Loading...
HomeMy WebLinkAboutResolutions - No. 2005-38RESOLUTION NO. 2005-38 A RESOLUTION OF THE LODI CITY COUNCIL APPROVING USE PERMIT FILE NO. U-02-12, TO ALLOW THE CONSTRUCTION OF A COMMERCIAL SHOPPING CENTER IN THE C -S ZONE AND SALE OF ALCOHOLIC BEVERAGES AT THE WAL-MART SUPERCENTER, AND TENTATIVE PARCEL MAP 03-P-001, TO CREATE 12 PARCELS FOR THE PROJECT RELATING TO THE LODI SHOPPING CENTER WHEREAS, an application was filed by Browman Development Company for a commercial shopping center at 2640 W. Kettleman Lane more particularly described as Assessor's Parcel Numbers 058-030-08 and 058-030-02 and portion of 058-030-09; and WHEREAS, the application's are for the following approvals: Use Permits for the construction of commercial structures as required by the C -S Commercial Shopping District and for the safe of alcoholic beverages, as well as a Parcel map to create 12 parcels for the project; and WHEREAS, the Planning Commission of the City of Lodi has reviewed and considered the Final Environmental Impact Report prepared on the Lodi Shopping Center; and WHEREAS, the Planning Commission of the City of Lodi, after more than ten (10) days published notice, held a public hearing before said Commission on December 8, 2004; and WHEREAS, the Lodi City Council has reviewed and considered the approval of Use Permit File No. U-02-12, to allow the construction of a commercial shopping center in the C -S Zone and sale of alcoholic beverages at the Wal-Mart Supercenter, and tentative parcel map 03-P-001, to create 12 parcels for the project relating to the Lodi Shopping Center; and WHEREAS, the project is consistent with all elements of the General Pian. in particular, the'following Goals and Policies: A. Land Use and Growth Management Element, Goal E, `To provide adequate land and support for the development of commercial uses providing goods and services to Lodi residents and Lodi's market share." B. Land Use and Growth Management Element, Goal E, Policy 7, "In approving new commercial projects, the City shall seek to ensure that such projects reflect the City's concern for achieving and maintaining high quality." C. Land Use and Growth Management Element, Goal E, Policy 3, "The City shall encourage new large-scale commercial centers to be located along major arterials and at the intersections of major arterials and freeways." D. Housing Element, Goal C, "To ensure the provision of adequate public facilities and services to support existing and future residential development'. E. Circulation Element, Goal G, "To encourage a reduction in regional vehicle miles traveled." 11CvcadcOl \admin \Ca \CITY\ RES\Res 2005\Res2005-38.doc 1 F. Circulation Element, Goal A, Policy 1, `The City shall strive to maintain Level of Service C on local streets and intersections. The acceptable level of service goal will be consistent with financial resources available and the limits of technical feasibility." G. Noise Element, Goal A, "To ensure that City residents are protected from excessive noise," H. Conservation Element, Goal C, Policy 1, "The City shall ensure, in approving urban development near existing agricultural lands, that such development will not constrain agricultural practices or adversely affect the economic viability of adjacent agricultural practices." Health and Safety Element, Goals A, B, C, and D, "To prevent loss of lives, injury and property damage due to flooding." "To prevent loss of lives, injury, and property damage due to the collapse of buildings and critical facilities and to prevent disruption of essential services in the event of an earthquake." "To prevent loss of lives, injury, and property damage due to urban fires." "To prevent crime and promote the personal security of Lodi residents." Urban Design and Cultural resources, Goal C, "To maintain and enhance the aesthetic quality of major streets and publWcivic areas." WHEREAS, the design and improvement of the site is consistent with all applicable standards adopted by the City. Specifically, the project has met the requirements of the Lodi Zoning Ordinance with particular emphasis on the standards for large retail establishments; and WHEREAS, the design of the proposed project and type of improvements are not likely to cause public health or safety problems in that all improvements will be constructed to the City of Lodi standards; and WHEREAS, these findings, as well as the findings made within Resolution No. P.C. 04-64 certifying Final Environmental Impact Report EIR-03-01, are supported by substantial evidence in the record of this proceeding and before this body. NOW, THEREFORE, BE IT RESOLVED, DETERMINED, AND ORDERED as follows: 1. The foregoing recitals are true and correct. 