Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
Resolutions - No. 2003-226
A RESOLUTION.OF THE LOBI: CITY CO.UNCIL.MAKING PRELIMINARY DETERMINATION TO ANNEX TERRITORY TO A MAINTENANCE ASSESSMENT DISTRICT, TCO FORM A ZONE, TO LEVY AN ANNUAL ASSESSMENT FOR COSTS INCURRED AND PRELIMINARY APPROVAL OF ENGINEER'S REPORT CENTURY MEADOW ONE -ZONE 2 LORI CONSOLIDATED LANDSCAPE MAINTENANCE ASSESSMENT DISTRICT NO.2003-1 (LANDSCAPING AND LIGHTING ACT OF 1972) NOW, THEREFORE, BE IT RESOLVED by the Lodi City Council that: 1 e The City Council proposes to annex territory.to an existing assessment district, to form a Zone, and to levy and collect assessments pursuant to the Landscaping and Lighting Act of 1972 (Streets and Highways Code, Section 22500, et seq.) (the "Act"). 2. The. improvements to be installed and/or maintained in the territory to be annexed are generally described in Exhibit A attached hereto grid incorporated herein as though set out in full. 3. The territory to be annexed shall be known as Century Meadows. One -Zone 2, Lodi Consolidated Landscape Maintenance Assessment District No. 2003.1 (Landscaping and Lighting Act of 1972), City of fedi, San Joaquin County, California. The territory to be annexed Century Meadows One, Units 2 and 3, a residential arca. comprising 133 lots, eastern and northeastern boundary borders along the south acid west dela of Woodbadge Irrigation District Canal. The southern boundary is the no side of Hanley lane from the canal west. The westerly boundary runs north from Harney Lane through the center of Murifield Drive along Century Meadows Two Unit 4 and borders Century Meadows One Unit 1 to the north in the City of Lodi, California: 4. Thompson-Hysell Engineering, a division of The Keith Companies, Inc., of Modesto, California, is hereby directed to prepare and file a report in accordance with Article 4 (commencingwith Section 22565 of Chapter 1 of Streets and Highways Code.) 5. Thompson-Hysell Engineering, a division of The Keith Companies, Inc., designated engineer, in accordance with the City Councii's directive herein, has filed with the City Clerk the Report required by the Act which Report is hereby preliminarily approved. Dated: December 3, 2003 I hereby certify that .Resolution N.o. 2003-226 was passed and adopted by the City Council of the City of Lodi. in a regular meeting held'DDecember 3, 2003, by the following vote: AYES-. COUNCIL MEMBERS — Beckman, Hansen, Howard, Lana, and Mayor Hitchcock NOES: COUNCIL MEMBERS - None ABSENT: COUNCIL MEMBERS - Nona ABSTAIN: COUNCIL MEMBERS — Nene SUSAN J. BLACKSTON City Clerk 2003-226 Description of Improvements to be maintained for Century Meadows One Units 2 & 3 A. A masonry wall acid 13.5 feet wide landscaping area along the north side of Harney Lane ftom the project's east boundary to the west boundary, including the 2 angled corner sections at Poppy Drive, appr:oxii-nattily 1,661 lineal feet, B. Street parkway trees located within the public streets within. the Zone 2 boundary. C. Public park land area of 0.820 acres in size equivalent to the current level of service standard for park area within the City of Lobi of 3.5 acres per thousand persons served. COL/ExA/ 11 /20103 Exhibit Landscape Maintenance Assessinent District Annexation and zone 2 Budget Election Nove ber 2l, 2003 November 21, 2003 1)ecember 3, 2003 December 8, 2003 January 9, 2004 January 21, 2004 Aetiyitv/"l"asks Distribution. of preliminary draft Engineer's Report Initial Resolutions to.City Council Communication, Finalized Engineer'S Report City Council Meeting to; Resolution. of Preliminary Determination to Ann ex to Corsi lidated District, Form Zone 2 Resolution of Intention (sets f'ublie Hearing and date of Election on January 21, 2004) Last clay to Mail Notice and Ballot Resolutions to City Approve Engineer's Report Annex.to Consolidated 0 trict, Form. Zone 2 Tally vote/Oeela:re results Council communication Last day to receive Ballots January 21, 2004 City Council. meeting o-. Public Hearing/ `ally vote/Declare. results Annex to Consolidated District, Zone 2 CoL Timetable 11-14-03 v.2 Ii`ISCAL YEAR 2004-2005 6:: :i '.1...I.' CENTURY MEADOWS ONE LODI CONSOLIDATED LANDSCAPE MAINTENANCE ASSESSMENT DISTRICT NO.2 CITY OF LODI (Pursuant to the Landscaping and Lighting Act of 1972) The undersigned respectfully submits the enclosed annual report as directed by the City Council. DATED: , 2004. go Thompson -Hy sell Engineers Engineer of Work Michael T. Persalt RCE 44908 1HEREBY CERTIFY that the enclosed Annual Engineer's Report; together with Boundary Map, Assessment, and Assessment Diagram therotb attached, was filed with me on the day o MW. City. Cleric, City of Lodi San Joaquin.County, California IM I HEREBY CERTIFY that the enclosed Annual Engineer's Report together with Assessm.e.. t and Assessment Diagrasri thereto attacbed, was approved and confirmed by the City Council of the City of Lodi, California on the _ clay of , 2004, , City Clerk, City of Lodi San Joaquin County, California BY: MEREBY CERTIFY that the enclosed Annual Engineer's Report together with Assessment and Assessment Diagram thereto. attached, was filed with the Auditor of the County of Sail Joaquin on the day of , 2004. City Clerk,.City of Lodi San Joaquin County, California BY: November 24, 2003 To Whom It May Concern: This report is prepared pursuant to and incompliance with the requirements of the "Landscaping and Lighting Act of I9721" as amended, commen inn with the Streets and Highways code sections 