HomeMy WebLinkAboutResolutions - No. 2004-99RESOLUTION NO, 2004-99
A RESOLUTION OF THE LODI CITY COUNCIL
APPROVING THE FINAL MAP, IMPROVEMENT
AGREEMENT, AND WATER RIGHTS AGREEMENT FOR
ALMOND NORTH, TRACT NO. 3396, AND FURTHER
APPROPRIATING FUNDS FOR THE REQUIRED
REIMBURSEMENTS
NOW, THEREFORE, BE IT RESOLVED that the Lodi City Council does hereby
approve the Final Map, Improvement Agreement, and Water Rights Agreement for
Almond North, Tract No. 3396, located north of Almond Drive and east of Stockton Street,
adjacent to the Almondwood Estates Subdivision, as shown on Exhibit A attached; and
BE IT FURTHER RESOLVED that the City Council hereby directs the City
Manager and City Clerk to execute the Improvement Agreement, Water Rights
Agreement, and the Final Map on behalf of the City of Lodi; and
BE IT FURTHER RESOLVED that funds in the amount of $1,116, as shown on
Exhibit C attached, be appropriated from the Street Fund for reimbursement to the
developer for the additional cost incurred to install a traffic circle instead of the bow -outs
specified in the map conditions, as shown on Exhibit B attached.
Dated: May 19, 2004
I hereby certify that Resolution No. 2004-99 was passed and adopted by the City
Council of the City of Lodi in a regular meeting held May 19, 2004, by the following vote:
AYES: COUNCIL MEMBERS — Beckman, Hitchcock, Howard, Land, and
Mayor Hansen
NOES: COUNCIL MEMBERS — None
ABSENT: COUNCIL MEMBERS -- None
ABSTAIN: COUNCIL MEMBERS — None
SUSAN 1 BLACKSTON
City Clerk
2004-99
LOT 1 [101 2
COSMIC:COD FCNCE,
HAFHC CIRCLE_
7 1 LOT 8
LOT 14r
I, LOT 15 LOT 1
T 17, LOT 18 LOT 19 IOT 20 101 21 LOT 22 LOT 23 LOT 24 LOT 25
,1
VICIMTY MAP
NOT To scALE
ALMOND NORTH
SUBDIVISION
14 to°
1
TRAFFIC CIRCLE DETAIL
Sat' El 1- fr
S11111C11.041
c
Avt5riA:c4
CONCRE
G[41(7.
g4""J C1455 a
0 9-52: C.
AM CA1119
et 97z kC
6.41'
00/7c, carb
t,t6OLilfliC COiRUL
(71,11H, 4' SOE114111.
& 6" COW
SECI1ON A -A
i
EXHIBIT B
.Ar•TIMIr11,11", 1,, I 71, no, re,,,r1m, .n.n.r •ten. +1,1r,,,rn-rrn , , T,,,,n, rq,,,,,,,,,,,
City of Lodi
Publics Works Department
EXHIBIT C
COST COMPARISON FOR
IMPROVEMENTS AT
CH ERRYWOOD/RAVENWOOD
INTERSECTION
Development: Almond North
Developer: Almond North LLC
Engineer: Siegfried Engineering, Inc.
COST OF IMPROVEMENTS FOR EACH OPTION (1)
Item Description Quantity Unit Price Total
Traffic Circle Option
1 Curb & Gutter 60 LF 75.00 $4,500.00
2 City of Lodi Curb Return (275 SF Each) 4 EA 1,800.00 7,200.00
3 1" Irrigation Service 1 EA 450.00 450.00
4 Engineering Revisions 1 LS 1,400.00 1,400.00
Subtotal $13,550.00
,Bow -Out Option
1 City of Lodi Curb Return (375 SF EA) 4 EA $1,900,00 $7,600.00
2 Additional Paving (AC Only) 6 TN 39.00 234.00
3 48" Storm Drain Manhole 2 EA 2,300.00 4,600.00
Subtotal $12,434,00
Additional Cost for Traffic Circle Installation $1,116,00
(1) Costs provided by Developer's contractor, Teichert Construction, and engineer, Siegfried Engineering.