Loading...
HomeMy WebLinkAboutResolutions - No. 2003-244'La?N 1 01 RM+ WHEREAS, the Lodi Municipal Code requires the City Council, by Resolution, to sot fees for various services provided by the City of Lodi to recover those costs associated with providing specific services and programs, and WHEREAS, staff recommends increasing and establishing fees for the Public Works Department; as shown on the attached schedule narked Exhibit A and R. NOW, THEREFORE, BE IT RESOLVED that the City Council of the City of Lodi does hereby implement the fee schedules as attached hereto and made a pari of this Resolution. All resolutions or parts of resolutions in conflict herewith are repealed insofar as such conflict may exist. This resolution shall be published one time in the Lodi News Sentinel, a daily newspaper of general circulation printed and published in the City of Lodi, and shall be in force and take effect January 15, 2004. dated: Decomber 17, 2003 I hereby certify that Resolution No. 2003°244 was passed and ,adopted by .the City Council of the City of Lodi in a regular meeting held December 17, 2003, by the following vote: AYES: COUNCIL MEMBERS — Beckman, Hitchcock, Howard, Land, and Mayor Hansen OCOUNCIL COUNCILNon@, ABSTAN. COUNCIL MEMBERS — None r SUSAN J. B'LACKSTQN City Clerk En ine.erin :Fees Note Proposed Fee Revision Extstira: Fee Pura Check, First Submittal No..Dha€. e 90% o.f Estimated Final Approval Fee Plan Check, Final Approval 5.0% Of first $50,000 3.0% of next $200,000 2.0% of amount over -$25.0,00.0 4..5% of first $50,000 2.5%. of next $200,00 1.5% of amount over, $250 1000 A neer ent 1 $1,500 Nene .Improvement -None Im rover�aent A rnt. Addenda � Mo. Dieferred irra rovbrnont A reernOnt. 1 $1450.0 Rinne IDBS ecticart :5°fo ora era ineered' .rrs ectS °�v:on en :i�aeered i(3 e:G$S' inspection on ;Overtime 1 1 $43.25/hour $39 90/hour ivtiscellaneou.s Encroaci'tment Per rit Sidewalk/Driveway (singleparcel) 1 .$05. $50 Non -Construction 1 $32 $25 Downtown Sidewalk Encroachment 1 $32 (one-time) Risme Utility & Other Non -Public Construction 1 $32 plus 2.5% of. construction cast for engineering and: 2.5% for inspection tion $25 pleas 2.5% of construction cast for era i.n ring and 2.511/6 for inspection Document Preparation__ 1 .$65 $50 Trans cartation Permits Single Trip No thane $1.6:' er.Caltrans fee Multiple Tris Other: No Chary e $90per Caltrans fee Address Ohara e � $21 $16 Street Abandonment 1 $963 plus traffic studies, if needed $754plus traffic studies Easement Abandonment street Marne Chan e Lot L:ine:'Aojustment 1 1 1 $321 $321 $11.20 $250 $250 $225 impact Mitigation Fee Payment Agreement 1 $500 Wane These fees shail be adjusted annually by the iinflabon rate based on the prior calendar year as determined by the Consumer Price Index (Western Region, Urban, unadjusted). The Fate of inflation (or deflation) is applied to the fees to determine tfaa fees for thesubs"uent year, said fee adjustments, if any, will be made autornatical y effective July 1 of each year. cEngineeringFee_Exhibit,A.doc CEngineeringFee_Exhibit.doc 12J1012003 Loedi Present Fee Lodi Proposed `i=ee Stockton Lathrop caunty. Tracy Ripon i'tart Check. 4.5% of $5€1;000 phis 5.011% of $5€k,000`pips 5.5% Of .. 5,000 plus 5.5°f�:af $ZS;OOI) 7.i�% df:$50,t 0ti pigs 3,5% 3.i9e�. 2:5% of $24iQ,O130. plus 3.0%. of $ZE10,0[DO<pltas 3,0°Je o $225,iBB. plus. 4.5% of $225,000. s 3 8666:::r f. $250,000plus I m/a of >$250,000 2;G0/-1 of >$250;000 2.0%. Of >$Z6,00G: Jo..>$25fi,(16 0 2 75% �$ Oi3,£1 (D Inspection Z5% 3,0W 3.5°!� 3.t3�f 5% of $200,000 pl€ !§ : 3.5% 3.0% 3.86 /e of W0,1100 plus 2.25'JP' $l 000,000. Improvement greement None. $1,5.00 $4,.000 lone $900 $3,780 $1,000 Subdivision A ent .ree Irnpro ement Agreement. None $500 $4,050 None None None None Addenda Deferred Improvement ivr-ne $1,500 $4,000 $250 $410 $3,780 $2,€1.00- Agreement _— $4;l'�EsO CEngineeringFee_Exhibit.doc 12J1012003