22500, etseq. fog the creationof a new zone (Century Meadows One) in the Dodi Consolidated Landscape Maintenance Assessment District No. 2. BACK GROUND The Century Meadows One zone consists of a 133 -lot residential development in the southeastern portion'ofthe City ofLodi. The dove lopir,ent is being: pursued byK&W Development, LLC. This report is relative to the proposed Century Meadows One Landscape Maintenance District of the City of Lodi' Consolidated L.andscape Maintenance Assessment annual funds for the maintenance ifvarious public landscape improvements. PHASED DEVELOPMENT The Century Meadows One development. is currently anticipated to be constructed in a single phase. Annually, the additional public amenity improvements and the additional developed areas, if any, .shall be identified. The costs of the maintenance of the new improvements, if any, shall be added to and included in the next annual landscape maintenance budget. These amounts for the additional improvements were accounted for in determining the maximum annual assessment (see Exhibit A). The Century Meadows One project, when completed, will include an estimated 133 single-family residential lots. ASSESSMENT DISTRICT AREA The area of Century Meado. ws 0.n.eis described as all of the property within the following assessor's Parcels identified by assessor's number. (APN): Book Page parcel 058 520 1-57m 058 210. 25, 27, 28 Engineer's Report Century Meadows One Page 2 of s November 24; 2043 A boundary neap is attached to this Engineer's Deport as Exhibit B. The assessment diagrams for the Century Meadows One Landscape Maintenance District are attached to the Engineer's Report as Exhibit C. Sheet No, l of'the assessment diagrams is a simple overall boundary map. Sheet Nos. and 3 are the County Assessor's reaps and a1°e incorporated in, and made a part of, the assessment diagram. PLANS AND SPECIFICATIONS As this project is developed, plans and specifications for the ameDity improvements to be maintained by the funds generated by the Century Meadows One Landscape Maintenance District shall be filed with the City of Lodi and will be incorporated into this report by reference. DESCRIPTION OF AREAS TO BE MAINTAINED TheCentury Meadows One Landscape Maintenance District is created to provide funding for the continued maintename of the public areas which are described below. During the installation period for each phase, the installer cif the improvements will maintain the new improvements until the following June 30 or until such. tirne.as funds are available for maintenance; at which time the new areas shall be incorpoi%ated into the areas already being maintained by the District. The following improvements shall be included in the District upon their completion (see Exhibit D). I . Description of liprovements for Future Development A. A masonry wall and 13.5' wide landscaping area along the north side of Harney Lane from the project's east boundary to the west boundary, including the 2 angled cozier sections at Poppy Drive, approximately 1,20€1 lineal feet. B. Street parkway trees located within the public street within the District .done 2 boundary. C. Public parkland area of 1,24 acres in size equivalent to the current level of service standard for park area within the City of 3.4 acres per 1000 persons served. ALLOCATION OF;COST Assessments for the Century Meadows One Landscape Maintenance District are apportioned. in a manner intended to fairly distribute the amounts among all assessable developed parcels in proportion to the estimated benefits to be received by each such parcel. A parcel is considered. as being developed by reason of having leen included as a lot or parcel in the Century Meadows One recorded Final Map or being included within the active developed area in the case of ars existing. parcel. The criteria for apportioning'the costs for the maintenance makes use of a dwelling unit equivalent Factor (duel) to calculate the benefit for all uses in terms of equivalent dwelling units. The terms, definitions, and procedures followed to develop the annual assessments are as follows: A. Sinvle-Family Residential All parcels deterrriined to be developed for single-family use shall have a dueF of 1.0 for each parcel. B. Multiple- ajly Residential. All parcels determined to be developed for multiple -family residential,; other than duplex or triplex uses, shall have a duel of 5.0 per acre for each parcel, in general representative of the approximate single-family yield if the area were developed for that use. C. CoramerciallQlflce All parcels determined to be developed for commercial or office uses shall have the dueF.factor calculated as follows; 5 duel per acre for the first 7:5 acres 2.5 dueF per acre. for the next 7.5 acres 1.25 dueF per acre for all acreage over 15 acres. D. Qther Uses All parcels determined to have uses other than identified above shall have a duel established at the time of the first annual budget affecting such areas as determined by the Engineer or other officer appointed by the City of Lodi to prepare the annual cost spread. The determined duep shall follow the character of the factors assi ;n A above as nearly as practicable, but the determination shall be the sole responsibility of the appointed party and. the City of Lodi. E. Zero „Dwelling Unit Equivalent Factor (dtaeF Certain parcels, by reason of use, size, shape, or state of development, may be assigned a zero duep which will consequently result in a zero assessment for that fiscal year. All