HomeMy WebLinkAboutAgenda Report - March 6, 1996 (61)AGENDA TITLE: Contract Change Orders for Civic Center Improvements (Phase II), City Hall Remodel MEETING DATE: March 6, 1996 PREPARED BY: Public Works Director RECOMMENDED ACTION: This item is for information only. No action is required. BACKGROUND INFORMATION: In accordance with the Contract Change Order Policy adopted by Resolution 85-173, change orders over an aggregate total of $25,000 are approved by the City Manager and reported to the City Council at its regular meeting. The attached summary shows all change orders that have been approved for the Civic Center Improvements (Phase II), City Hall Remodel project. Included in the summary are the change order numbers, a very brief description of each, the amount of the change order with additions and deductions in separate columns, and the total contract cost to date. The change orders approved since the last Council Communication are highlighted. More detailed descriptions of each change order are available in the Public Works office. The original contract for this project was $1,853,310. The total cost of all change orders to date is $105,166, or approximately 5.7 percent of the contract. The project is now 70 percent complete and on schedule. An update of this summary will be submitted to the Council as additional change orders are approved. FUNDING: There are sufficient funds budgeted in the Civic Center Improvement (Phase II), City Hall Remodel account to cover these change orders. pl�' Nktv'; \_ ` n,, Jack L. Ronsko Public Works Director Prepared by Sharon Blaufus, Administrative Assistant JLR/SB/Im Attachment cc: Building and Equipment Maintenance Superintendent Contract Construction Inspector APPROVED: % H. Dixon Flynn -- Ci Manager CCCO2.DOC 02/27/96 Page 1 SUMMARY OF CONTRACT CHANGE ORDERS CIVIC CENTER IMPROVEMENTS, PHASE II Change Order Number I Description Add Deduct Total Contract ORIGINAL CONTRACT $1,853,310 1-17 MISCELLANEOUS ITEMS TOTALING < $25,000 $25,257 ($829) $1,877,738 18 DEMOLISH BASEMENT COLUMN FOOTING $2,144 $1,879,882 19 STEEL GIRDER STRAP BOLTS $112 $1,879,994 20 STEEL STRAP AT BASEMENT JOISTS $195 $1,880,189 21 ADDED HDBA ANCHORS $341 $1,880,530 22 ADDED STUD WALL C ROOM 314 $389 $1,880,919 23 NEW ROOF HATCH $681 $1,881,600 24 TRUSS CORD REPAIR $236 $1,881,836 25 2ND FLOOR FRAMING @ NE END $100 $1,881,936 26 NAILERS AT EXISTING STEEL BEAM $1,168 $1,883,104 27 STRAP 2ND FLOOR FRAMING $797 $1,883,901 28 CASED OPENING Q ROOM 208 $258 $1,884,159 29 ADDED BEAMS TO ROOF TRUSS $1,855 $1,886,014 30 3X4 STEEL ANGLE AT BASEMENT $1,1121 $1,887,126 31 STEEL WEB STIFFINERS @ 1ST FLOOR $563 $1,887,689 32 ADDED DEMOLITION AT BASEMENT $5,470 $1,893,159 33 EXTERIOR LIGHTS ON 2ND FLOOR $1,363 $1,894,522 34 MECHICAL WELL WALL SUTCCO FINISH $685 $1,895,207 35 HIP BEAM SUPPORT @ 4 LOCATIONS $1,138 $1,896,345 36 ADDED WALL BLOCKING $617 $1,896,962 37 EXTRA DEPTH FOR ELECT SERVICE TRENCH $1,002 $1,897,964 38 ADDED PLYWOOD @ 2ND FLOOR BATHS $2,153 $1,900,117 39 1ST FLOOR JOIST REPAIRS $834 $1,900,951 40 MECH DUCT SHAFT STRUCTURAL CHANGE $6,050 $1,907,001 41 ANCHOR STEEL BEAM- OFFICE 217 $667 $1,907,668 42 ADD PLYWOOD SOME LOCATIONS 1 ST FLOOR TO MEET CODE $4,204 $1,911,872 43 FURRED WALLS OFFICE 115 $1,235 $1,913,107 44 FRAMING 1 ST FLOOR ELEVATOR ALCOVE $436 $1,913,543 45 DEMOLITION