Loading...
HomeMy WebLinkAboutResolutions - No. 3318RESOLUTION NO. 3316 ADOPTING THE PREVAILING WAGE SCALE IN ACCORDANCE WITH SECTION 1770 OF THE STATE LABOR CODE RESOLVED, in accordance with Section 1770 et seq. of the Labor Code of the State of California, that the City Council of the City of Lodi does determine that the general prevailing rates of per diem wages paid in the City of Lodi are as shown on Exhibit A" and Exhibit "B" attached hereto and made a part hereof. FURTHER RESOLVED. that Resolution No. 3235 is hereby repealed. Dated: November 5, 1969 I hereby certify that Resolution No. 3318 was passed and adopted by the City Council of the City of Lodi in regular meeting held November 5, 1969 by the following vote: Ayes: Councilmen - Brown, Culbertson, Hunnell, Schaffer and Eirsten Noes: Councilmen - None Absent: Councilmen - None 3316 SCALE OF WAGES YC11 BUILDING AND CONSTRUCTION Fage 1 SAN JOM JIN COUNTY Ci.'SSTFICATION WAGES HOUi 3 HOUii,S HEALTH VACATIL N F'ENST iN tut PRI FER AND HOUR DAY K'EK WELFARE To- 0¢W 90011i 350fl1 $6.87 ((Includes Holiday) ASBESTOS Wr1RIUERS: Journcyp n Feroman 7.27 40 per hour for Apprenticeship Training and Research Fund 2¢ pr_r hour Occupational Health 1¢ rx.r hour Promotional Fund BOILERMAKERS : a Foreman $7.30 Asst. Foreman 7.05 Journt.yma n 6.80 2¢ per hour Apprenticeship Training Ircpram LO 30¢Fii 3001-H 400F1I 131TCK HCD CAR,tIEFcs: X4.94 8 40 300FH 400111 40¢F1 CAi1FET AND LIN. Layers $6.00 8 LO NCTE: 01.10 per hour "Package" placed in Wells Fargo Bank for Fringe Benefit,,. cikRFENTERS: 8 40 35¢F11 50¢P11 45¢PH Journeyman 416.205 Foreman .6.955 Fillwrirhts 6.505 Hardwood Floor Layer 6.355 Shinglers 6.355 Power Saw D,perntors 6.355 2¢ per hour Apprenticeship Trainin€; Program 1¢ per hour Frometional Fund LATHERS: $6.15 a 40 250FH 550TH Foreman shall receive 54.00 per day above Journeyman's rate. Exp/8r "JA mss.Aid.334 TRADES IN LAILY SUB. 414.00 15¢ por mile $10.00 over LO miles 260 por mil travel pay 39.00 415.00 $9.00 +].0.00 SUNDAYS c -)VER - AND TIME FiW.'LTDAY5 Double Double Double Double Double Double Double Double Double Double First 4 hrs. 1 tin s. After 4 hrs. Double time. NEXT FAY RAISE 2-1-70 CC NTD.ACT EXF . DATE 7-31-12 10-1-70 7-31-71 6-1-70 6-16-71 Double 7-1-70 6-30-71 46.45 Base CL.'SSIFICAT CCN Page 2 CEMENT MASONS Foreman Jour neyman Suring Scaffold Magnesite 'r Composition Foreman, Magnesite WAIS PER HOUR $5.67 5.37 5.62 5.53 6.11 HOURS HOURS HEALTH Pat PFR AND DAY WEEK WELFARE moi" list 36¢ F11 VACATION PENiION DAILY SUNDAYS SUB. AND HOLIDAYS 50¢ PH 75¢ PH $9.60 Double Travel pay X5.00 per day over 45 miles IABORERS: GROUP I $4.925 8 40 306 PH 40¢ FE asphalt Ironers and (takers F,arko and Similar Type Tampers Buggymobile Chainsaw, Faller, Logloader and Bucker Concrete and Magnesite Mixer undr;r 1/2 yard Concrete Fan Wcrk Concrete. Saw (Walking type Crihbero and/or shoring Cut grnnite curb setters FrTm Raisers Headerbmrthmen, Huhsetters, Aligners Heavy Duty Vibrators with stingers over 4" Diameter Jackson and Similar Type Compactors Jackhammer Operators LagFi.ng, Sheeting, Whaling, Bracing, Trenehjacking, Band -guided lagEing harnrrer Magnesite and Mastic Workers (wet or dry) Mechanical Drillers -all types regardless of method if power other than those listed Pavement Breakers and Spadera Pipe Layers, Caulkers, Bander PipewrapT ers, Kettlemen, Potmen and Men Applying asphalt, Lay Kold C. eosote, Caustic (applying means applying, dipping or handling of such matersaLs. Post Hole Dirgera, Air, Gas ani Electric Power Broom Sweepers (Hand guided) Rip-rap-Stonepaver and Rock -slinger, including placing of sacked concrete (wet cr drY) Rotary Scarifier Roto and Ditch Witch (Hand -guided) Rotrtiller Sand B1astcr, s - Potmen Tank Cleaner or ham! type) 406 PH 0,00 Double East of Highway 49 For Details contact Laborers #73 in special Provisions and Similar type materials OVER- TIME First 2 hrs. lz. Double thereafter NEXT PAY RAISE 1-1-70 C ONIT.A GT EXP. DATE 6-15-71 1-1-7n 6-16-.71 CLASSIFICATION Page 3 LABORERS: GROUP I CONT'D, Tree Climbers WAGES PER HCUR $ .925 HCUIiS Harlts FN FET? DAY WEEK —g- 40 HEALTH VACATION AND PH Vibra-Screed Bull Float in connection with laborers' work. Also, 4¢ per hour for Training Program by Employer. GROUP IT $4.775 8 40 3o¢ PH llo¢ PH Asphalt Shrelers Cement Dumpor s Cboko-setter and Rigger (clearing work) ^,,ncrete Chipping and Grindirg oncrete Laborers (Wet or Dry) Driller's Helpers, Chuck Tenders, and/or Portable Bit arrr Tool Grinder, H ,peer Guinea Chaser (Stakeman) High Pressure Nozzleman-Hydrolic Monitor (over 100 pounds pressure) excluding levee work Loading and unloading, carrying and handling of all rods and materials for use in reinforcing Pittsburg Chipper, and similar type brush shredders Sloper Gypsum work (wet or dry) Also, 4¢ per hour for Training Program paid by FENSrION 140O PH 4a¢ FH E,ployer ORWP III $4.675 8 40 30¢ PH A 11 cleanup work of debris, grounds and buildings but not limited to street cleaners and initial Bridge Laborers Construction Laborers Dumpman -"".agmen ..atchmen Gardeners, Horticultural, and Landscape Laborers G ono rat Laborer Limbers, IJrush Loaders and Pilers Maintenance, Repair Trackmen and Read Beds (in tunnels, $0.125 Also, li¢ per hour fcr Training Frogram paid including, riir>dow cleaning OLAZIkRS; Journeyman Foreran $5.85 6.55 by Employer Lao¢ FH 40¢ FH per hour additional) B 40 15¢PH E3% 25¢ FH AAILY 6UNDAYS SUB.. AND HOLIDAYS $9.00 Double East of Hiehrrav 49 (For other details contact Laborers' Same concrete construction. Same Full Cost #73) Double CNER- T IME NETT CONTRACT TAY EXP. RAISE MTE 1/ 1-1-70 T71 1-1-70 6-15-71 Double lz 1-1-70 6-15-71 Double Double 1-1-70 7-1-72 r;LA0317ICATION Page 4 WAGES TEANImTERS PEis Ham DUMP TRUCK Under 4 yds. (Water Level) $5.215 4 yds. & under 6 yds. (WL) 5.31 6 yds. & under 8 yds. (WL) 5.51 8 yds. & inc. 12 yds. (WL) 5.75 Over 12 yds. & inc. 18 yds.WL 5.79 Ovor 18 yds. & inc. 24 yds.WL 5.895 Over 24 yds. & inc. 35 Yds.WL 5.95 35 yds. & inc. 50 ,yc(s.WL 6.10 over 50 yds. & inc. 65 yds.WL 6.25 65 ydo. & inc. 80 yds. WL 6.40 Over 80 yds. & inc. 95 yds.WL 6.55 Bulk Cement Spreader (W/or WO Auger) Dumperete Truck Skid Truck (Debris Box) Trucks (Dry Pre-Eatch Concrete Mix) Triple Headers Dry Distributor Truck (A footman when employed on such equipment, shall recrive the rate specified for the classifi- cation of Road Oil Trucks or Ilootman) Ammnwaa