parcels Having such a zero duep for the previous fiscal year shall annually be reconsidered to determine if the reason for assigning the zero duep is still valid.f'or the next fiscal year. Parcels which may be.expected to:ha-ve a zero duep assigned are typically parcels which are all, or nearly all, publicly landscaped, parcels in public ownership, parcels owned by a public utility company anchor used for public utilities, publicpa;rks, public scliools, and remainderparcels too small or narrow for reasonable residential or commercial use, unless actually in use. Engineer's Report Century Meadows One Page 4 of 8 Nowa ber 24, 2003 1. Area Adjustments Parcels which have an assessment determined by area and which have a portion of the parcel occupied by public or public utility uses separate from the entitled use and located in easements, prior to the intiltiplieation by the dueF, shall have the area of the parcel adjusted to a usable area to reflect the kiss or partial loss of the entitled use in those areas. This reduction shall not apply for normal peripheral and interior lot line public utility easements generally existing over the whole subdivision. 2. Co�ilation Annually, about May 15, following the determination of the dwelling unit equivalent Factor (duel~) for all developed pareels and the dete. rnzination of the list of developed parcels by APN for the next fiscal year, all single-family or duplex/triplex residential parols shall a dwellingunit equivalent (due),assigned to each parcel equal to the dueh' for that parcel. For all parcels other than single-family or duplex/triplex residential parcels, the product of the dueP times the area or adjusted usable area of the parcel, as appropriate, small be calculated and shall be the due assigned. For developed parcels, the sum of the duce assigned to each single-family due f'or eaeh other parcel shall equal the total due for the next fiscal year. The total amount of revenue required for the next fiscal year shall then be divided by the total due to calculate the assessment per due for the next fiscal year.. Parcels defined as not developed for the purposes of determining the landscape maintenance assessments will all have a zero dueP and consequently a zero due and a zero assessment. Allocation of Assessments The assessment for wall maintenance for the next fiscal year shall then be set for each parcel as the product of the. calculated dwelling unit equivalent (clue) for each parcel, multiplied by the assessment per due for the next fiscal year. 'METHOD OF ASSESSMENT SPREAD In compliance with the .provisions of Proposition 218, adding Article X111 D to the California Constitution;!; the betzefits conferred on each parcel within the Lodi Consolidated Landscape Maintenance District No. t are particular and distinct benefits (hereinafter "special benefits") over and alcove general benefits conferred on such property or to the public at large, in thatthe individual letter -designated zones in:the District each represents a common unit to provide landscape, park, and related amenity maintenance, and monitored irrigation for the development of the property within the individual letter -designated zones in the District generally for residential and related urban uses. Benefits are determined to be 140% special benefits and 0% general benefits. Also, in keeping with the requirements of Proposition 218, no annual individual assessments shall be increased above the amounts assessed under the established criteria for each zone for the preceding fiscal year without an election approval. Engineer's Report Century .Meadows One Page 5 of 8 Novemb. er 24, 2003 The base objective of the assessment spread is to.distribute costs in accordance with the benefits received. Costs will be spread.e uallyto each residential. lot as follows: L Unit 2, lots 56-1.12, and Unit 3, lots 4955 and 113-181, in Century Meadows One shall be assessed equally for the estimated costs ofmaintenance for the fiscal year 2004-2005. ANNUAL ESCALATION The maximum assessment amount for each fiscal year shall be increased in an amount. equal to the greater of; I) five percent (5.0%), or 2) the percentage increase of the Local Consumer Price Index (CPI), Consumer Price Index applied is.for the Sari F'ranciscowOakland-Sari Jose County Area for All Urban Consumers, as developed by the U.S. Bureau of Labor Statistics for a similar period of time. ADMINISTRATION It is intended.that the City of Lodi, either directly or by subcontract, shall have the responsibility to establish an ongoing Landscape Maintenance Management entity .to be known as the Landscape Maintenance District Managerwhich shall be responsible to establish the annual budget, keep an accounting of the maintenance and operational administrative costs, administer and perform the landscape maintenance either directly or by subcontract, pay all fees, utility costs, taxes, and any and all other operating. costs. ESTIMATE OF COST The location and size of park.serving this subdivision has. not yet been determined. The estimated costs;are for public amenitymaintenance only. ,All improvements will be installed at no cosi to the Landscape Maintenance Assessment District. The assessment will not be levied until needed, upon development and. City acceptance of the improvements. Items considered in the maintenance cost include, but are not limited to: water for plants and trees, weeding, pruning, mowing replacementof plants and trees that may die, maintenance of pavement and