HomeMy WebLinkAboutAgenda Report - February 7, 1996 (75)AGENDA TITLE: Contract Change Orders for Civic Center Improvements (Phase II), City Hall Remodel MEETING DATE: February 7, 1996 PREPARED BY: Public Works Director RECOMMENDED ACTION: This item is for information only. No action is required. BACKGROUND INFORMATION: The attached summary of contract change orders for the Civic Center Improvements (Phase 11), City Hall Remodel project is being given in accordance with the Contract Change Orders Policy adopted by Resolution No. 85-173. A copy of this policy is also attached. The change orders listed are those over an aggregate total of $25,000, which under the change order policy must also be approved by the City Manager and shared with the City Council. The summary shows the change order number, a very brief description of the work, the amount of the change order with additions and deductions in separate columns, and the total contract cost to date. More detailed descriptions of the change orders are available in the Public Works office. Because of the nature of the project, many of these change orders are very small but are processed individually to account for every change. The original contract was $1,853,310. The total cost of all change orders to date is $70,394, or approximately 3.8% of the contract. An update of this summary will be submitted to the Council as additional change orders are approved on this project. FUNDING: There are sufficient funds budgeted in the Civic Center Improvement (Phase II), City Hall Remodel account to cover these change orders. Jack`s. Ronsko Public\Works Director Prepared by Sharon Blaufus, Administrative Assistant JLR/SB/Im Attachments cc: Building and Equipment Maintenance Superintendent Contract Construction Inspector APPROVED: CCCO.DOC H. Dixon Flynn -- City Manager 01125196 Page 1 SUMMARY OF CONTRACT CHANGE ORDERS CIVIC CENTER IMPROVEMENTS, PHASE 11 Change Order Number I Description Add Deduct Total Contract ORIGINAL CONTRACT $1,853,310 1-17 MISCELLANEOUS ITEMS TOTALING < $25,000 $25,257 ($829) $1,877,738 18 DEMOLISH BASEMENT COLUMN FOOTING $2,144 $1,879,882 19 STEEL GIRDER STRAP BOLTS $112 $1,879,994 20 STEEL STRAP AT BASEMENT JOISTS $195 $1,880,189 21 ADDED HD8A ANCHORS $341 $1,880,530 22 ADDED STUD WALL ROOM 314 $389 $1,880,919 23 NEW ROOF HATCH $681 $1,881,600 24 TRUSS CORD REPAIR $236 $1,881,836 25 2ND FLOOR FRAMING C NE END $100 $1,881,936 26 NAILERS AT EXISTING STEEL BEAM $1,168 $1,883,104 27 STRAP 2ND FLOOR FRAMING $797 $1,883,901 28 CASED OPENING 0, ROOM 208 $258 $1,884,159 29 ADDED BEAMS TO ROOF TRUSS $1,855 $1,886,014 30 3X4 STEEL ANGLE AT BASEMENT $1,112 $1,887,126 31 STEEL WEB STIFFINERS Q 1ST FLOOR $563 $1,887,689 32 ADDED DEMOLITION AT BASEMENT $5,470 $1,893,159 33 EXTERIOR LIGHTS ON 2ND FLOOR $1,363 $1,894,522 34 MECHICAL WELL WALL SUTCCO FINISH $685 $1,895,207 35 HIP BEAM SUPPORT Q 4 LOCATIONS $1,138 $1,896,345 36 ADDED WALL BLOCKING $617 $1,896,962 37 EXTRA DEPTH FOR ELECT SERVICE TRENCH $1,002 $1,897,964 38 ADDED PLYWOOD Q 2ND FLOOR BATHS $2,153 $1,900,117 39 1 ST FLOOR JOIST REPAIRS $834 $1,900,951 40 MECH DUCT SHAFT STRUCTURAL CHANGE $6,050 $1,907,001 41 ANCHOR STEEL BEAM- OFFICE 217 $667 $1,907,668 42 ADD PLYWOOD SOME LOCATIONS 1 ST FLOOR TO MEET CODE $4,204 $1,911,872 43 FURRED WALLS OFFICE 115 $1,235 $1,913,107 44 FRAMING 1 ST FLOOR ELEVATOR ALCOVE $436 $1,913,543 45 DEMOLITION OF BASEMENT WALLS $4,402 $1,917,945 46 EXIST 8" LINE AT MECHICAL WELL $291 $1,918,236 47 STRUCTURAL FRAMING CLIPS/STRAPSS $452 $1,918,688 48 HANGERS/CLIPS AT 1ST FLOORPOSTS $254 $1,918,942 49 1ST FLOOR FLOOR JOIST REPAIR $268 $1,919,210 50 CONCRETE WALL HEADER DETAIL $148 $1,919,358 51 SHEET METAL @ PERIMETER WALLS IN RETURN AIR PLENUM $1,190 $1,920,548 52 MECHICAL WELL WALL PREP WHERE FOOTING DEMO $689 $1,921,237 53 NEW PAPER TOWEL DISPENSER $228 $1,921,465 54 SIDE LIGHT AT DOOR 18 $281 $1,921,746 55 ADDED WALL INSULATION $602 $1,922,348 56 REVISE BASEMENT HALL CEILING $70 $1,922,418 57 DEMOLITION OF EXISTING BLOCKING $2,336 $1,924,754 58 DELETE ASPHALT SEAL COAT ($1,050) $1,923,704 Totals $72,273 $1,879 $1,923,704 Page 1 CITY OF LODI POLICIES AND PUBLIC WORKS DEPARTMENT PROCEDURES ADMINISTRATION - 4.1 1 CONTRACT CHANGE ORDERS I Rev. 7/13/90 PURPOSE To establish formal policy and procedures to govern contract change orders. POLICY Definition As used in this policy, a change order shall mean a written order to change the amount of work to be done on a formal contract awarded by the City Council which is anticipated to result in an increase or decrease in contract price. Change orders may not increase or change the scope of the project specified in the contract plans and specifications approved by the City Council. Department Head Authority The responsible Department Head shall be authorized to approve and issue individual change orders to increase the contract price up to $5,000 or 10% of the formal contract, whichever is larger. The aggregate total of all change orders to each contract may not exceed $25,000. Authority of the City Manager The City Manager may authorize change orders in excess of 10% of the formal contract or in excess of $25,000 to avoid extraordinary delay of work or to protect the safety of human life and the environment at or near the work site. The City Manager shall report the change orders and the amounts to the City Council at its next regular meeting. PROCEDURE Written change orders shall be submitted to the Finance Department to be added to the construction contract and encumbered against the specific appropriation prior to payment to the contractor. In the event unencumbered funds are not available, a special allgq tiog? must be processed to increase the applicable appropriation. ack . Ronsko ubli Works Director Approved by City Council 12/4/85 Resolution No. 85-173