Nitrate Distributor driver and mixer 5.79 Combination dump truck and dump trailer 5.895 (When arty hoards or other apparatus are added to a dump truck for the purpose of increasing carrying capacity, the rate applicable to the increased carrying capacity shall be paid.) ALL TRANSIT MIX OR AGITATOR TRUCKS unr(or 6 yds 5.365 6 yds. / under 8 yds. 5.465 yds. through lO yds. 5.565 Over 10 yds. through 12 yds. 5,665 Ovcix 1 2 yds. through 14 yds. 5.765 Over 14 yds. through 16 yds. 5.895 Transit Mix with boom shall receive 122¢ per hour above the appropriate yardage classification rate of pay when the boom is used. HAIRS PER DAY 8 HAIRS PER WEEK HEALTH AND WELFARE 40 29¢ P11 Dental Care 10¢ PH Visual Care 4t0PH Pres. Drugs 5PH Retired H&W 1Q. PH VACATION PENSION DAILY SUB. 450FH 30¢ FE $10.00 Use Dump Truck Rate Use Dim Truck Rate Use Duma Truck Rat Use Dump Truck Rate Use Amp Truck Kate Plus 51.03 per shift sliN SAYS AND HOLIDATS Double OVER- TTMF 12 NEXT PAY RAISE 11-1-69 Add. to benefits 6-1-70 odd. t o wages CONTRACT IX?. DATE 6-1-73 Page 5 WAGES ECIRS HOURS HEALTH VACATION PENSION DAILY 5UNDAYS TEAiTETtS: PER PER PEE AND SUB. AND CI,;SSIr'IGATIONf{011ft DAY WICK WELFAREHOLIDAYS 8 40 29¢ W 45¢PH 300 PH $10.00 Double W!LTt 'IRUQ{S Dental Care10 PH Gallonage capacity shall he clearly indicated Visual Care 4 PH on a 11 Tanks Pres. Drugs 5PH Under 2,500 gals $5.325 Retired Ei&W 1¢ PH 2,500 & under 4,000 gals 5.425 11, 000 & under 5,000 gals 5.525 5,000 & under 7,000 gals 5.625 Jetting Truck (Use appropriate Water Truck Rate) DW 10+s, 20fs, 2118 and other similar Cat Type, Terra Cobra, LeTourneau Pulls, Tournorocker, Euclid and similar type equipment when pullin Aqua/Pak, water tank trailers and Fuel and/or Grease Tank trailers or other miscellaneous trailers 11.5.95 aACIJUM TRUCKS Under 3,500 gals 5.395 3,500 gals °,z under 5,500 5.475 5,500 gals & under 7,500 5.575 Nipper Truck (When Flat Rack Truck is used appropriate Flat Rack Rates shall apply) 5215 Concrete Pump Truck (When Flat Rack Truck is used appropriate Flat Rack Rates shall apply) 5.23.5 C oner et e Pump Machines 5.215 Scissor Truck 5.41 Helicopter Pilot 6.25 (When transporting men or r terials) Industrial Lift Truck (Mechanical Tailgate) Use appropriate Flat Rack Rate Dumpster or similar Type (use appropriate Yardage Rate of P .Y) llu,bber Tired Muck Car 5.)x65 (not self loaded) Rubber Tired Truck Jumbo 5.525 (Men regularly employed underground on tunnel work shall be paid $.1.00 per day premium for such work, nrovidod that such employment underground on tunnel work continues for at least (2) hours.) Lift' Jitneys & Fork Lift 5.315 Winch Truck & "A" Frame 5.525 Fuel ardor Crease Truck Driver or Fuelms n 5.38 Teamster Oiler and/or Creaser and/or Service Man 5.29 Tire Elepairman (Shall apply only where a full time employee of the contra.tor is assigned to the work 5.75 OvT'7c NEXT CalTRACT TIM PAY EXP. RAISE DARE 12 11-1-69 61- 71 add. t o halefits 6-1-70 add. t o wages F'aa.o 6 TEAMSTERS CLASSIFICPT TON: Truck RoTairman Truck Repairman Helper Single.Unit Flat Rack Sin€ao Unit Flat Rack Heavy Duty Transport Heavy Duty Transport Double Gooseneck Flcavy Duty Transport Tiller Comhi,ra tion Bootman