2. Said Tentative Parcel Map complies with the requirements of the City Subdivision Ordinance, and the Subdivision Map Act. 3. Said Site Plan complies with the requirements of the Commercial Shopping (C- S) Zoning District. 4. The submitted plans, including site plot plan and architectural elevations for the major anchor building, for the project is approved subject to the following conditions. A. The approval of the Use Permit expires within 24 months from the date of this Resolution. Should any litigation be filed regarding this project, the time limit shown shall be tolled during the pendency of the litigation. Parcel Map 11Cvcadc011admin\Ca\CITYIRESIRes 20051Res2005-38.doc 2 conforming to this conditionally approved Tentative Parcel Map shall be filed with the City Council in time so that the Council may approve said map before its expiration, unless prior to that date, the Planning Commission or City Council subsequently grants a time extension for the filing of the final map, as provided for in the City's Subdivision Ordinance and the Subdivision Map Act. It is the developer's responsibility to track the expiration date. Failure to request an extension will result in a refilling of the Tentative Parcel Map and new review processing of the map. B. Prior to submittal of any further plan check or within 90 days of the approval of this project, whichever occurs first, the applicant shall sign a notarized affidavit stating that "I (we), , the owner(s) or the owner's representative have read, understand, and agree to implement all mitigation measures identified in the Final Environmental Impact Report for the Lodi Shopping Center and the conditions of the Planning Commission approving U-02-12 and 03-P-001." Immediately following this statement will appear a signature block for the owner or the owner's representative, which shall be signed. Signature blocks for the Community Development Director and City Engineer shall also appear on this page. The affidavit shall be approved by the City prior to any improvement plan or final map submittal. C. Prior to issuance of any building permit on the site, each building shall be reviewed by the Site Plan and Architectural Review Committee for consistency with this resolution as well as all applicable standards of the City. D. All applications for Site Plan and Architectural Review Committee consideration shall comply with the following conditions: 1. All buildings shall meet the required setbacks for the C -S zoning district. All buildings shall implement building elements and materials illustrated on the submitted elevation or otherwise consistent with the architectural theme presented on the submitted elevation of the major tenant building. 2. Submit a construction landscape plan consistent with the submitted conceptual landscape plan. The applicant shall also insure that the overall ratio of trees, including perimeter landscaping is equal to one tree for every four parking spaces. Further, said plan shall demonstrate that the City's requirement for parking lot shading is met. 3. The applicant shall select and note on all plans common tree species for the parking lot and perimeter areas from the list of large trees as identified in the Local Government Commission's "Tree Guidelines for the San Joaquin Valley". 4. All drive-through eating facilities shall have a "double service window" configuration and pullout lane to minimize auto emissions. 5. Cart corrals shall to be provided in the parking lot adjacent to Wal- Mart and distributed evenly throughout the lots rather than concentrated along the main drive aisle. In addition, a cart corral 11Cvcadc0l ladmin\Ca\CITYIRES\Res 20051Res2005-38.doc 3 shall be provided as close as possible to the two bus stop/shelters provided on-site. Further, cart corrals shall be permanent with a design that is consistent with the theme of the center. Portable metal corrals shall be prohibited. 6. Trash enclosures shall be designed to accommodate separate facilities for trash and recyclable materials. Trash enclosures having connections to the wastewater system shall install a sand/grease trap conforming to Standard Plan 205 and shall be covered. 7. Hardscape items, including tables, benches/seats, trashcans, bike racks, drinking fountains, etc. shall be uniform for all stores throughout the shopping center. 8. All signage shall be in compliance with a detailed Sign Program that shall be submitted to SPARC for review and approval with the first building plan review. 9. Said program shall require all signs to be individual channel letter at the standards provided by the zoning ordinance. 