sidewalks, maintenance of walls, rebuilding damaged walls, removal of graffiti, and maintaining and replacing all sprinkles lines and heads. Engineer's Report.. Century Meadows One Page 6 of 8 November 24, 2003 The annual costs estimated to be collected with the 2004-2005 taxes for the developed areas are as f6ilows: OPERA.T1rON O .::.COSTS Landscape Maintenance Repair/replacement Water Electricity Replacement Reserve Subtotal Landscape FY 2004-05 ESTIMATED ASSESSMENT AMOUNT $8,313.00 $1;0500 $400.00 $300:00 400:00 $10,463.00 Street Trees $5,410.00 Future ParkSite $0.00 Walls Repair N.4aintenancelGraffi Control $400.00 Replacement Reserve U.19 0 00 0 Subtotal Walls $3,400.00 Est. Subtotal Operation Casts $19,273.04 FY 200405 MAXIMUM ASSESSMENT AMOUNT $8,313.0p0 $1,050,00 $400.00 $300.40 4i10:t? $10,463.00 $5,410.00 $12,430.00 $400.00 3 000.00 $3,400.00 $31,703:00 Engineer's Report Century Meadows One Page 7 of November 24, 2003 OPERATION OF COSTS DISTRJCT ADMINISTRATION COSTS Annual Engineer's Report Publication City Administration Fee County Administration Fee Est. Total Administration Casts Est, Contingency Total Estimated[ Re'Venne Requ ired for 2004-2005 Fiscal Year Total :A.ppronation Required from Existing Fund Balance Total.Esti atetl Assess c t for 2004-2005 Fiscal Year Total dueF Assessment per dueF MAXIMUM ANNUAL ASSESSMENT FY 2004p05 FY 2004=05 ESTIMATE MAXIMUM ASSESSMENT ASSESSMENT AMOUNT T AM[O NT $4,000.00 $4,000:00 $1 0OO $10 $2,000.00 j0�, j0�0 $2,(Il}0A 900.00 200:00 $ 1,000.00 $ ,000..00 $I,,391.00 $1,862.00 $27,664.00 $40,565.00 $0.00 $0.00 $.27,664.00 $40,565;00 133 133 $208.04 $305.00 $305:00 The parcels in this subdivision are expected to subdivide upon and subsequent to the formation of Zone 1. The proposed subdivision will yield approximately 133 parcels (residential lots) and will have A proposed assess.merit :roll, based on the agave criteria and budget, set forth in EAib t A. The foregoing Engineer's Report and the estimate of costs, as well as the Assessment Diagram and Assessment Roll, which are attached hereto, are presented for your approval by resolution dated this day of F_ , 2004. TBOMPSON-HYSELL ENGINEERS Engineer of Work BY, Michael T. Persak RCE 44908 2004-2005 Assess- No. of 2004-20(15 kst. Max. ment AP.N No. Future Lot Nos. Owner Residential Assessment annual No. Lots Assessment Arnnavimt 1 058-5.20-I-57 Unit 2, Lots 56-112 K&W 57 $11,856.00 $17,385.00 Development, LLC 2 058-210-25 Unit 3, Lots 49-55, K&W 7 $1,456,00 $2,135.00 Development, LLC 3 058-210-27,28 Lots 113-181 K& W 69 $14,352.00 $21,04S.Ufl Development, LLC Total 133 $27,664.00 $40,565.00 The parcels in this subdivision are expected to subdivide upon and subsequent to the formation of Zone 1. The proposed subdivision will yield approximately 133 parcels (residential lots) and will have A proposed assess.merit :roll, based on the agave criteria and budget, set forth in EAib t A. The foregoing Engineer's Report and the estimate of costs, as well as the Assessment Diagram and Assessment Roll, which are attached hereto, are presented for your approval by resolution dated this day of F_ , 2004. TBOMPSON-HYSELL ENGINEERS Engineer of Work BY, Michael T. Persak RCE 44908 DIAGRAM .NUMBER MBER COUNTY. ASSESSOR NUMBER : UNIT NO. LOT NO. F`( 20.04-.2005 ESTIMATED:. ASSESSMENT AMOUNT. FY 2004-2005 MAXIMUM ASSESSMENT AMOUNT Century tdlc adows One, 49 058-210-25 unit No 3 Lot No. 49 $208.00 $305.00 Century Meadows One, 50 058-210-25 Unit No, 3 Lot No. 50 $208.00 $305.00 Century Meadows One, 51 058-210-25 Unit No. 3 Lot No. 51 $208.00 $305.00 CenturyMeadows One, 52 058-210-25 Unit. No. 3 Lot No. 52 $208.00 $305.00 Century Meadows tine, 53 058-210-25 unit Nci: 3 Lot No. 53 $208.00 $305.60 Century Mea ows One, 64 058-.214-25 Unit No. 3 Lot No. 54 $208.00 $305:00 Century Meadows One, 55 058-210-25 Unit No. 3 Lot No. 55 $208.00 $305.00 Century; Meadows One, 56 058-520-01 Unit No. 2 Lot No. 56 $208.00 $3066.00 Century Meadows One, 57 058-520-02 Unit. No, 2 Legit No, 57 $208.00 $305.00 Century Meadows One, 58 058-520-03 Unit.No. 2 Lot No. 58 $208.00 $305.00 Century Meadows One, 59 058-520-04 Unit No..2 Lot No. 59 $208.00 $305.00 Century Meadows One, 60 058-520705 Unit No. 2 Lot No. 60 $208.00 $305.00 Century Meadows One, 61 058-520-0.6 Unit. No.. 2 Lot No. 61 $208.00 $305.00 Century; Meadows One, 62 058-520-07 Unit No; 2 Lot No, 62 $208.00 $305.00 Century: -:Meadows One, 63 058-52008 Unit No. 2 Lot No. 63 $208.00 $305.00 Century Meadows One, 64 058-52mb Unit No, 2. Lot No. 64 $208.00 $30$.00 Century Meadows One, 65 058-520-10 Unit No.:2 Lot No. 65 $205.00 $305.00 Century Meadows. One, 66 058-520-11 Unit No. 2 Lot No. 66 $208.00 $305.00 Century: Meadows One, 67 058-520-12 Unit No. 2 Lot No. 67 $208.00 $305.40 Century Meadows One, 68 058-520-13 Unit No. 2 Lot No. 68 $208.00 $305.00 Century Meadows One, 69 058-520-14 Unit No. 2 Lot No. 69 $208.00 $305.00 Century Meadows One, 70 058-620-15 Unit:No: 2 Lot No. 70 $208.00 $305:130 p:Nodi\2070Q\BAUMBACH1iAZZA`ASSESSROWExhibitA.xls Page 1 of _l T R ► fly Lot No. 71 Lot No. 72 Lot No. 73 Lot No, 74 swot No. 75 Lot No. 76 Lot No. 77 Lot No. 78 Lot No. 79 Lot No. 80 Lot No. 81 Lot No. 82 Lot No. 83 Lot No. 84 Lot No. 85 Lot No. 86 Lot No. 87 Lot No. 88 Lot No. 89 Lot No. 90 Lot No. 91 Lot No. 92 Lot No. 93 Lot No. 94 Lot No. 95 Lot No. 96 Lot No. 97 FY 2004-2005 FY Century Meadows One, 71 058-520-16 Unit No. 2 Century Meadows One, 72 058-520-17 grit No. 2 Century:Meadows One, 73 058-520-18 Unit No. 2 Century.Meadows One, 74 