Ma and Road Oiler 5.655 Road 0 i 1 Trucks or 13ootman 5.305 Heater Flamer ) Use appropriate rate Asphalt Burner ) Power Unit Searfier Burner ) Snow Buggies (Shall apply only where a full time employee of the of tho Contractor) 5.215 Snow Go and/or Plow 5.75 Slurry Truck (Use appropriate Dump Truck Fuel Island Attendant, or Combimtion Bit Attendant (Shall apply only where a full time of the Contractor) 5.38 Fire Guard (Whore a fu 11 time employee of the Contractm i s assigned to the work) Appropriate rate for the equipment utilized. Tilt Bed Trailer or Flat Bed Pull Trailers (122¢ per hour above rate fcr towing, Steam Cleaning (When an employee is assigned to this work an a full time basis) 5.215 Small Rubber Tired Tractor S.ltl (When used within Teamsters Jurisdiction) Combirntion Winch Truck with Hoist 51165 ]Hydro -lift or Swedish Crane Type (Includi.ng for jettirg) 5.525 Hydro lift extension or retracting orane (Boom type) 5.88 Bug rymobi 1 e 5.525 Ross llpster and similar straddle Carrier 5.555 WAIS HCURS HOURS HEALTH PER PER PER AND HOUR DAY WEEK WELFARE 71729¢ W Dental Care 10 711 $5.885 Visual Care 1.434P11 5.385 Pres.Druga 5.31 (Two axle unit)Retired H,eCW 1¢ PH 5.111 (3 axle unit) 5.53 (High Bed) 5.76 (Gooseneck Low Bed) 5.81 (7 or more axles) 5.81 for Hato) and/or Grease Rack VACATION PENSION DAILY SUB. 45¢ PH 30¢ FH $10,00 Contractor is and Fuel Island assigned to the work SUNDAYS AND HOLIDAYS Double OVER- TIME 12 at the sole discretion employee of tho Contractor is assigned to the work at the sole docretion when Swedish Crane is used unit) N1XT ?AY RAISE 11_1-69 add. to `.enofit s 6-1-70 add. to wages CONTRACT EXP. DATE 6-1-71 Page 6-4 WAGES HOURS TEAMSTERS PER PER CLASSIFICATION HOUR DAY 8 Self-Propelled Street Sweeper with self - contained refuse bin $5.75 P13. or similar type self - loading truck 5.85 Bus or Manhaul Driver 5.215 Escort or Pilot Car Driver 5.215 Pickup Trucks 5.215 Helpers 5.215 Hook Tenders (When doing work in Teamster jurisdiction, including loading and unloading 5.215 Team Drivers 5.215 Warehousemen 5.215 Warehouse Clerk Parts Man (Job site construction; is presently assigned to the work) 5.34 Truck Dispatcher (Shall apply only where a full time employee of the contractor is assigned to the work at the sole discretion of the contractor 5.60 HOURS HEALTH PER AND WEEK WELFARE 7CT 290 FH Dental CarelOf PH Visual Care 40PH Pres. Drugs 5ifFH Retired H&W 10 FH VACATION PENSION DAILY SUB. 450 PH 30g $10.00 SUNDAYS AND HOLIDAYS Double permanent yards where an employee covered by this Agreement OVER- TIME NEXT PAY RAISE 11-1-69 add. to be ne f it s 6-1-69 add. to wages CONTRACT EXP. DATE 7-1-71 Paye 7 WAGES HOURS HOURS HEALTH VACATION PENSION MILY SUNMYS OVER- NJ3X ' CONTRACT CIASSIFICATION PER PER rpt AND SUB. IND STM1 _1 V EXP. HAIR NK WEEK WELFARE IOLIDAYS RAISE ELECTRICIANSt 8 TO- 26# Ai 8% 3% $12.03 D,u�ule Double 12-1-69 ,31,].970 General Foreman 88.70 Eek is included Foreman 8.00 in wage scale) Journeyman (Inside & Line)6,96 Journeyman Cable Splicer , 7.83 Grouniman 5.22 Equipmont Operator 90% of Journeyman Rate Pll.F DRIVERS: 5 �t0 35¢ W 50¢. PE 45¢ p}[ (Refer t o Agreennnt) Double Double 6-16-70 6-15-71 Jour neyma n 