10. Any bollards installed in a storefront location shall be decorative in style and consistent with the theme of the shopping center. Plain concrete bollards, or concrete filled steel pipe bollards shall not be permitted. E. All landscaped area shall be kept free from weeds and debris, maintained in a healthy growing condition and shall receive regular pruning, fertilizing, mowing, and trimming. Unhealthy, dead, or damaged plant materials shall be removed and replaced within 30 days following written notice from the Community Development Director. F. The following items are conditions of approval for the vesting tentative parcel map, all to be accomplished prior to, or concurrent with, final parcel map filing unless noted otherwise: 1. Dedication of street right-of-way as shown on the parcel map with the following changes/additions: a} Street right-of-way dedications on Westgate Drive shall be in conformance with the traffic study for the project and City of Lodi requirements and shall be consistent with the West Side Facility Master Plan. The north and south legs of Westgate Drive must be in alignment through the intersection at Kettleman Lane. Construction of full width street improvements to and including the west curb and gutter is required. Acquisition of additional right-of- way from adjacent parcels to the west is the responsibility of the developer and must be supplied prior to recordation of any final parcel map. In the event the developer is unable to acquire the additional right-of-way from adjacent property owners, the project site plan and proposed parcel boundaries shall be modified to provide the required street right-of-way dedications within the boundaries of the map. 11CvcadcO1 \admin\Ca\CITYIRES1Res 20051Res20O5-38.doc 4 b) Right-of-way dedications on Lower Sacramento Road and Kettleman Lane shall be in conformance with the project traffic study and City of Lodi street geometric requirements for this project and to the approval of the Public Works Department and Caltrans. The right-of-way width and lane geometry for Kettleman Lane need to be compatible with the improvement plans prepared by Mark Thomas & Company for the Vintner's Square Shopping Center on the north side of Kettleman Lane. Right-of-way dedications on Kettleman Lane shall be made to Caltrans in conformance with their requirements. Separate parcels shall be created for Caltrans dedications. It should be anticipated that Caltrans will require street widening improvements west of the project boundary. Acquisition of any right-of-way necessary to meet Caltrans requirements shall be the responsibility of the developer. c) Lower Sacramento Road is an established STAA route and turning movements to and from the roadway into private driveways and intersecting streets are required to demonstrate that accommodation has been made for the truck turning movement in conformance with Public Works requirements. At the signalized intersection and the driveway immediately north, the right-of-way dedications and driveway design shall provide for 60 -foot radius truck turning movements as set forth in the Caltrans Highway Design Manual. d) The right-of-way dedication and driveway design at the south project driveway on Lower Sacramento Road shall accommodate and be in conformance with the California Semitrailer wheel track (18m160ft radius) turning template. e) Right-of-way dedications at all proposed project driveway locations shall be sufficient to accommodate the handicap ramps and public sidewalks at the crosswalk locations. In addition, the right-of-way dedication at the proposed traffic signal location on Lower Sacramento Road shall be sufficient to allow installation of the traffic signal improvements within the public right-of-way. 2. Dedication of public utility easements as required by the various utility companies and the City of Lodi, including, but not limited to, the following: a) An existing public utility easement (PUE) lies within the proposed Westgate Drive right-of-way. The existing PUE shall be abandoned and an equal replacement PUE conforming to City of Lodi requirements shall be provided immediately adjacent to and west of the west right-of-way line of Westgate Drive. Acquisition of the replacement PUE from adjacent parcels to the west is the responsibility of the developer and must be accomplished prior to recordation of any final parcel map. In the event the developer is unable to acquire the replacement PUE from adjacent property owners, the project site plan and proposed parcel boundaries shall be modified to provide the required PUE dedications within the boundaries of the map. \CvcadcOl \admin\Ca\CIN\RES\Res 2005\Res2005-38,doc 5 b) A PUE along the southerly property line sufficient to accommodate the installation of electric utility overhead transmission lines and underground conduit