058-520-19 Unit No. 2 Century Meadows One, 75 058-520-20 Unit Nig. 2 Century Meadows One, 76 058-520-21 Unit No. 2. Century, Meadows One, 77 058-524-22 Unit No..2 Centuryleadows One, 78 058--520-23 Unit No. 2 Century Meadows One, 79 058-520-24 Unit No. 2 Century Meadows One, 80 058-520-25 Unit No. 2 Century Meadows One, 81 058520-26 brit No. 2 Century Meadows One, 82 058-520-27 Unit No. 2 Century Meadows One, 63 058-521-28 Unit No. 2 Century Meadows One, 84 058-520-29 Unit No. 2 Century Meadows One, 85 058-520-30 unit Nig. 2 Century Meadows One, 86 058520-31 Unit No. 2 Century Mead ows One, 87 458-520-32 Unit No..2 Century Meadows One, 88 058-520-33 Unit No, 2 Century -Me adows One, 89 058-520-34 Unit No. 2 Century Meadows One, 90 058-520-35 Unit No. 2 Century Meadows One, 91 058-520-36 Unit No. 2 Century Meadows One, 92 058-520-37 Unit No. 2 Century Meadows One, 93 058-520-38 Unit No. 2 Century Meadows One, 94 058-520-39 Unit No. 2 Century Mea down One, 95 058-520-40 Unit No. 2. Century Meadows One, 96 058-520-41 lnit'No.2 Century Meadews.One, 97 058-520-42 Unit No, .2 p:liodi1292700IBAUMBACH21A2ZA\ASSESS R©WExhihit A.xls Lot No. 71 Lot No. 72 Lot No. 73 Lot No, 74 swot No. 75 Lot No. 76 Lot No. 77 Lot No. 78 Lot No. 79 Lot No. 80 Lot No. 81 Lot No. 82 Lot No. 83 Lot No. 84 Lot No. 85 Lot No. 86 Lot No. 87 Lot No. 88 Lot No. 89 Lot No. 90 Lot No. 91 Lot No. 92 Lot No. 93 Lot No. 94 Lot No. 95 Lot No. 96 Lot No. 97 FY 2004-2005 FY �-.... .. ` I �R1ESTIMATED 'is�SESR71 ENT ...ASE . $208.00 $208.00 $208.40 $208.00 $208.00 $208.00 $208.0© $208.00 $208.00 $208.00 $208.00 $208.00 $208.40 $208.00 $208,00 $208.00 $208.04 $208.00 $208.00 $208.00 $208.00 $208.00 $208.00 $208.00 $208.00 $208.00 $208.00 ung AEN $305,00 $305.00 $305.44 $305.00 $305,00 $305.00 $305:00 $305.00 $305:00 $305.00 $305,00 $305;00 $305.00 $305.00 $305.00 $305.0.0 $305.00 $305:00 $305.40 $305.00 $345.00 $305.00 $305:00 $306-00 $305.00 $305.00 $305:00 Page 2 of 6 pALodi1292700\BAUMSACH31AZZA�ASSESS ROLUExhibit Axis Lot No, 98 Lot No. 99 Lot No, 100 Lot No, 101 Lot No, 102 Lot No. 103 Lot No. 104 Lot No. 105 Lot No. 106 Lot No. 107 Lot No. 108 Lot No. 109 Lot No. 730 Lot No, 111 Lot No. 112 Lot No, 113 Lot No. 114 Lot No. 115 Lot No. 116 Lot No, 117 Lot No. 118 Loi No. 119 Lot No. 120 Lot No. 121 Lot No. 122 Lot No. 123 Lot No. 124 FY 2004-2005 COUNTY. ESTIMATED DPAGRAM ASSESSOR ASI t UMBER NUMBER UNIT NO. Century Meadows One, 98 05852043 Unit No. 2 Century Meadows One, 99 058-52044 Unit No, 2 Century Meadows One, 100 058-520-45 Unit No. Century Meadows One, 101 058-520-46 Unit No. Century Meadows One, 102 058-520-47 Unit No. Century Meadows One, 103 058-520-48 Ur* No. 2 Century : Meadows One, 104 058-520-49 Unit No. 2 Century Meadows One, 105 058-520-50 Unit No; 2 Century Meadows One, 106 058-520-51 Unit No. 2 Century M eadows One, 107 058-520.52 Unit Nig, 2 Century Meadows One, 108 058-520-53 Unit No, 2 Century.Meadows One, 109 058-520-54 Unit NO, 2 Century Meadows One, 110 058-520-55 Unit No: 2 Century. Meadows One, 111 058-520-56 Unit No. 2. Century Meadows One, 112 058-520-57 Unit No. 2 Century Meadows One, 113 058-210-27 Unit No: 3 Century Meadows One, 114 058210-27 Unit No. 3 Century Meadows One, 115 058-210-27 Unit No. 3 CenturyMeadows One, 116 058-210-27 Unit No. 3 Century Meadows One, 117 058-210-27 Unit No. 3 Century Meadows One, 118 058-210-27 Unit No. 3 Century Meadows One, 119 058-210-27 Unit No3 Century Meadows One, 120 058-210-27 Emit No.'3 Ceritury Meadows.One, 121 058.21027 Unit No..3 Century Meadduvs One, 122 058-210-27 Unit No. 3 Century Meadows One, 123 058210-27 Unit No. 3 Century Meadows One, 124 058-210-27 Unit No. 3 pALodi1292700\BAUMSACH31AZZA�ASSESS ROLUExhibit Axis Lot No, 98 Lot No. 99 Lot No, 100 Lot No, 101 Lot No, 102 Lot No. 103 Lot No. 104 Lot No. 105 Lot No. 106 Lot No. 107 Lot No. 108 Lot No. 109 Lot No. 730 Lot No, 111 Lot No. 112 Lot No, 113 Lot No. 114 Lot No. 115 Lot No. 116 Lot No, 117 Lot No. 118 Loi No. 119 Lot No. 120 Lot No. 121 Lot No. 122 Lot No. 123 Lot No. 124 FY 2004-2005 FY ESTIMATED V ASSESSMENT ASI AMOUNT $208.00 $208.00 $208.00 $208.00 $208.00 $208.00 $20&00 $208.00 $208.00 $208.00 $208.003 $208.00 $2038.00 $208.00 $208.00 $208.00 $208.00 $208.00 $208.00 $208.00 $208.00? $208.00 $208.00 $208.00 $208.00 $208,00 $208.00 imum a $305.00 $305.00 $305.00 $305,00 $3WOO $305.00 $305.00 $305.00 $305.00 $305.00 $305.00 $30"5.00 $305,00. $30)5.00 $305.00 $305.00 $305.00 $305.00 $305..00 $305.00 $305.010 $305.00 $305.00 $305.00 $305.00 $305:00 $305.00 Page 3 at 6 125 058-210-27 Unit No. 3 Lot No. 125 $208,00 $305.00 Century Meadows One, 126 058-210-27 Unit No, 3 Lot No, 126 $208.00 $305.00 Century Meadows One, 127 058-21027 Unit No. 3 Lot No. 127 $208-00 $305,00 Century Meadows One, 128 058-210-27 Unit No. 3 Lot No. 128 $208-00 $305-00 Century Meadows One, 129 058-210-27 Unit No. 3 Lot No. 129 $208.00 $305.00 Century Meadows One, 130 058-210-27 Unit No -3 Lot No. 130 $208.00 $305.00 Century Meadows One, 131 058-21027 Unit N o.3 Lot No. 131 $208.00 $305.00 Century Meadows One, 132 05&210-27 Unit No. 3 Lot No. 132 $208.00 $305-00 Century Meadows One, 133 058-210-27 Unit No. 3 Lot No. 133 $208.00 $305-00 Century.. Meadows One, 134 058-21.027 Unit No. 3 Lot No. 134 $208-00 $305,00 Century. Meadows One, 135 058-210-27 Unit .N.o. 3 Lot No, 135 $208.00 $305-00 Century. Meadows One, 136 058-210-27 Unit No. 3 Lot No. 136 $2.08-00 $305.00 CehtUry.Meadows One, 137 058-.210-27 Unit No. 3 Lot No, 137 $208,00 $305.00 Century. Meadows One, 138 058-210-27 