56.34. Oarsman 7.09 Also, 1¢ per hour for I.pprenticeshxp Training Program by Employer SHEET 1VFTAI, tv3RKERS 8 110 36¢ FE; 75t PH 111¢ FH $12.50 Double Double 7-1-70 6-30-71 Journeyman $6.115 Foreman 7% Also, 10¢ per hour paid into an Industry Fund by Employer PLUMBERS: (8 except) 38 741 PH 75t FH 69¢ al $14.00 Double Double 7-1-70 6-30-71 Journeyman $7.22 Fri. - 6 hrs. (Includes Dental) Foreman 7.94 Also, 3¢ per hour into Apprenticeship Training Program by Employer SI'EAMFITTERS: (Identical to Plumbers) PAINTERS: 8 110 25$ PH 60¢ 11-1 $12.00 Double lz 7-1-70 6-30-71 Brush 85.62 501 per IT Paperhanger 5.92 increase Spray Fainter 5.92 Sheet Rock Taper 5.92 All wing Stage Work 5.92 Scaffolding (All iwork from scaffolds required to do surfaces of 32 feet or more 5.92 Sand Blasting and Steam Cleaning 5.92 Structural Steed. Painters 5.92 Foreman 5.97 CIASSIFICATION WAGES HQJRS HUJRS HEALTH VACATION PENSION DAB' SUNDAIS uvER- NEXT CONTRACT Page 8 PER PER FM AND sUB AND TIME MY EXP. H0[lA DAY WEERN WEIFARE O L W Y S RAISE DATE PIASTERPRSs 3 40 25¢ PH 50¢ P11$10.00 Double Double 1-1-70 7-1-13 Journeyman $5.911 over 70 miles Foreman shall receive $2.50 per day above 3oarnsyman rate. See Note below PIASTER HOD CAfl T l $4.575 8 110 30¢ PH 65¢ PH 40¢ FE See Note Below Double Double 1-1-70 6-30-73 NOTE: Subsistence Pay - 50 to 60 miles $5.00-60 to 70 miles $6.00-70 miles and over $10.00 ROOUR5s 8 i0 20¢ W 750 PH 1O FH $72.00 Double 1 2-2-70 8-1-70 Foreman $6+4 10¢ Check off Sub -Foreman 6.19 Journeyman, Slate, Tile Composition and Ruilt-up Men 5.94 Felt Machine Operator 6.19 Felt Machine Operator Helpers 6.09 SIEEI , War KER 3: 8 40 Reinforced $6.37 Structural 6.48 Ornamental tal 6.48 Fence Ereobnr 6.28 Foreman shall receive 115¢ per hour above classification he supervises. Note 2¢ per hour far Apprenticeship Training Program. 339 PH 25¢ Ptl 32i¢ PH $9.00 Double Double OPERATING ENGINEERS: (See Enclosed Scales) 11¢ per mile on jobs wer 35 miles. B-16-70 a GROUP No.11A $7.06 4221 Loader (over 12cu. yds., up to & incl, 18 cy) 6521 Rubber -Tired Multi -Purpose Earthmoving Machines (Two( 2 I units) (over 75 cy "struck" m.r.c. ) 5951 Power Shovels andDrag3ines (over 7 cu. yds. m.r.e.) (Assistant to Engineer required: an additional Assistant to Engineer is required if the Shovel or Dragline is electrically powered) 0461 Band Wagons (in conjunction with Wheel Excavator) 8991 Wheel Excavator (over750 cu. yds. per hr.) (Two ( 2 operators and One (1) Assistant to Engineer re- quired any additional assistance shall be by Assistant to Engineer) GROUP No_ 11B 4231 Loader (over 18 cu. yds.) GROUP Pio.11C 3491 Operator of Helicopter (whenused in erection work) 6231 Remote controlled earth moving equipment (No one operator shall operate more than two (2) pieces of earth -moving equipment at onetime) Straight Time Hauriq Naga Rates Effective Dates 1.1.69 6415-69 14-70 6-1570 1.1.71 $7.30 $7.59 $7.83 $8.12 $8.41 $1.22 $7.46 $7.76 $8.00 $8.30 $8,60 $7.37 $7.62 $7.93 $8.18 $8.49 $8.80 "EXHIBIT B" TO AVOID DUPLICATION OF LARGER ITEMS IN lflE FREMAGIC PLUS SYSTEM, ADDITIONAL BACKGROUND INFORMATION REGARDING THIS HEM IS LOCAIU) AS FOLLOWS: A s -- pa,.* o o►r iA) e 11 .33 i `g (E)t\r-a_ b L -E LLQ)