bank outside proposed landscape areas, and the extension of water, wastewater and industrial waste transmission lines between Lower Sacramento Road and Westgate Drive. We anticipate the required PUE along the south project boundary will be on the order of 65 to 75 feet. It may be possible to reduce the width of the PUE by realigning some of the pipes through the shopping center site. The actual alignment and width will be to the approval of the Public Works Department and City of Lodi Electric Utility. c) A PUE at the proposed signalized project driveway to accommodate the installation of traffic signal loops. d) A PUE at the existing southerly Sunwest Plaza (Food 4 Less) driveway to accommodate the installation of traffic signal loops. Acquisition of the PUE is the responsibility of the developer and must be accomplished prior to recordation of any final parcel map. 3. In order to assist the City in providing an adequate water supply, the property owner is required to enter into an agreement with the City that the City of Lodi be appointed as its agent for the exercise of any and all overlying water rights appurtenant to the proposed Lodi Shopping Center, and that the City may charge fees for the delivery of such water in accordance with City rate policies. The agreement establishes conditions and covenants running with the land for all lots in the parcel map and provides deed provisions to be included in each conveyance. Submit final map per City requirements including the following: a) Preliminary title report. b) Standard note regarding requirements to be met at subsequent date. 4. Payment of the following: a) Filing and processing fees and charges for services performed by City forces per the Public Works Fee and Service Charge Schedule. G. The following items are conditions of approval for the vesting tentative parcel map and use permit that will be deferred until the time of development: 1. Engineering and preparation of improvement pians and estimate per City Public Improvement Design Standards for all public improvements for all parcels at the time of development of the first parcel. Plans to include: a) Detailed utility master plans and design calculations for all phases of the development, including the proposed temporary storm drainage detention basin. Detailed utility master plans have not been developed for the area between Kettleman Lane on the north, Harney Lane on the south, Lower Sacramento Road on the east and the current General Plan boundary on the west. The project site is at the upstream boundary of the storm drain and wastewater utilities for this area. The developer's engineer shall provide 11CvcadcOl ladmin\Ca\CITYIRES1Res 20051Res2Q05-38.doc 6 detailed drainage master plans, including engineering calculations, for the entire area as well as all phases of the proposed project. City staff will assist in this process to the extent practicable. Should City staff be unable to meet developer's schedule, developer shall have the option to pay the City to contract for supplemental outside consultant services to expedite review and approval of the master planning work. b) Current soils report. If the soils report was not issued within the past three (3) years, provide an updated soils report from a licensed geotechnical engineer. c) Grading, drainage and erosion control plan. d) Copy of Notice of Intent for NPDES permit, including storm water pollution prevention plan (SWPPP). e) All utilities, including street lights and electrical, gas, telephone and cable television facilities. f) Landscaping and irrigation plans for street medians and parkway areas in the public right-of-way. g) Undergrounding of existing overhead utilities, excluding transmission lines. h) Installation of the proposed traffic signal at the main project driveway on Lower Sacramento Road. The traffic signal shall be designed to operate as an eight phase signal. i) Modification of the existing southerly Sunwest Plaza (Food 4 Less) driveway to widen the driveway to the south as shown on the site plan and construct a driveway return comparable to the existing driveway return. j) Installation/modification of the traffic signal at the Kettleman Lane/Westgate Drive intersection as required by the project. k) Traffic striping for Lower Sacramento Road, Westgate Drive and Ket#leman Lane. A complete plan check submittal package including all the items listed above plus engineering plan check fees is required to initiate the Public Works Department plan review process for the engineered improvement plans. 