Unit No, 3 Lot No. 138 $208,00 $305.00 Century Meadows One, 139 058-210-27 Unit No, 3 Lot No. 139 $208.00 $305.00 Century Meadows One, 140 058-210-27 Unit No. 3 Lot No. 140 $208,00 $305-00 Century Meadows One, 141 058-210-27 Unit No. 3.. Lot No, 141 $208.00 $305:00 Century Meadows One, 142 068-210-27 Emit .No..3 Lot No. 142 $208.00 $305,00 Century Meadows One, 143 058-210-27 Unit No, 3 Lot No. 143 $208,00 $305-00 Century Meadows One, 144 058-210-27 Unit No. .3 Lot No. 144 $208.00 $3WOO Century Meadows One, 145 058-210-27 Unit No. 3 Lot No. 145 $208.00 $305.00 Century MeadowsOne, 146 058-210-27 Unit No, 3 Lot No. 146 $208.00 $505.00 Century :Mea dows One, 147 058-21027 Unit. No.:3 Lot No. 147 $208.00 $305.00 Century Meadows One, 148 058-210-27 Unit No, 3 Lot No, 148 $208.00 $305.00 Century Meadows One, 149 058-210-27 Unit No. 3 Lot No. 149 $208.00 $305.00 Century Meadows One, 150 058-210-27 Unit Nei. 3. Lot No. 150 $208,00 $305-00 Century Meadows One, 151 058-210-27 Unit No. 3 Lot No. 151 $208-00 $305.00 p:liodi12927001BAUMBACH4[AZZA\ASSE$S ROLL-ExhiNt Axis Page 4 of 6 Lot No. 152 Lot No. 153 Lot No. 154 Lot No. 155 Lot No. 156 Lot No, 157 Lot No. 158 Lot No. 159 Lot No, 160 Lot No. 161 Lot No. 162 Lot No. 163 Lot No, 164 Lot No. 165 Lot No. 166 Lot No, 167 Lot No. 168 Lot No, 169 Lot No. 170 Loft No, 171 Lot No. 172 Lot No. 173 Lot No, 174 Lot No, 175 Lot No. 176 Lot No. 177 Lot No. 178 lam$` ,►_. �. e DIAGRAM AS5ESS0k NUMBER NUMBER: UNIT.M..: 058-210-27, Centi;iry Meadows One, 152 058-210-28 Unit.No.3 Century Meadows One, 153 058-210-28 Unit No. 3 Century Meadows One, 154 058-210-28 unit No. 3 Century Meadows One, 155 058-210-28 Unit: No..3 Century Meadows One, 156 058-210-28 Unit No. 3 Century Meadows One, 157 058-2.1O-28 Unit No. 3 Century Meadows One, 158 058-210-28 Unit No. 3 Century. Meadows One, 159 058-21028 Unit No. 3 Century Meadows One, 180 058-210-28 Unlit No, 3 Century Meadows One, 161 058-21028 Unit 'No. 3 Century Meadows One, 162 058-210-28 Unit No, 3'.. Century Medows One, 163 058-210-28 a it. No. 3 Century: Meadows One, 164 058-210-28 Unit No 3 Century Meadows One, 165 058-210-28 Unit No. 3 Century Meadows One, 166 058-210-28 Unit No. 3 CenturyMeadow s One, 167 056-210-28 Unit No. 3 Century meadows One, 168 058-210-28 unit No. 3 Century.Mea.d. o s One, 169 058-210-28 G:1 nit :No. 3 Century Meadows One, 170 058-210-28 Unft No. 3 Century Meadows Circe, 171 058-210-28 Unit No..3 Century Meadows One, 172 058210-28 Unit No. 3 Century Meadows One, 173 058.210-28 Unit No, 3 Century Meadows One, 174 058-210-28 Unit No. 3 Century Meadows One, 115 058-210-28 Unit No. 3 Century Meadows One, 178 058-210-28 Unit No, 3 Century Meadows One, 177 058-210-28 Unit No. 3 Century Meadows One, 178 058-210-28 Unit No, 3 p:\Iodi129270€ %BAUMBACH5IAZ7-A\A85ESS ROLLNExhi0it Axis Lot No. 152 Lot No. 153 Lot No. 154 Lot No. 155 Lot No. 156 Lot No, 157 Lot No. 158 Lot No. 159 Lot No, 160 Lot No. 161 Lot No. 162 Lot No. 163 Lot No, 164 Lot No. 165 Lot No. 166 Lot No, 167 Lot No. 168 Lot No, 169 Lot No. 170 Loft No, 171 Lot No. 172 Lot No. 173 Lot No, 174 Lot No, 175 Lot No. 176 Lot No. 177 Lot No. 178 lam$` ,►_. �. e $208.00 $208.00 $20.8.00 $208.00 $208.00 $1208.00 $208.60 $208.00 $208.00 $208.00 $208.00 $208.00 $208.00 $208.00 $208.00 $208.00 $208.00 $208,00 $208.00 $208.00 $208.00 $208.00 $20&00 $208.00 $208.00 $208.00 $208:00 IM .ENT. IT $305.x:10 $305.00 $305.00 $305.00 $305.00 $305,00 $305.00 $305.00 $305.00 $305.00 $305.00 $305.00 $305.00 $305,00 $305,00 $305.00 $305.00 $305.00 $305.00 $305.00 $305.00 $305.00 $305.00 $305.00 $305.00 $305.00 $305.00 Page 5 of 6 179 058-21.O-28 Unit No. 3 Lot No, 179 $208.00 $305,00 Century Meado ws One, 180 058-210,0 Unit No. 3 Lot No. 180 $208.00 $305,00 Century.Meadows One, 181 058-210-28 Unit No. 3 Lot No. 181 $208.04 $345.00 pillodi129270ONSAUMBACH6EAZZAtAS5E55 ROLLU�xhibit A.xl§ mage 6 of 6 �4f t+ 1 ~ a l z 1 PP. kA ziz1Lit$ 4 � i O ��C.�tWq�LU Pa b h tdj� M5 Ci_ Zk ar, L+.P V 1 F 1 PP. kA ziz1Lit$ 4 ujZLl,t ar, L+.P V F 1 I� ziz1Lit$ 4 ujZLl,t Pa b h M5 Ci_ Zk h s $` � �14 ar, L+.P V F 1 I� ziz1Lit$ ujZLl,t M5 Ci_ Zk $` x ar, $` x g s, 7VNVO 1,101510 Nor/iOW81 3,901dq,70(!MC3 n a 0 ar, 7M'* J•.�I?YJSl4 NOiJ!V ddl a?,')OMWOOM n O LA I� e� � � "�".. �' a "�« ..•.. �`, \ ✓� ! 1 I 1 nri f 7VAYI) m � 3NY1 0%3�N.�3�0 3t�fb'tl i I ••� � SCL . 7M'* J•.�I?YJSl4 NOiJ!V ddl a?,')OMWOOM n O LA nri f 7VAYI) 3t�fb'tl i Ya<w3�y�J . i n h 8T 7M'* J•.�I?YJSl4 NOiJ!V ddl a?,')OMWOOM n O LA nri f 7VAYI) 3t�fb'tl 7M'* J•.�I?YJSl4 NOiJ!V ddl a?,')OMWOOM n nri f 7VAYI) 7M'* J•.�I?YJSl4 NOiJ!V ddl a?,')OMWOOM n Exhibit 4 SUMMA Y OF ESTIMATED :DISTRICT COSTS Landscape Maintenance Repair/Replacement. Water :electricity Replacement Reserve Subtotal Landscape . Street Trees Public Park Area 1-0 Y 2004-05 ESTIMATED ASSESSMENT A9M0T $8,313.00 $1,050;00 $400.00 $300.00 400.00 $10,463,00 $5,410.00 $0.00 Walls. Revair/Maintenance/Graf tl Control WUO Replacement Reserve $3,000-00 _. Subtotal Walls $35400:00 Subtotal:Operation Costs $19;273.00 DISTRICT ADMINISTRATION COSTS Annual Engineer's Report $4,000.00 Publication$100:00 City Adminis ration Fee $2,000:00 County .Admin. Oration `ee3$ 00:0-0 Est. Total Administration costs $7,000.00 Est. Contin eney $1,391.00 Total Estimated Revenue Required for 20044005. Fiseal Year $27,664.00 Total Appropriation Required from ExWing Fund Balance $0;00 Total Estimated Assessment f� rr 2004«2005 Fiscal. Year $27,664.00 Total dueF 133 Assess.ruent per dueF 520$.00 Maximum Annual Assessment Y -05 MAXIMUM