HomeMy WebLinkAboutResolutions - No. 78-59CITY OF LODI
PUBLIC WORKS DEPARTMENT
HAM LAI\E
WATER MAIN EXTENSION
HAM LANE
COST OF WATER MAIN EXTENSION
1422 LF 8" Water Main
78 LF 6" Water Main
5 EA 8" Valve
2 EA 6" Valve
2 EA Blowoff
COST OF WATER MAIN/Front Foot
$1 2,818.30
2488 LF
REIMBURSEMENT CHARGE
@ $ 6.50/LF
@ $ 5.00/LF
@ $250.00/EA
@ $175.0%A
@ $210.00/EA
Engineering & Administration
(10%)
= $5.15 / LF
COST ESTIMATES
FOR
REIMBURSEMENT
$ 9,243.00
$ 390.00
$ 1,250.00
$ 350.00
$ 420.00
$1 1,653.00
$ 1,165.30
$12,818.30
2488 LF x $5.15 = ($12,813.20) $12,815.00
ow"
CITY OF LoRr. HAM LANE
PUBLIC WORKS DEPARTMENT WA TEI'MAIN EX TEA/ 5/ ON
LI
/
Drown LALO_
Checked j -k347.
'75
SC 7j7
. . •
TOKAY HIGH SCHOOL_
line" _e
Q1 740 /03 .0'74 0/04 •
Rizi-Mbeir-Sczentzi----)1---chirrr-srtz
.:5J5 ,r car
73 / / P:•:"or774--footcycz7charyz:.1.
N T CIRY
No Revised By Approved By
Public Works Director
RCE 17509
&--)C1-1713IT_
VV cr-t-ez r- " Lintz E. ›c"-frI1S#QPJ
FC'ez r-sc rm t.
IA. r-Tz tzirlerrt" ija.
forgot row... ••••• CO.