2. There is limited wastewater capacity in the wastewater main in Lower Sacramento Road. The area of the shopping center site containing the proposed Wal-Mart store lies outside the service area for the Lower Sacramento Road wastewater line. Developer shall perform a capacity analysis using flow monitoring protocols to assess the viability of utilizing the Lower Sacramento Road wastewater line on an interim basis. Wastewater facilities outside the Lower Sacramento Road service area shall be designed to allow future connection to the wastewater main in Westgate Drive. If the capacity analysis indicates that interim capacity in the Lower Sacramento Road wastewater line is not available, master plan wastewater facilities shall be constructed to serve the project. 11CvcadcOl ladmin\Ca\CITY\RES\Res 20051Res2005-38.doc 7 3. Installation of all public utilities and street improvements in conformance including, but not limited to, the following: a) Installation of all curb, gutter, sidewalk, traffic signal and appurtenant facilities, traffic control or other regulatory/street signs, street lights, medians and landscaping and irrigation systems. All improvements on Kettleman Lane shall be in conformance with City of Lodi and Caltrans requirements and require Caltrans approval. Additional right-of-way acquisition outside the limits of the map may be required and shall be the responsibility of the developer. b) The extension/installation of all public utilities, including, but not limited to, the extension of master plan water, wastewater, storm drainage and reclaimed water mains to the south end of Westgate Drive and the extension of water, wastewater and industrial waste transmission lines through the shopping center site from Lower Sacramento Road to Westgate Drive. The developer's engineer shall work with Public Works Department staff to resolve public utility design issues. c) Relocation of existing utilities, as necessary, and undergrounding of existing overhead lines, excluding electric (64 kv) transmission lines. d) Storm drainage design and construction shall be in compliance with applicable terms and conditions of the City's Stormwater Management Plan (SMP) approved by the City Council on March 5, 2003, and shall employ the Best Management Practices (BMPs) identified in the SMP. If bioswales are to be used, they need to be clearly delineated and detailed on the site plan and the landscape plan. Most trees are not compatible with bioswales. e) The lane configuration for Westgate Drive shall be consistent with the West Side Facility Master Plan. The street improvements will include a landscaped median and parkways. Improvements on Westgate Drive shall extend to and include the installation of the westerly curb and gutter. Acquisition of street, public utility and construction easements from the adjoining property may be necessary to allow this construction and shall be the responsibility of the developer. Street improvements for Westgate Drive shall be constructed from the signalized intersection on Kettleman Lane to the south boundary of the parcel map. f) Modification of the existing southerly Sunwest Plaza (Food 4 Less) driveway in conformance with the California Semitrailer wheel track (18m/60ft radius) turning template to accommodate northbound right turns. Acquisition of additional right-of-way and construction easements from the adjacent property to the south may be necessary to accomplish this work and shall be the responsibility of the developer. All public improvements to be installed under the terms of an improvement agreement to be approved by the City Council prior to development of the first parcel. 11CvcadcOl ladmin\Ca\CITYIRES1Res 2005\Res2005-38.doc 8 4. The proposed temporary storm drainage basin shall be designed in conformance with City of Lodi Design Standards §3.700 and must be approved by the City Council. Acquisition of property to accommodate the construction of the temporary drainage basin is the responsibility of the developer. All drainage improvements shall be designed for future connection to permanent public drainage facilities when they become available. If a temporary outlet from the drainage basin to the public storm drain system in Lower Sacramento Road is desired, developer's engineer shall contact the Public Works Department to coordinate this work with the City's mower Sacramento Road Widening Project. 5. A Caltrans encroachment permit is required for all work in the Kettleman Lane right-of-way, including landscape and irrigation improvements in the median and parkway along the site frontage. Based on past experience, Caltrans will only allow landscape and irrigation improvements within their right-of-way if the City enters into an agreement with Caltrans covering maintenance responsibilities for those improvements. The City is willing to execute such an agreement, however, the developer will be required to execute a similar landscape maintenance agreement with the City assuming the city's responsibilities for the landscape and irrigation improvements in the parkways. The City will accept maintenance responsibilities for all landscape and irrigation improvements in the median. 