ASSESSMENT ANON $8,31,00 $1,050.00 $400.00 $300.00 400.00 $10,463.00 $5,410.00 $12,430;00 $400,00 000.00 . $3,400.00 $31,703.00 $4,000:00 $100.030 $2,000.40 900.00 EXHIBITS ASSESSMENT ROLL CENTURY MEADOWS ORIE LORI Ctrl OL,Il0AiE1) LANO CAPE` MAINTENANCE ASSESSMENT DISTRICT NO.2 (PURSUANT TO THE LANDSCAPING ANDLIGHTING ACT OF 1972) CITY OF LODI, CA FY 2.0.04«2005 FY 2004-20€5 COUNTY.. ESTIMATED. MAXIMUM: DIAGRAM. ASSESSOR... ASSESSME.W ASSESSMENT NUMBER NUMBER uNiT NO. LOT NO. AMOUNT AMOUNT:: . CenturyMeadows One, 49 058-210-25 Unit No. 3 Lot No. 49 $208M $305.00 Century Meadows One, 50 058-210-25 Unit No. 3 Lot No. 50 $208.00 $305.00 Century Meadows One, 51 058-210-25 Unit No. 3 Lot No, 51 $208.00 $305.00 Century Meadows One, 52 058-210-25 Unit. No. 3 Lot No. 52 $208.00 $305.00 Century. Meadows. One, 53 058-210-25 Unit No. 3 Lot No. 53 $208.00 $305.00 Century !Meadows One, 64 058-210-25 Unit No. 3 Lot No. 54 $208.00 $305.00 Century. Meadows One, 55 058-210-25 Unit Nt. 3 Lot No. 55 $208.00 $305.00 Century. Vl adows One, 56 058520-01 Unit No. 2 Loi No. 56 $208.00 $305.00 Century Meadows One, 57 058-620-02 Unit No. 2. Lot No. 57 $208.00 $305.0{? Century Meadows one, 58 058-520-03 Unit No. 2 Lot No. 58 $208.00 $305.00 Century, Meadows One, 59 058-520"04 Unit Na 2. Lot No. 59 $208.00 $305:0(1 Century. Meadows One, 60 058-520-05 Chit No. 2 Lot No. 60 $208.00 $3[15:Ot1 Century Meadows One, 61 058-520-06 Unit No. 2 Lot No. 61 $208.00 $305.00 Century Meadows One, 62 058-520-07 Unit No 2. Lot No. 62 $208.00 $305.00 Century Meadows One, 63 458-520-48 Unit No 2 Lot No, 63 $208,00 $305.00 Century MeadOW8 One, 64 058-520-09 Unit No. 2 Lot No. 64 $208.00 $305.00 Century. Meadows One, 65 058-520-10 Unit No. 2 Lot No. 65 $208.00 $305.00 Century Meadows. One, 66 058520-11 Unit No..2 Lot No. 66 $208.00 $305.00 Century Meadows One, 67 058-520412 Unit No. 2. Lot No, 67 $208.00 $305,00 Century.Meadows One, 68 058-520-13 Unit No. 2 Leat No. 68 $208.00 $305.00 Century Meadows One, 69 058-520-14 Unit No -2 Lot No. 69 $208.00 $305.00 Century Meadows One, 70 058-520-15 Unit No. 2 Lot No. 70 $208,00 $305.00 p:ltodiV927€301BAUMBACHIIAZZAIASSESS ROLw ICLandscapeZone2lnten€ion x5.xis Page 1 of 6 71 058-520-16 Unit No, 2 Lot No. 71 $208.00 $305.00 Century Meadows.0ne, 72 058-520-17 Unit No. 2 . Lot No, 72 $208,00 $305.00 Century Meadows One, 73 058-520-18 Unit No. 2 Lot No. 73 $208.00 $305.00 Century Meadows One, 74 058-520-19 Unit No, 2 Lot No. 74 $208.00 $305.00 Century Meadows One, 75 058-520-20 Unit No. 2 Lot No. 75 $208.00 $305,00 Century: Meadows One, 76 058-520-21 Unit No. 2 Lot No. 76 $208,00 $305.00 Century Meadows One, 77 056-52022 Unit No.:2 Lot No. 77 $208.00 $305.00 Century Meadows One, 78 058-;520-23 Unit No, 2 Lot No. 78 $208.00 $305,00 Century Meadows One, 79 058-520-24 Unit No. 2 Lot No. 79 $208,00 $305-00 Century Meadows One, 80 058-620-25 Unit No. 2 Lot No, 80. $208,00 $305.00 Century Meadows One, 81 058-520-26 Unit Nq..2 Lot No. 81 $208,00 $305-00 Century Meadows One, 82 058-520-27 Unit No. 2 Lot No. 82 $208.00 $305-00 Century Meadows One, 83 058-520-28 Unit No. 2 Lot No. 83 $208.00 $305,00 Century Meadows One, 84 058-520-29 Unit No. 2 Lot No. 84 $208.00 $305.00 Century.Meodows One, 85 058-520-30 Unit No, 2 Lot No. 86 $208.00 $305.00 Century: Meadows One, 86 058-520-31 L) nit No.: 2 Lot No. 86 $208.00 $305.00 Century Meado ws One, 87 058-620-32 Unit No, 2 Lot No, 87 $208.00 $305.00 Century Meadows One, 88 058-520-33 Unit No. 2 Lot No, 88 $208.00 $305.00 Century Meadows One, 89 058-620-34 Unit No. 2 Lot No. 89 $208.00 $305.00 Century Meadows One, 90 058-520-35 Unit No, 2 Lot No. 90 $208.00 $305.00 Century Meadows One, 91 058-520-36 Unit No. 2 Lot No. 91 $208.00 $305.00 Century Meadows One, 92 058-6.20-37 Unit No. 2 Lot No. 92 $208.00 $305-00 Century Meadows One, 93 05&520-38 Unit No, 2 Lot No. 93 $208,00 $305.00 Century Meadows One, 94 058-520-39 Unit No. 2 Lot No. 94 $208,00 $305-00 Century Meadows One, 95 058-520-40 Unit. No. 2 Lot No. 95 $208,00 $305-00 Century Meadows One, 96 058-520-41 Unit No, 2 Lot No, 96 $208,00 $305.00 Century Meadows One, 97 058-52042 Unit No. 2 Lot No, 97 $208.00 $305.00 p:\Iodi12927001BAUMB.ACH23AZZA\ASSESS ROLL1CLandscapeZone2lntentionEx5.xis. Page 2 of 6 98 058-520-43 Unit No. 2 Lot No, 98 $208.00 $305.00 Century. Meadows. One, 99 058-52044 Unit No, 2 Lot No. 99 $208,00 $305-00 Century. Meadows One, 100 058-520-46 Unit No.:2. Lot No. 100 $208,00 $305.00 Century Meadows One, 101 056-520-46 Unit No. 2 Lot No, 101 $208-00 $305.00 Century Meadows One, 102 058520-47 Unit No. 2 Lot No. 102 $208.00 $305.00 Century Meadows One, 103 058-520-48 Unit No, 2 Lot No. 103 $208.00 $305.00 Century Meadows One, 104 058-520-49 Unit No, 2 Lot No. 104 $208.00 $305.00 Century Meadows One, 105 058-520-50 Unit No. 2 Lot No. 105 $208.00 $305.00 Century :Meadows One, 106 058-620-51 Un it No. 2 Lot No. 106 $208-00 $305,00 Century Meadows One, 107 058-520-52 Unit No. 2 Lot No, 107 $208-00 $305.00 Century Meadows One, 108 058-620-53 Unit No, 2 Lot No. 108 $208.00 $305.00 Century Meadows One, 109 058-520-54 Unit No. 2 Lot No- 109 $208.00 $305.00 Century Meadows One, 110 058-520-55 Unit No. 2 Lot No, 110 $208.00 $305-00 Century Meadows Cone, III 0358-520-56. Uhi . tNo. 2 Lot No. 711 $208.00 $306,00 Century.Meadow.s One, 112 058-520-57 Unit No. 2 Lot No. 112 $208.00 $305-00 Century Meadows One, 113 058-210-27 Unit NO. 3 Lot No. 113 $208.00 $305..00 Century Meadows One, 114 058-210-27 Unit No, 3 Lot No. 114 $208.00 $305.00 Century Meadows One, 115 