OF BASEMENT WALLS $4,402 $1,917,945 46 EXIST 8" LINE AT MECHICAL WELL $291 $1,918,236 47 ISTRUCTURAL FRAMING CLIPS/STRAPSS $452 $1,918,688 48 HANGERS/CLIPS AT 1ST FLOORPOSTS $254 $1,918,942 49 1ST FLOOR FLOOR JOIST REPAIR $268 $1,919,210 50 CONCRETE WALL HEADER DETAIL $148 $1,919,358 51 SHEET METAL @ PERIMETER WALLS IN RETURN AIR PLENUM $1,190 $1,920,548 52 MECHICAL WELL WALL PREP WHERE FOOTING DEMO $689 $1,921,237 53 NEW PAPER TOWEL DISPENSER $228 $1,921,465 54 SIDE LIGHT AT DOOR 18 $281 $1,921,746 55 ADDED WALL INSULATION $602 $1,922,348 56 REVISE BASEMENT HALL CEILING $70 $1,922,418 57 DEMOLITION OF EXISTING BLOCKING $2,336 $1,924,754 58 DELETE ASPHALT SEAL COAT ($1,050) $1,923,704 Sub -total $72,273 ($1,879) $1,923,704 Page 1 SUMMARY OF CONTRACT CHANGE ORDERS CIVIC CENTER IMPROVEMENTS, PHASE II Change Order Number Description Add Deduct Total Contract ..1>::.}.::t:::.ist::...:'..}; v N.rf ' ,.... .. ....... }.f 2:42?•ti::>'ri•2}:%r%{;:':tii:1:$:i}:444:•:S'ri:2;{•is4:{4:4:•:Ci;,Y{4;v:;v'.�•}}}}X.}y„}:Sii i$riiri:{:-S:{:ry?+r{.:....... �....:.. :T... 4...} w.7r::•}i•r�:t4} ,):43�:1:$ :L .,.:... ).. ..3.?:., 4:.. h.t2224;•Y:.Sx:s}:?222:>;{::2;•Y:a?:•l:4xt•5:4�..::;}>::$�:%{:;:2Y,.Y>Yr.2::2f:$}>}:::}:•T•?.t•:>:}:2::.'<'":.c:.� . ..4'•�}::.4•Y:$: `+t.:o:>,.:.v....::::..... • •v •v .; v•. N.. A:22:$:2::::2:$:22::<:::$::Y::%.>:22:.24:{:.:>.$:22:::::;a:;.:::<;>:;;::>«:: <::::2:$ ..h....?..{.. ;.a.. 4: ..:...:.::.:...t.........4...:.>.,...>.{...:.{.....,...}.{.....,..,. }.h ::. :.}: ::?.:: :..:.. ., -:.f �.:::...:<: 2 h'NJ •j:{:J:}}i}Y.l'friril:4}l:i- 4%22�• S.......1..}...... x.45.. .. �ywY['�'1:{.}::� :>:i4i. : �.'::,�►.�!y�<'i:-'•.' � X. :;J'.: �:4}::4:4'.}r}:.>'. may � • �;V'• >�,j(I��< 'Ti:;:. v- �. i4. .. }i:�.F + � � TC•.......... ZY.'.�..... .......,I �-0n.... �... .,,:j:ti2:'n'•���h�.. �.vl,. .:.>.i:.{•.''Y.v:{ 2;.t%}:v';:. r... v.: �£,4 - +i. •:> ., , r . ., v...:: vv:: vnv:.:v :.:.v :-::.''. _:v:4':..4.v:::.. .......... :..... ............. .. .... ... ... . ..... . ... �. v: i:.i:{.}>. ;3�{.fir nS:. .. .: ..,. .v, +. ,: •j;::.:.: 4,{..isn:;r....:,.:.:.}.-.-:n}>i}:{.�J.}:t:!i.S:y.}.}:ry}:4Y::i.....<........... :v v.v: Fm:.,:i.. m}.:.. {. :.... }.:}:a}:tY.Y.'v 3n:v'2:+,.:: {2.,:{::2.Y ::25:{?}.'::\•2:: •r:t. :ii'y:sb ^:} {:':2:r:• t:i:}:}:22:4:: r:.{n: v;{?•;v �{.•v, ri:%:$: .:.b:r:.. C.:{:n• ;by: :r: �'ti;}::li :•J2: j •.....n.: i•}.4%f:%>: ;• .} :.r '.: :. •r:y�:v :: :. .::.: : :. v. 4 ..':. � .. � ..}.. .%:?}::?$$$}i2}f:f;i....} :$ :r}:>:4:2:$:>i:....4. v . +.�!;F.? :4$•: :I. ::�.. /y..#7:; : �EL}� -. i',Y9 i::'{:$i%:x:$$i'.:f$ci{i$%2; ' R:%ir ii::;':3%:i2'c}'•}`2:}':+'}i>�4: .J, 44 24.:iR:4:44{4: ,: • :{: • 4;♦{:? .:::::• •. w: ,:vJ v.,.:}v: ..4}:: }.O:ti%h;^}S:{.:C}%{?r-.}Sn' } 4.t•rv..5:•n.T:'$$):0::?:2::::•,:$�4�::i:t:-v-::i::{C:::... t. .; . .. ..... ,. }.4.... nC.v. .. :.. ... JJi%{T ':4"}}":ri$t+i.S:S : 22::t:%$%:;2:jj;:i�$$>:�:j:J:::$:i:':Y'•}Y•f.}}:'•i.i:}}'}J}:�2:2:: ::: ... .nn. .........: n... ,.YA.:. :. ... ., .:: .; :...,. :. .,: .; : . ' • .. : ........... ..Y ..rbt.. v:nk:v. ,.>. J. r:1A.r:,.4.{.1.4:.., iVi.t...n:, ..n..v.. .: ............. ,......................................:...............<::: }:2:::ThY4}ii }}:v'?4. '..: �: ....... ......%+$$$$%:iT}Y.S•}..{ .r};ii:2{•..... . :...� .,.v: }.� �:: Sub-total $107,045 ($1,879) $1,958,476 NET CHANGES $105,166 Page 2