6. Design and installation of public improvements to be in accordance with City master plans and the detailed utility master plans as previously referenced above. Note that the developer may be eligible for reimbursement from others for the cost of certain improvements. It is the developer's responsibility to request reimbursement and submit the appropriate information per the Lodi Municipal Code (LMC) §16.40. 7. Parcels 1 through 12 are zoned C -S to allow development of a commercial shopping center. The following improvements shall be constructed with the development of the first parcel zoned for commercial development: a) Installation of all street improvements on tower Sacramento Road, Kettleman Lane and Westgate Drive. Street improvements for Lower Sacramento Road and Westgate Drive shall be constructed from the signalized intersections on Kettleman Lane to the south boundary of the parcel map. Street improvements along the frontages of Parcels 1, 12 and "A" shall extend to and include the installation of the westerly curb and gutter. b) Modification of the existing southerly Sunwest Plaza (Food 4 Less) driveway in conformance with the California Semitrailer wheel track (18m/60ft radius) turning template to accommodate northbound right turns. c) The extension/installation of all public utilities necessary to serve the commercial development and/or required as a condition of development. \CvcadcOl \admin\Ca\CITY\RES\Res 20051Res2005-38.doc 9 d) Temporary storm drainage detention basin to serve the project. B. Acquisition of street right-of-way, public utility easements and/or construction easements outside the limits of the map to allow the installation of required improvements on Kettleman Lane, Lower Sacramento Road and Westgate Drive. 9. Abandonment/removal of wells, septic systems and underground tanks in conformance with applicable City and County requirements and codes prior to approval of public improvement plans. Payment of the following: a) Filing and processing fees and charges for services performed by City forces per the Public Works Fee and Service Charge Schedule. b) Development Impact Mitigation Fees per the Public Works Fee and Service Charge Schedule at the time of payment and as provided by Resolution 2004-238 adopted by the City Council on November 3, 2004. c) Wastewater capacity fee at building permit issuance. d) Reimbursement fees per existing agreements: I. Reimbursement Agreement RA -02-02. The reimbursement fee for 2004 is $32,307.78. The fee is adjusted annually on January 1. The fee to be paid will be that in effect at the time of payment. II. The Vintner's Square shopping center on the north side of Kettleman Lane is currently under construction. We anticipate that the developer of the Vintner's Square project will submit a request for reimbursement in conformance with LMC 16.40 Reimbursements for Construction covering public improvements in Kettleman Lane and Westgate Drive constructed with that development which benefit the Lodi Shopping Center project when the Vintner's Square improvements are complete. Upon submittal, the reimbursement agreement will be prepared by City staff and presented to the City Council for approval. Any reimbursement fees approved by the City Council that affect the Lodi Shopping Center site will have to be paid in conjunction with the development of the first parcel. e) Reimbursement to the City for the installation and/or design costs for the following improvements to be included in City's Lower Sacramento Road project: I. Installation of 10 -inch water main and storm drain lines, including appurtenant facilities, in Lower Sacramento Road in conformance with LMC §16.40 Reimbursements for Construction. II. Water, wastewater and storm drain stubs to serve the shopping center project. III. Any other costs associated with changes/additions necessary to accommodate the Lodi Shopping Center project, including, but not limited to, any utility alignment changes for public utilities to be 11CvcadcOl \admin\Ca\CITYIRES\Res 20051Res2005-38.doc 10 extended through the site and the proposed dual northbound left turn lanes and conduit crossings for the traffic signal improvements at the main shopping center driveway. f) The project shall contribute its fair share cost to the installation of a permanent traffic signal at Lower Sacramento Road and Harney Lane. Until the intersection improvements are made and traffic signals are installed, the project applicant shall contribute its fair share cost for the installation of a temporary traffic signal with left -turn pockets on all four approaches to the Lower Sacramento Road/ Harney Lane intersection. The above fees are subject to periodic adjustment as provided by the implementing ordinance/resolution. The fee charged will be that in effect at the time of collection indicated above. 