068-210-27 Unit No. 3 Lot No. 115. $208.00 $305,00 Century Meadows One, 116 058-210-27 Unit N6.3 Lot No. 116 $208.00 $305.00 C.entury.Me. allows One, 117 058-210-27 Unit No. 3 Lot No. 117 $208..00 $305.00 Century Meadows One, 118 058-210.27 Unit No. 3 Lot No. 118 $208.00 $305.00 Century Meadows One, 119 058210-27 Unit No, 3 Lot No, 119 $208.00 $305.00 Century Meadows One, 120 058-210-27 Unit.No, 3 Lot No. 120 $208.00 $305.00 CenturyWeadows One, 121 068-210-27 Unit No. 3 Lot No. 121 $208.00 $306.00 Century Meadows One, 122 058-210-27 Unit No. 3 Lot No. 122 $208-00 $305-00 Century Meadows One, 123 058-210-27 Unit No..3 Lot No. 123 $208.00 $305.00 Century Meadows One, 124 058=210 -27 Unit No. 3 Lot No. 124 $208,00 $30.6.00 pAlodA292700XBAUMBACH31AZ 7WASSESS ROLLCL6ndscapeZone2lntentionEx5.xis Page 3 of 6 FY:20A4-2005 ` FY 2004-2005 COUNTY ESTIMATED MAXINIUW QIAGRAM ASSESSOR ASSESSMENT:.ASSESSMENT NUMOER NUMBER UNITNO. LOT': NO. AMOUNT AMOUNT Century Meadows One, 125 058-210-27 Unit No. 3 Lot No. 125 $208.00 $305:00 Century Meadows One, 128 058-210-27 Unit No, 3 Lot No. 126 $208.00 $305.00 Century Meadows One, 127 058-210-27 Unit No. 3 Lot No. 127 $208.00 $305.00 Century Meadows One, 128 058-2.10-27 Unit No. 3 Lot No. 128 $208.00 $305.00 Century Meadows One, 129 058-210-27 Unit No. 3 Lot No. 129 $208.00 $305,00 Century Meadows One, 130 058-210-27 Unit No. 3 Leat Noy 130 $208.00 $305.00 Century. Meadows One, 131 058-210-27 Unit No. 3 Lot No. 131 $208.00 $305.00 Century Meadows One, 132 058-210-27 Unit No. 3 Lot No. 132 $208.00 $305.00 Century: Meadows One, 133 058-210-27 Unit No. 3 Lot No, 133 $208.00 $305.00 Century. Meadows One, 134 058-210-27 Unit No. 3 Lot No. 134 $208.00 $305.00 Century Meadows One, 135 058-210-27 Unit No.3 Lot No. 135 $208.00 $305.00 Century. Meadows One, 136 058-210-27 Unit No. 3 Lot No. 136 $208,00 $305.00 Century Meadows One, 137 058.210-w27 Unit.No: 3 Lot No. 137 $208.00 $305,00 Century Meadows One, 138 058-210-27 Emit No -3 Lot No. 138 $208.00 $305.00 Century Meadows One, 139 058-210-27 Unit No 3 Lot No. 139 $208.00 $305.00 Century Meadows One, 140 058-210-27 Unit No..3 Lot No. 140 $208.00 $305.00 Century Meadows One, 141 058-210-2.7 Unit No..3 . Lot No. 141 $208.00 $305.00 Century Meadows One, 142 058-210-27 Unit No. 3 Lot No. 142 $208.00 $305:00 Century Meadows One, 143 058-21027 Unit No. 3 Lot Na. 143 $208.00 $305.00 Century Meadows One, 144 058-210-27 Unit No: 3 Lot No. 144 $208,00 $305.00 Century. Mea ows.One, 145 058-210-27 Unita No. 3 Lot No. 145 $208.00 $305.00 Century Meadows One, 148 058-210-27 Unit No. 3 Lot No. 146 $208.030 $305.00 Century Meadows One, 147 058-210-27 Unit No. 3 Lot Not 147 $208.00 $305.00 Century Meadows One, 148 058-21Q-27 Unit.No. 3 Lot No. 148 $208.00 $305.00 Century Meadows One, 149 058-210-27 Unit No. 3 Lot No. 149 $208.00 $305.00 Century Meadows One, 150 058-21047 Unit No.3 Lot No. 150 $208.00 $305.00 Century Meadows One, 151 058-210-27 Unit No. 3 Lot No. 151 $208.00 $305:{10 p:Vodf1292700kBAUMBACH4IAllAIASSESS ROLL\CLandscapeZone2lntentionEx5.xls Page 4 of 6 152 058-210-28 Unit: No. 3 Lot No. 162 $208,00 $305.00 Century Meadows One, 153 055-210-28 Unit No. 3 Lot No. 153 $208.00 $305.00 Century. Meadows One, 154 058-21028 Unit No. 3 Lot No. 154 $208.00 $305.00 Century (Meadows One, 155 058-210-28 Unit No. 3 Lot No. 155 $208.00 $305.00 Century endows One, 156 058-210-28 Unit No. 3 Leat No. 156 $208.00 $305.00 Century Meadows One, 157 058-210-28 Unit No.:3 Lot No. 157 $208.00 $305.00 Century, Meadows One, 158 058-210-28 Unit No, 3 Lot No. 158 $208.00 $305.00 Century Mead ows One, 159 058-210-28 Unit N.P. 3 Lot No. 159 $208.00 $305.00 Century Mdows One, 160 058-210-2.8 Unit No. 3 Lot No, 160 $208.00 $305.00 Century Meadows One, 161 058-210-28 Unit No, 3 Lot No, 161 $208.00 $305.00 Century..Meadows One, 162 05821028 Unit No. 3 Lot No, 162 $208.00 $305.00 Century Meadows One, 163 058-2'1028 Unit No. 3 Lot No. 163 $208.00 $305.00 Century Meadows One, 164 058-210-28 Unit No. 3 Lot No. 164 $208,00 $305.00 Century Meadows One, 165 058-210-28 Unit No.. 3 Lot No. 165 $208.00 $305.00 Century Meadows One, 166 058-210-28 Unit: No. 3 . Lot No. 166 $208.00 $305.00 Century Meadows One, 167 058-210-28 Unit No. 3 Lot No. 167 $208.00 $305.00 Century Meadows One, 168 058-210-28 Unit No.3 Leat No. 168 $208.00 $305.00 Century. Meadows One, 169 058-210-28 Unit No..3 Lot No. 169 $208,00 $305.0:0 Century Meadows One, 170 058-21028 Unit No. 3 Lot No. 170 $208.00 $305,00 Century Meadows One, 171 058-21028 Unit'No. 3 Lot No. 171 $208.00 $305.00 Century Meadows One, 172 058-210-2.8 Unit. No.. 3 Leat No172 $208:00 $305.00 Century Meadows One, 173 058-210-28 Unit No. 3 Lot No. 173 $208.00 $305.00 Century Meadows One, 174 058-210-28 Unit No. 3 ' Lot No. 174 $20&00 $305.00 Century Meadows One, 175 058-21028 Unit No. 3 Lot No. 175 $208.00 $305.00 Century Meadows One, 176 058-210-28 Unit No. 3 Lot No. 176 $208.00 $305.00 Century Meadows One, 177 058-21028 Unit 'No, 3 List N4. 177 $208.00 $305.00 Century Meadows One, 178 058-21028 Unit No. 3 Lot No. 178 $208.00 $305.00 p:lLodi\292700\SAUMBACH51AZZA1,ASSESS ROLLCLsndscapeZone2intentionEx5,zfs Page 5 of 6 FY 2004-2005 FY 2004-2005 COUNTY ESTIMATED MAXIMUM DIAGRAM ASSESSOR ASSESSMENT ASSESSMENT - NUMBER NUMBED UNIT NO, LOT NO. AMOUNT —AMOUNT Century Meadows One, 179 058-2.10-28 Unit No. 3. Lot Net. 179 $208.00 $305.00 Century' Meadows Carte, 980 058-210-28 Unit No. 3 Lot No. 180 $208.00 $305.00 Century Meadows qne, 181 058-210-28 Chit No. 3 Lot No. 101 $208.00 $305.00