Loading...
HomeMy WebLinkAboutResolutions - No. 78-59CITY OF LODI PUBLIC WORKS DEPARTMENT HAM LAI\E WATER MAIN EXTENSION HAM LANE COST OF WATER MAIN EXTENSION 1422 LF 8" Water Main 78 LF 6" Water Main 5 EA 8" Valve 2 EA 6" Valve 2 EA Blowoff COST OF WATER MAIN/Front Foot $1 2,818.30 2488 LF REIMBURSEMENT CHARGE @ $ 6.50/LF @ $ 5.00/LF @ $250.00/EA @ $175.0%A @ $210.00/EA Engineering & Administration (10%) = $5.15 / LF COST ESTIMATES FOR REIMBURSEMENT $ 9,243.00 $ 390.00 $ 1,250.00 $ 350.00 $ 420.00 $1 1,653.00 $ 1,165.30 $12,818.30 2488 LF x $5.15 = ($12,813.20) $12,815.00 ow" CITY OF LoRr. HAM LANE PUBLIC WORKS DEPARTMENT WA TEI'MAIN EX TEA/ 5/ ON LI / Drown LALO_ Checked j -k347. '75 SC 7j7 . . • TOKAY HIGH SCHOOL_ line" _e Q1 740 /03 .0'74 0/04 • Rizi-Mbeir-Sczentzi----)1---chirrr-srtz .:5J5 ,r car 73 / / P:•:"or774--footcycz7charyz:.1. N T CIRY No Revised By Approved By Public Works Director RCE 17509 &--)C1-1713IT_ VV cr-t-ez r- " Lintz E. ›c"-frI1S#QPJ FC'ez r-sc rm t. IA. r-Tz tzirlerrt" ija. forgot row... ••••• CO.