii.i3is[fibuvon -San Lear dto
2,374.00
21,365:130
23,021.E.7
100
507
3,37.5,00
5,703.75
9,076.75
32,100,62
31
42
507
CSE Supp#y
1,895.001
17,M.00
18,376.75
60
424
2,7a70:W
4,770.W
7,470-00
25;846.75
23
32-7
501
Howard indus+.ries, Ince
2,015.00
18,135,04
19,540,46
92
414
3,105:1017
4,6.57.50
7.762.50
27,302.96
22-24
36
442
Central Mdoney, inc.
N0+0id
28,771.41
114
505
5,557.50
8,206.25
13,763.75
42,535.16
22-24
39
560
%entrap Masortey. Inc.
Howard industries, Inc.-Gaoper
1.400,00
12,600.00
83,676.50
so
489
2.700.00
5,5131.25
8,201.25
29,777.75
39-41
41
441
Bid Recce 3: SUVA, 1201240 Volt, Single Phase Circuit -Protected Pais
Number sof units:
13
51
800
No Lead
Load
Vendor
Linn
Ex9ended
Price
Loss
Lass
No Load
Lead
Cosi of
Left, Cycle
Delivery
Helght
Vleight
Price $
Price S
wAax $
(watts)
{watts)
Lass value Loss value
Losses $
Cost $
(weeks)
(incites)
(pounds)
��T�RCas rlq,"iis Eatfeigar�`;e5 PsxS
# 3lE3Pk
, fT Sg;? b�f
�:i� P336 79 �1i9
5€7€3' � 801 2s� ,:.
S ii5 i�
13,92fi Z� ,_ .. 32 96� 44 33 33�„
di3:�
;'�$Z,
WESC4 Distribution _Sari Leandro
2,666.00
34,558-40
37,344,041
123
530
5,988.25
10,237.50
15,233,75
$3,577-75
31
46
561.74
Lit: Suppty
2,990.00
37,570.00
40,481.68
102
384
4,972.50
8,240.00
11,212.50
511,694AS
23
33.1
817
Howard Industries, Inc.
2,054,00
26,7162.00
28,771.41
114
505
5,557.50
8,206.25
13,763.75
42,535.16
22-24
39
560
%entrap Masortey. Inc.
No Sid
Howard industries, fine, -Cooper
1,820.06
23A60.00
25,493.68
107
601
5295.25
9,766.25
94,982.550
49,476.15
39-41
43
551
Trans€onnerEval0315fly ro9e,aAs 1
4;11847 A
Transformer Bid Evaluation
Bid OpeN ng, Seplembsr6. 2006
Padmount
15,242:46
-.:
Tax (f tor):
1.0775
pdmary Winding., 12.000 Voll, Delta Cwnected
5,975.00
13,74£9,069
20,71S.9t1
.3.894
52
No Load Loss Uwait:
3.75
10,290.00
11,087.48.
383
1764
1,06.25`.._
2,205,M
Septerr bW 6, 2W6
14,729.73
52
Load Loss $Await:
1.25
GE Supply
8,8 0.00
8,8G?0.09
3,482.0ti
130
2726
wd iter. l: ISO 6cVA, 20SY1120 Volt, Three Phasa Pad
3,40,50
6,145.66
15,527.00
22
Number cl units:
1
Howard industaies, Enc.
9.198.447
65
>2.0
Vendor
Lhil
Extended
Price No Load
Lead
No Load Load
Cost of
Lite Cyde
Delivery
Heighl
Impedance
7,654.00
Price $
Price $
w ftax $ -ass (wans..oss
(ws ns
Loss value Less value
Losses $
cost $
(weeks)
(inches)
%
EFiA� alFsrtls3 $#tC
ra SSs 5 ti355 170
6 Ai6 �s3 323,
': X594 , 9 2i S, 25_ _# 993.51?-:.., 3,3193 75': ' .. 9 620 26 € 231 4 BJA
. .. ..... . . ...
V4,F_SGO L9isiftutien -San Leandro, CA
7,774.00
.....
7,774,OG
_.