10. Obtain the following permits: a) San Joaquin County well/septic abandonment permit. b) Caltrans Encroachment Permit for work in Caltrans right-of-way. 11. The City will participate in the cost of the following improvements in conformance with LMC §16.40 Reimbursements for Construction: a) Master plan storm drain lines. b) Master plan water mains. c) Master plan reclaimed water mains d) Industrial waste Please note that construction of master plan wastewater facilities to serve the project site is not included in the City's Development Impact Mitigation Fee Program and is not subject to impact mitigation fee credits for sewer facilities or reimbursement by the City. H. Install fire hydrants at locations approved by the Fire Marshal. I. Shopping carts shall be stored inside the buildings or stored in a cart storage area adjacent to the entrance of the building. J. No outdoor storage or display of merchandise shall be permitted at the project unless a specific plan for such display is approved by SPARC. At no time shall outdoor storago or display bo allowed within the parking area, drive aisle or required sidewalks of the center. K. Vending machines, video games, amusement games, children's rides, recycling machines, vendor carts or similar items shall be prohibited in the outside area of all storefronts. The storefront placement of public telephones, drinking fountains and ATM machines shall be permitted subject to the review and approval of the Community Development Director. L. All storage of cardboard bales and pallets shall be contained within the area designated at the rear of the Wal-Mart building for such use. No storage of cardboard or pallets may exceed the height of the masonry enclosure at any time. 1 \Cvcadc0I \admin \Cc \CITY\RESI Res 2005tRes2005-38,doc 11 M. The loading area shown in front of the Wal-Mart building shall be stripped and posted with "NO PARKING — LOADING ONLY" signs to the satisfaction of the Community Development Director. N. A photometric exterior lighting plan and fixture specification shall be submitted for review and approval of the Community development Director prior to the issuance of any building permit. Said plans and specification shall address the following: 1. All project lighting shall be confined to the premises. No spillover beyond the property line is permitted. 2. The equivalent of one (1) foot-candle of illumination shall be maintained throughout the parking area. O. Exterior lighting fixtures on the face of the buildings shall be consistent with the theme of the center. No wallpacks or other floodlights shall be permitted. All building mounted lighting shall have a 90 -degree horizontal flat cut-off lens unless the fixture is for decorative purposes. P. All parking light fixtures shall be a maximum of 25 feet in height. All fixtures shall be consistent throughout the center. Q. All construction activity shall be limited to the hours of 7:00 a.m. to 6:00 p.m. Monday through Saturday. No exterior construction activity is permitted on Sundays or legal holidays. R. Prior to the issuance of a building permit for the new Wal-Mart Supercenter, the applicant shall ensure one of the following with respect to the existing Wal-Mart building located at 2350 West Kettleman Lane ("Building"): a) The owner of the Building shall have entered into signed lease(s) with bona -fide tenant(s) for at least 50% of the Building square footage (not including the fenced, outdoor garden center). The signed lease(s) required hereunder shall include a lease(s) with a bona -fide retailer(s) or restaurant for a minimum of two-thirds of the Building frontage (not including the fenced, outdoor garden center); or b) The owner of the Building shall have entered into a fully executed purchase agreement for the Building with a bona -fide retailer; or c) The Applicant shall present to the City a cash escrow account, subject to the approval of the City Attorney, which account shall be for the purpose of securing applicant's obligation to demolish the Building not later than 90 days after the opening to the general public of the new Wal-Mart Supercenter (the "Opening Date"). The amount of the deposit shall be equal to the City estimated reasonable costs to demolish the Building (based on a licensed contractor estimate) plus $100,000. The escrow account shall be paid to City in the event that Option (a), (b) or (c) is not satisfied within 90 days of the Opening Date. if Option (a), (b) or (c) is satisfied within 90 days after the Opening Date, the cash in the escrow account shall be refunded in full to the Applicant. 