8,376:49 .332
124.2
1,2455-00 9,552.50
2,791,50
$1,173,99
52
4$
2.710
GE SURPIy
7,485.1111
7,41 6,00
a'oss.?39 535
2113
2.381.25 2,641.25
5,022.50
13'"7.59
22
S3.'(S
3.160
H.Ward 1n ustne's, Inc,
7,980.00
i,3E3o:4}f1
8,568.45 3{16
3587
1,147.54 2,021.25
3,168.75
11,.767.20
18-20
46
23410
Hughes supply, inc,-Pauwais
6,376,40
6,376:00
5,374).14 325
1555
9,216.75 1,943:75
3,96.2,50
10,032.64
26-28
52
2.12®
mughss.Sup*,Inc. Gooper
6,861.00
6,86:.4:'3
7,392.73 339
4326
1,271.25 1,657.50
.2,9x8.75
10,321.46
27-N
5o
2.940
Centra3 metwey
No SW
Bid item 2: 225 WA, 4800277 1lott, Three Phase Pad,
Number of urnifs;
1
65
>3.5
Vendor
unit
.Extended
Price No Load
Load
No Load Lead
Gast of
iris Cycle
09ei¢+rery
Height
Impedance
Price 5
price. $
wp;jx $ ass twatt!.oss
(watts
Loss valve Loss value
Lasses $
Cost $
(weeks)
(.inches)
%
Bld hem a; 640 WA, 48411277 Volt, Three Phase, Pad, Number ofunts: 3 - 75 >4.0
Vendor unit Extended Price No Load Load No Load Load Cast of Life Cycle Deaivery Heigbt 6mi araco
Price $ Price $ wAax $ ass (matt= ass (watts Loss va6ue Loss value Losses S Cost $ (weeks) (inches) %
4(r 638x3 34 914 6E3" 34 357 30 75% 347tX
VVESCr3 Distribution -San Leandro. CA
15,242:46
-.:
,
620
--
5,975.00
13,74£9,069
20,71S.9t1
.3.894
52
Sw C&isttWion -San Leandro, CA . - -, ..
113,2965.4)0
10,290.00
11,087.48.
383
1764
1,06.25`.._
2,205,M
3,641.25
14,729.73
52
56..
22
GE Supply
8,8 0.00
8,8G?0.09
3,482.0ti
130
2726
2,737.50
3,40,50
6,145.66
15,527.00
22
50.18
3.946
Howard industaies, Enc.
9.198.447
9,196.00
9x9918.85
413
2,130
1,548.75
2.662.50
4,291.25
14,'x22.10
18.24
51
3..WD
Hughes Supply911c,-Pauwreis
7,664.40
7,654.00
8,257.96
442
1956
1,657.50
2,445=
4,192:50
11,360.46
26-28
58
3.640
Hughes Supply. Inc,-Cnotxar
8,266.00
8,M1W
8,9196:62
399
173€1
1,496.25
2,182.54
3,658.75
12,566.37
27-29
50
3.8561
centra) Maloney
No Bid
Bld hem a; 640 WA, 48411277 Volt, Three Phase, Pad, Number ofunts: 3 - 75 >4.0
Vendor unit Extended Price No Load Load No Load Load Cast of Life Cycle Deaivery Heigbt 6mi araco
Price $ Price $ wAax $ ass (matt= ass (watts Loss va6ue Loss value Losses S Cost $ (weeks) (inches) %
4(r 638x3 34 914 6E3" 34 357 30 75% 347tX
VVESCr3 Distribution -San Leandro. CA
15,242:46
45,726.410
49,269.77
620
3564
5,975.00
13,74£9,069
20,71S.9t1
59,984.77
52
5A
5.230
E Supply
12,300.00
38,96157.174
38,769.76
1359
5406
45,288.75
24,272,50
35,561.25
75,321.00
22
56.89
4.124
Hoard industries, Inc.
14,724.00
44,172.00
47,5955.33
1302
3786
9,022.50
14,197.50
23,220.00
70,61.5,33
18-29
61
4.3130
Hughes. Supply, loc.-Pauwels
11.878.00
35,634.00
38,395.94
692
3905
7,785.00
14,643.75
22.428.75
60,$24.39
25.28
56
4.000
Hughes Supply, iM.-Oooper
13,089.00
39,297.00
42,342.52
845
2992
9,506.25
11,220.00
2o,726.25
63,068.77
27-29
50
4.320
Genital wonoy
No BW
Transformer Evac 09.15-06_pota.xris 2