11Cvcadc011admin\Ca\CITY\RES\Res 20051Res2005-38.doc 12 If the Applicant does not satisfy this condition under Option (a), (b) or (c) within 90 days after the Opening Date, the City shall use the funds to demolish the Building with any balance reverting to the City as compensation for its expense and inconvenience incurred to demolish the Building. The owner of the Building shall present evidence that any lender on the Building consents to the demolition in a form subject to the approval of the City Attorney. This condition shall be recorded against the property as a deed restriction, which runs with the land. Applicant and Wal-Mart agree to enter into any agreements that are necessary in order to implement this condition. S. No materials within the garden or seasonal sales area shall be stored higher than the screen provided. T. Wal-Mart shall operate and abide by the conditions of the State of California Alcoholic Beverage Control license Type 21, off sale -general. U. Wal-Mart shall insure that the sale of beer and wine does not cause any condition that will result in repeated activities that are harmful to the health, peace or safety of persons residing or working in the surrounding area. This includes, but is not limited to: disturbances of the peace, illegal drug activity, public drunkenness, drinking in public, harassment of passerby, assaults, batteries, acts of vandalism, loitering, illegal parking, excessive or loud noise, traffic violations, lewd conduct, or police detention and arrests. V. This Use Permit is subject to periodic review to monitor potential problems associated to the sale of alcoholic beverages. W. Prior to the issuance of a Type 21 license by the State of California Alcoholic Beverage Control Department, the management of the Wal-Mart store shall complete the Licensee Education on Alcohol and Drugs (LEAD) as provided by the State Alcoholic Beverage Control Department. In the event that Wal- Mart has training that is equivalent to the LEAD program, such documentation shall be submitted to the Community Development Director for review and approval. X. The project shall incorporate all mitigation measures as specified in the adopted Final Environmental Impact Report EIR-03-01 for the project. Y. The submitted Use Permit, Parcel Map and associated plot plan are hereby approved subject to the conditions set forth in this resolution. Z. No variance from any City of Lodi adopted code; policy or specification is granted or implied by the approval of this Resolution. AA. The sliding gates that are shown in the rear of the Wal-Mart building shall have a knox box system at each gate for Fire Department access. BB. Buildings, which are fire sprinkled, shall have Fire Department connections within 50 feet of a fire hydrant, subject to the Fire Marshall's approval. CC. Fire lanes shall be identified per Lodi Municipal Code 10.40.100 and marked in locations specified by the Fire Marshall. Ail fire lanes shall be a minimum of 24 -foot -wide. 11Cvcadc01 \admin\Ca\CITY\RES\Res 20051Res2005-38,doc 13 DD. The water supply for the project shall meet the requirements for fire hydrants and fire sprinkler demand and system approved by the Fire Marshall. EE. Developer shall pay for the linkage study that the City is required to do based on Program 11 of the recently adopted Housing Element of the General Plan. The developer shall receive a credit for the amount paid against the final fee as adopted by the City Council. FF. Wal-Mart shall provide proof of sale, to a non Wal-Mart related entity, of the existing Wal-Mart property located at 2350 W. Kettleman Lane prior to the issuance of the building permit for the new Wal-Mart Supercenter without condition on the right of purchaser to lease or sell the existing Wal-Mart building. 5. The City Council certifies that a copy of this Resolution, and Final Environmental Impact Report are kept on file with the City of Lodi Community Development Department, 221 West Pine Street, Lodi, CA 95240. Dated: February 16, 2005 I hereby certify that Resolution No. 2005-38 was passed and adopted by the City Council of the City of Lodi in a regular meeting held February 16, 2005, by the following vote: AYES: COUNCIL MEMBERS — Hansen, Hitchcock, Johnson, and Mounce NOES: COUNCIL MEMBERS — None ABSENT: COUNCIL MEMBERS — None ABSTAIN: COUNCIL MEMBERS — Mayor Beckman SUSAN J. BLACKSTON City Clerk 2005-38 \\Cvcadc01 \admin\Ca1CITY\RES\Res 2005\Res2005-38.doc 14